Council archive · source document
07/2104 - Operational Works - Landscaping, Access, Car Parking, Storm Water, Frontage Works, Excavation, Erosion & Sediment [As Published] · 142007.2104
If telephoning or calling please ask for: | woMESeN state Sas Email: [email protected] 4 mM COUNCIL Application Ref: 2005/2302 Your Ref: 1 June 2007 Parish Clarke Architects PO Box 4153 ST LUCIA SOUTH QLD 4067 Dear Sir/Madam, ~ Re: Application for a Development Approval for Material Change of Use for Duplex Dwelling situated at 29 Ventura Street, Sunrise Beach described as Lot 124 RP 132134 | @ { refer to your application and advise that on 31 May 2007 Council decided to: A. — Approve the application and grant a Development Permit, subject to conditions. B. Approve the application despite its conflict with the Transitional Planning Scheme } for the following reasons: 1. The applicant actéd -in good faith gby- complying’ with the plot ratio cee oo . “ requirements“of-0.5:1- of the ‘draft- N66Sa*Plans which-had been: publicly ~- ~-- advertised at the time of the application was lodged. 2. The propose development is unlikely to have a significant adverse impact on the amenity of the area. .. 3. No submissions were received objecting to the proposal. Details of the decision are contained in the attached Decision Notice. ‘ ww , Please note that an Infrastructure Charge in accordance with the Coastal Major Road @ Network Infrastructure Charges Plan has been triggered by the approval of this development application. An Infrastructure.Charge Notice is attached in compliance with Chapter 5 of the Integrated Planning Act 1997. You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Integrated Planning Act is also attached. During the appeal period, you as the applicant may. make written representations to Council about the conditions contained within the.development approval. If Council agrees with the répresentations, a “negotiated decision notice” will be issued. Only one “negotiated decision: notice” may be given. Taking this step will defer your appeal period, which will continue after Council makes its“decision. (Sections 3.5.17 and 3.5.18 of the Integrated Planning Act refer). . ‘ award Winner= Aistralian Clean Beach— NOOSA COUNCIL x. i" ae . - ABN 97 959 214 125 Challenge 2004 Litter Prevention 9 Pelican Street Tewantin PO Box 141 Tewantin Q 4565 Phone: 07 5449 5200 Fax: 07 5447 1062 + Email: mailharnnncs ald ne ac :
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2104 - Operational Works - Landscaping, Access, Car Parking, Storm Water, Frontage Works, Excavation, Erosion & Sediment [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.