Council archive · source document
07/2104 - Operational Works - Landscaping, Access, Car Parking, Storm Water, Frontage Works, Excavation, Erosion & Sediment [As Published] · 142007.2104
INTEGRATED PLANNING ACT 1997 State-controlled road matters For-more information refer to Guide 3. Unlessyou:answered none ofthe ‘above’ to 02, “the application triggers referral to the Department of Main Roads (DMR) as a referral agency. In certain circumstances DMRwill agency, while in- other “circumstan be a concurrence‘agency. ‘Schedule 2 of the IP. Regulation will assist you 0 ‘determine where OMRi is an advice or” concurrence: agency ‘for-the application. . : . IDAS Assessment Checklist, Version 20, 2 April 2007 2: The application involves: (tick applicable box/es) : (11 ())_ development on land contiguous‘ to a State controlled road and for - fl (a) material change of use assessable against the planning scheme, J (b) reconfiguring a fot unless - *- @ the total number of lots is not increased; and « the total number of fots abutting the State-controlled road is not increased; C1 (©) operational work (not associated with a material change of use assessable against the planning scheme or reconfiguring a lot mentioned in (b) above)- « associated with access to a State-controlled road; or for filling or excavation; or + involving the redirection or intensification of site stormwater from the land, through a pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a State-controlied road. C (ii) development on land-not contiguous to a State-controlled road and - C1 (a) material change of use - * assessable against the local government's planning scheme; and + mentioned in schedule 5 of the IP Regulation and exceeding the thresholds. set by that schedule; (2 (b) reconfiguring a lot for a purpose mentioned in schedule 5 of the IP regulation = and exceeding the thresholds set by that schedule; . (O(c) operational work (not associated with a material change of use assessable agains aD planning scheme or reconfiguring a lot mentioned in (b) above}- * assessable against the local government's planning scheme; and * mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by “that schedule. C (ili) none of the above : Clearing vegetation ar For more informationfefer to.Guide’ 12. Unless you answered “none of the above” to Q3, the application requires assessment by the. ‘Department of. Natural Resources and Wale " (NRW). ; If an agenicy other than NRW is the agsessment, manager for the application, NRW isa . .concurrence agency for the application in relation to this matter. Mf you ticked-Q3(i) or (ii), your application requires referral to. NRW for assessment regardless of © | whether vegetation clearing is proposed or not. . The application-involves: (tick applicable box/es) (i) . material change of use - (a) assessable against the planning scheme; (b) on alot containing - * acategory 1, 2 or 3 area shown on-a property map of assessable vegetation; or + ifthere is no property map of assessable vegetation for the lot - remnant vegetation; (c) where the existing use of the land is a rural or environmental use; and (d) where the size of the land is 2 hectares or larger - + complete Part J of Form 4 DI (ii) reconfiguring a lot - (a) on alot containing a category 1, 2 or 3 area shown on a property map of “assessable vegetation or, if there is no property map of assessable vegetation for, the lot, remnant vegetation; @ (b) -where the size of the lot before the reconfiguration is 2 hectares or larger; (c) where 2 or more lots are created; and (d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form C1 (iii) operational work- - . : (a) for the clearing of native vegetation where the vegetation clearing is made assessable under Schedule 8 of the IPA; and (b) not associated with a material change of use assessable against the planning scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of Form C1 (iv) none of the above. Strategic port land For more information refer to Guide 14. If you ticked (i) - the relevant Port Authority is the assessment manager for the application. . Ifyou ticked (ii) Queensland Transpoit isa concurrence agency for the application. |4. The application involves: C1 (i) development on strategic port land as defined in the Transport infrastructure Act 1994 (Tl Act) - complete Part | of Form 1 CO (i) a material. change of use that is inconsistent with the land use plan approved under the TI Act for the strategic port land - complete Part | of Form 1 & (it) none of the above 4 Land contiguous fo a State-controlled road is defined in schedule 14 of the IP Regulation to mean land - if pat of the fand is within 100m of the State-controlled road; 0 or that is part of a future State- controlled road. Page 2 |
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2104 - Operational Works - Landscaping, Access, Car Parking, Storm Water, Frontage Works, Excavation, Erosion & Sediment [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.