Ecological Assessment Report
Ecological Assessment Report
5 Proposed Development Impact Assessment
5.1 Impact and Mitigation Measures
The proposed development and associated impacts have been located to minimise impacts to native vegetation and habitat/wildlife movement corridors.
Potential impacts on ecological values on the site are direct and indirect in nature and are listed in table 4, along with mitigation measures proposed by the
development to reduce the potential ecological impacts.
Table 4: Summary of potential impacts and associated mitigation measures.
Potential Impacts Mitigation measures
Planning and Design Phase
• Removal of some vegetation is required from site, resulting in the • The development layout has been designed and located to minimise removal of
loss of ecological values including foraging and habitat canopy trees, native vegetation and non-juvenile koala habitat trees as much as
resources. possible. Where removal of canopy vegetation is required, environmental offsets
can be provided along with wildlife nesting boxes if necessary.
• Loss of potential breeding habitat and resources, including future
breeding habitat. • Financial offsets can be provided if conditioned by Council, in accordance with the
Environmental Offsets Act 2014.
Construction and Clearing Phase
• Potential injury and mortality of fauna due to vegetation clearing. • The construction contractor shall take all reasonable and practicable management
This includes direct mortality, injury or orphaning of wildlife measures to avoid environmental harm and environmental nuisance to native fauna
because of vegetation clearing and indirect impacts such as and known fauna habitat and breeding places.
displacement and dispersal into adjacent habitats that may be at
their carry-capacity.
PR22116_EA_178 Davis Rd, Cootharaba Page 25
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.