Ecological Assessment Report
Ecological Assessment Report
4. ecological linkages and ecologically important
areas are secured by environmental covenant
or transferred to public ownership or through
gazettal of a nature reserve.
Management of Impacts
PO3 Development is designed and sited to AO3.1 Complies with PO3
manage adverse impacts on ecologically
Where clearing of vegetation cannot be practicably The proposed dwelling and shed has a footprint of
important areas by:
avoided, the development: around 863m2, most of which is covered by the
1. minimising the total footprint ‘Area of Biodiversity Significance’ overlay. The
1. ensures the design and siting limits the loss
within which all activities, bushfire APZ has a footprint of 5,823m2,
of vegetation to the smallest extent
buildings, structures driveways consisting of an inner protection area of 1,905m2
possible;
and other works are contained; (full vegetation clearing) and an outer protection
2. protects and retains ecological values and area of 3,918m2 (understorey clearing only,
2. locating development in existing
ecosystem processes to the greatest retention of canopy vegetation). which is all
cleared areas or areas of low
extent possible within and adjacent to the vegetated with canopy vegetation. The dwelling
ecological value over other areas
site; has been located in an area that is on the outer
to the greatest extent possible;
3. provides measures to allow for safe edge of the remnant vegetation patch, and is
and
movement of fauna through the site; and already partly cleared and degraded (mown grass
3. incorporating siting and design understorey, limited canopy vegetation), to
measures to protect and retain 4. provides suitable habitat replacement and
minimise vegetation clearing and the impact of the
ecological values and ecosystem replanting in accordance with PSP3
proposal on the ecological values and functions of
processes within or adjacent to Ecological Assessment Guidelines.
the site. It does not impact upon the core habitat
the development site; and AO3.2 values of the property and it does not interfere with
4. where adverse impacts have the ecological corridor functions of the property.
Habitat trees, recruitment habitat trees, and
been minimised, any residual roosting, breeding and feeding areas are protected Compensatory planting can be provided on site if
impacts on ecological values are for native fauna habitat. conditioned by Council. The site does contain
compensated for through come existing cleared areas at the northern end.
PR22116_EA_178 Davis Rd, Cootharaba Page 31
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.