                                                                                          2009/1382



      Sunshine Coast Regional Council’s CEO may request further controls to be installed should
      approved measures be inefficient.
21.     The owners of the subject property shall maintain the grease/oil arrestor pits/gross pollutant
        traps in accordance with the manufacturers specifications.
22.     The owners of the subject property shall inspect the gross pollutant traps on a weekly basis
        and after each storm event.
        The owners of the subject property shall enter into an ongoing maintenance contract with a
        Registered Contractor to clean and maintain the gross pollutant traps on regular three monthly
        cycles and on an “On Call” basis in the case of an emergency.
        The management and maintenance of the gross pollutant traps shall be included in the
        Community Management Scheme for the completed development.
23.     Prior to acceptance of civil works to become Council assets "On Maintenance", the lodgement
        of satisfactory “As Constructed” records shall be submitted to Council.
        As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer
        (RPEQ) for design intent, and a Licensed Surveyor shall certify the cadastre and the location,
        level and type of all services and structures. This information shall be submitted to Council for
        checking and for Council’s records.
        The data must fully detail levels for all engineering works including, but not limited to, drainage
        structures, finished ground levels and pavement surface levels. The data shall be submitted in
        the Asset Design and As Constructed (ADAC) digital format. Guidelines on the use of ADAC
        are available at www.adac.com.au and Council’s “Noosa Planning Scheme Policy 5 –
        Engineering Design Standards – Roads, Drainage and Earthworks”.
        Approval of works shall not be granted until all As Constructed information has been supplied
        and accepted by Council.
24.     A 5% cost of works to become Council assets or $1,500 bond (whichever is the greater) will
        be imposed on construction works during the maintenance period, which is a minimum period
        of 12 months duration. Such bond must be lodged by, and shall only be accepted from the
        Developer for the works.
25.     The works to become Council assets will not be accepted "On Maintenance" until the
        landscaping is completed.
26.     These works are also to be in compliance with the relevant conditions of Development Permit
        No. 2007/2174.
27.     Notwithstanding that Council has checked the plans with due care, where it is found during
        construction that variations from Council's standards exist, then Council standards shall apply.
WATER SUPPLY AND SEWERAGE CONDITIONS
28.     The existing sewer main within the development site must be capped 1.5 metres from the
        existing sewer manhole. This work must be undertaken by Sunshine Coast Water at the
        applicants cost.
29.     Proposed tree plantings must maintain a minimum horizontal clearance of 1.5 metres from
        Council sewerage infrastructure. Landscaping plants within these clearances must be low
        growing when mature and suitable Council approved varieties.
30.     Stormwater retention systems and gross pollutant traps must maintain a minimum of 1.5
        metres horizontal clearance from Council sewerage infrastructure and 1.0 metre from the
        sewer house connection.
31.     A water service, in accordance with the hydraulic engineers requirements, must be installed
        from the existing water main in Elanda street to the property boundary.
32.     A water supply enveloper pipe shall be provided under Elanda Street, if required, in
        accordance with Sunshine Coast Water requirements.
                                                                                         Page 4 of 9




                      This page was created using easyPDF SDK trial software.
                     To purchase, go to http://www.bcltechnologies.com/easypdf/

Used in these records

About this file

File size
69 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2009.00001382.001 [As Published].pdf · 69 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.