P01 DEVELOPMENT MINIMIZES ENERGY CONSUMPTION AND THE PRODUCTION OFGREENHOUSE GAS EMISSIONS
P01 PROPOSED OUTCOME
THE DEVELOPMENT WILL REDUCE THE ENERGY NEEDED FOR IN-USE BUILDING BY UTILIZING THE FOLLOWING:
• MODERN ENERGY EFFICIENT ELECTRIC COOKING
• HEAT PUMP HOT WATER SYSTEM
• SPLIT SYSTEM AIR CONDITIONING
• WALL AND ROOF INSULATION ABOVE MINIMUM REQUIREMENTS
PO2 DEVELOPMENT MAXIMIZES WATER EFFICIENCY ON SITE BY INCORPORATING RAINWATER COLLECTION AND REUSE MEASURES FOR NON-POTABLE PURPOSESSUCH AS
IRRIGATION.
P02 PROPOSED OUTCOME
A STORMWATER MANAGEMENT PLAN FOR THE DEVELOPMENT IS INCORPORATED. REFER ENGINEERING
PO3 DEVELOPMENT REDUCES STORMWATER RUN-OFF BY MINIMISING IMPERVIOUSAREAS AND MAXIMISING SITE VEGETATION TO ABSORB WATER ON SITE.
P03 PROPOSED OUTCOME
DEVELOPMENT INCORPORATES WATER SENSITIVE URBAN DESIGN MEASURESTO MANAGE STORMWATER.
PO4 DEVELOPMENT LIMITS CHANGES AND DISTURBANCES TO THE SITE TOPOGRAPHY TO PRESERVE EXISTING DRAINAGE CHANNELS AS MUCH ASPOSSIBLE.
P04 PROPOSED OUTCOME
DEVELOPMENT INCORPORATES AN EXSISTING CREEK WHICH WILL RETAINED AND THE BANKS OF WHICH WILL BE REHABILITATED AND EQUATED TO 32% OF THE
SITE AREA..
PO5 DEVELOPMENT MINIMISES HARD SURFACE AREAS THAT REFLECT OR STORE HEATAND MAXIMISES VEGETATION AND SOFT LANDSCAPING.
P05 PROPOSED OUTCOME
DEVELOPMENT INCORPORATES APPROX. 3750m² OF SOFT LANDSCAPING THAT EQUATES TO 50% OF THE SITE
PO6 VEGETATION IS INCORPORATED INTO THE BUILDING DESIGN TO CREATE SHADE AND COOLING AROUND BUILDINGS
P06 PROPOSED OUTCOME
EACH UNIT INCORPORATES A GARDEN AT THE ENTRANCE AND REAR TO SHIELD AND SHADE THE UNIT.
PO7 DEVELOPMENT AND BUILDING SITING IS RESPONSIVE TO NOOSA SHIRE’S SUB-TROPICAL CLIMATE AND THE SITE’S CHARACTERISTICS INCLUDING TOPOGRAPHY,
ORIENTATION, EXISTING VEGETATION AND PREVAILING WINDS.
P07 PROPOSED OUTCOME
• ALL DWELLINGS INCORPORATE A INTEGRATED GENEROUS INDOOR OUTDOOR COVERED PRIVATE PATIO IN RESPONSE TO THE
NOOSA SHIRE'S SUB TROPICAL CLIMATE.
• THE DWELLINGS ARE ELEVATED FOR FLOOD PROTECTION FROM HEAVY SUB TROPICAL RAINFALL.
• THE SITE IS SITUATED ON A SLOPE ADJACENT TO A CREEK, THE BUILT FORM IS LOCATED TO UTILIZE THE LEVEL SECTION OF THE SITE
AND PROVIDE LEVEL ACCESS TO ALL DWELLINGS.
• THE DEVELOPMENT HAS BEEN ORINTATED TO MAXIMISE THE VIEW TO MOUNT COROORA AND THE ADJACENT CREEK. UNITS 1-7 HAVE
PRIVATE OUTDOOR SPACE ORINTATED TO THE NORTH.
• EXISTING VEGETATION WILL BE RETAINED WHERE POSSIBLE UNDER ADVISE FROM EXPERT CONSULTANTS AND THE EXISTING CREEK
WILL BE REHBILATED AND REVEGETATED.
• PREVAILING WINDS IN POMONA ARE RELAVTIVELY LOW MAINLY FROM THE NORTH AND WEST DIRECTIONS. THE UNITS HAVE BEEN
DESIGNED TO CATCH THE PREVAILING WINDS TO AID IN VENTILATION.
PO8 DEVELOPMENT -
(A)ORIENTATES BUILDINGS AND WINDOWS TO MAKE THE MOST OFPREVAILING WINDS, NATURAL VENTILATION AND CROSS BREEZES;
(B)MAXIMISES SHADE TO EAST AND WEST WALLS;
(C)CONTAINS AN OPEN AND PERMEABLE BUILT FORM THAT CONNECTSINDOOR AND OUTDOOR SPACES IN AN INTEGRATED DESIGN;
(D)RETAINS EXISTING VEGETATION AND NATURAL SHADING WHEREPOSSIBLE;
(E)INCORPORATES PASSIVE BUILDING DESIGN TO REDUCE THE NEED FORAUXILIARY HEATING AND COOLING;
(F) USES LOW TOXIC INTERNAL AND EXTERNAL BUILDING MATERIALS;
(G)USES NATURAL LIGHT RATHER THAN ARTIFICIAL LIGHT, AND MAY INCLUDESKYLIGHTS, ATRIUMS AND LIGHT WELLS;
(H)CONTAINS A MINIMUM OF TWO OPENINGS PER HABITABLE ROOM;
(I) PROVIDES A MINIMUM FLOOR TO CEILING HEIGHT OF 2.7 METRES; AND
(J) ENABLES EFFICIENT OPERATION AND USE OF THE BUILDING.
P08 PROPOSED OUTCOME
REFER TYPICAL FLOOR PLANS
Address: No. Issue Details Date
Client: Drawing Name:
BUILDING DESIGN 28 Revision 28 07-08-2022
AUSTRALIA WIDE Zaccale Pty Ltd 11C Church Street, Pomona QLD 4568 31 REDESIGN 30-09-2022 SUSTAINABLE BUILDING DESIGN
RESIDENTIAL
COMMERCIAL
32
33
SANDSTONE RETAINING
DRAIN REFERENCE
04-10-2022
05-10-2022
RESPONSE
RENOVATIONS 34 SANDSTONE RETAINING 05-10-2022
ACCESSIBLE Project number 11808
PH. 0405 097 553
Project: Property Details: 35 ENGINEERING REDESIGN 22-11-2022
38 REDESIGN 18-05-2023
[email protected]
www.alldd.com.au Residential Multi Unit Development LOT 4 SP301620 7517m² 40 FENCING 19-05-2023
Current Issue Date 19-10-2023
VBA DP-AD 37989 42 AMENDMENTS 12-06-2023 Scale (A3) 1 : 100
QBCC 1084590 43 CONDITIONS REVIEW 25-07-2023
BDAA 6779 Drawing no. PA109
Status: DA CONDITIONS
THIS DRAWING IS THE COPYRIGHT AND PROPOERTY OF ALL DESIGN AND
44 DA CONDITIONS 19-10-2023
DRAFTING. IT IS NOT TO BE COPIED, RETAINED OR USED FOR ANOTHER PURPOSE.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.