Sandpiper Planning Report 090915 · 132007.1181.02
Attached to the e-mail 132007.1181.02 Change to existing approval.
MCU to establish Industrial Business (Type 2 Production, alteration,
Change repackaging
to Development
and repairing)
Approval
Lot 11 Gateway
Sandpiper Hastings Drive, Noosaville
St, Noosa Heads
Change to Development Approval
7. State Planning Interests Sandpiper Hastings St, Noosa Heads
The only matter raised within state planning instruments is whether the development complies with criteria in
s 367 of the Sustainable Planning Act with respect to a permissible change of a development approval. The
table below discusses the compliance with each of the relevant criteria.
Permissible Change Criteria Assessment Complies
The change to the approval The proposal is for minor structural Yes
would not result in a modifications to increase the utility of the
substantially different premises for the approved use.
development
If the application for the The proposal requires only assessment of Yes
approval were remade the amenity and aesthetics and compliance with
change would not require Planning Scheme performance criteria and
referral to additional requires no consideration of external agencies
concurrence agencies
If the application for the The existing Material Change of Use Approval Yes
approval were remade the required impact assessment.
change would not be for an
approval for assessable
development that previously
did not require impact –
require impact assessment
If the application for the The minor change to roof-line to facilitate the Yes
approval were remade the practical utilisation of the roof top terrace is
change would not be for an within the permissible site lines and was
approval for assessable within the height limitations of the scheme at
development that previously the time. The change from the approved ‘soft’
required impact assessment— to a ‘hard’ roof in a location unlikely to be
be likely, in the responsible viewed by neighbouring properties is unlikely
entity’s opinion, to cause a to have been cause for objection.
person to make a properly
made submission objecting to
the proposed change, if the
circumstances allowed
If the application for the The minor architectural modifications to Yes
approval were remade the facilitate a consistent use meet the general
change would not cause desired outcomes for the zone, while the
development to which the building height in storeys does not meet one
approval relates to include any of the specific outcomes it is a matter of code
prohibited development. relaxation, not prohibition.
8. SEQ Regional Plan
The subject site is located within the Urban Footprint of the South East Queensland Regional Plan. The
proposed use is consistent with the SEQ Regional Plans intent for the urban footprint.
14
SAN VER 090915
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Sandpiper Planning Report 090915.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.1 MB (small file)
- File type
No other editions are linked here.