Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

DAForm2-Buildingworkdetails_Pomona_forBP

Attached to the e-mail Operational Works Application OP"W22/0174 - DA Form 1 & 2 - Plans - 25 Railway Pde, Pomona.

of 6

Page text shows just the words. Original shows the document exactly as it was published.

PART 7 – FOR COMPLETION BY THE ASSESSMENT MANAGER – FOR OFFICE
USE ONLY

 Date received:                                Reference numbers:

 For completion by the building certifier
 Classification(s) of approved building work

 Name                                                        QBCC Certification Licence    QBCC Insurance receipt
                                                             number                        number



 Notification of engagement of alternative assessment manager
 Prescribed assessment manager
 Name of chosen assessment manager
 Date chosen assessment manager engaged
 Contact number of chosen assessment manager
 Relevant licence number(s) of chosen assessment
 manager

 Additional information required by the local government
 Confirm proposed construction materials:
                                            Double brick                   Steel                     Curtain glass
 External walls                             Brick veneer                   Timber                    Aluminium
                                            Stone/concrete                 Fibre cement              Other
                                            Timber                         Steel                     Aluminium
 Frame
                                            Other
 Floor                                      Concrete                       Timber                    Other
                                            Slate/concrete                 Tiles                     Fibre cement
 Roof covering
                                            Aluminium                      Steel                     Other

 QLeave notification and payment
 Note: For completion by assessment manager if applicable
 Description of the work
 QLeave project number
 Amount paid ($)                                                    Date paid (dd/mm/yy)
 Date receipted form sighted by assessment manager
 Name of officer who sighted the form

 Additional building details required for the Australian Bureau of Statistics
 Existing building use/classification? (if applicable)
 New building use/classification?
 Site area (m2)                                                     Floor area (m2)




                                                                                                                        Page 6
                                                                                               DA Form 2 – Building work details
                                                                                                 Version 1.2— 7 February 2020
Log in to download the original file

DAForm2-Buildingworkdetails_Pomona_forBP.pdf · 222 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.