Council archive · source document
WHS Management Plan Ozcare Noosa RACF WC OHS 002 Rev 23 4 July 2023 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy · OPW24/0118
Plans and drawings: the text below has words only, no drawings.
WHS Management Plan Ozcare Noosa RACF WC OHS 002 Revision 023 4 July 2024 [OCR of page images] woollam CONSTRUCTIONS WHS Management Plan Ozcare Noosa RACF WC OHS 002 Revision 023 4 July 2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 61 pages
Page 2
Contents
Plan Approval ................................................................................................................................................. 6
1. WHS Management ....................................................................................................................... 7
1.1 WHS Management Manual ...................................................................................................................... 7
1.2 WHS Management Plan ........................................................................................................................... 7
1.3 Legal Requirements Register.................................................................................................................... 9
2. Project Hazard/Risk Register .................................................................................................... 11
2.1 Supporting Documents........................................................................................................................... 11
3. Risk Assessment ............................................................................................................................ 12
Risk Matrix.................................................................................................................................................... 13
3.1 Supporting Documents........................................................................................................................... 14
4. Safe Work Method Statement Register ................................................................................. 15
4.1 Supporting Documents........................................................................................................................... 16
5. Site Safety Rules ......................................................................................................................... 17
5.1 Site Entry Requirements......................................................................................................................... 17
5.2 Prestart ................................................................................................................................................... 17
5.3 Safe Work Method Statements .............................................................................................................. 17
5.4 Personal Protection Equipment ............................................................................................................. 17
5.4.1 Head Protection .................................................................................................................................. 17
5.4.2 High Visibility ....................................................................................................................................... 18
5.4.3 Eye Protection ..................................................................................................................................... 18
5.4.4 Hearing Protection .............................................................................................................................. 18
5.4.5 Respiratory Protection ........................................................................................................................ 18
5.4.6 Foot Protection.................................................................................................................................... 18
5.4.7 Hand Protection .................................................................................................................................. 18
5.4.8 Sun Protection ..................................................................................................................................... 18
5.5 Alcohol and Drugs .................................................................................................................................. 18
5.6 Amenities ............................................................................................................................................... 19
5.7 Plant Operation ...................................................................................................................................... 19
5.8 Electrical ................................................................................................................................................. 19
5.9 House Keeping........................................................................................................................................ 19
5.10 Interference with Safety Measures ...................................................................................................... 20
5.11 Safety Incidents .................................................................................................................................... 20
5.12 Ladders ................................................................................................................................................. 20
WHS Management Plan / Page 2
Page 3
5.13 Grinders ................................................................................................................................................ 20
5.14 Scaffolding ............................................................................................................................................ 20
5.15 Equipment / Calibration Records ......................................................................................................... 20
6. Common Plant and Equipment .................................................................................................. 22
6.1 Supporting Documents........................................................................................................................... 22
7. Health Surveillance and Exposure Monitoring........................................................................ 23
7.1 Supporting Documents........................................................................................................................... 23
8. Hazardous Substance and Dangerous Goods Register .......................................................... 25
8.1 Supporting Documents........................................................................................................................... 25
9. Emergency Preparedness and Response Plan ..................................................................... 26
9.1 Supporting Documents........................................................................................................................... 26
10. Evacuation Diagram...................................................................................................................27
10.1 Supporting Documents ........................................................................................................................ 27
11. Site Diary .................................................................................................................................... 28
12.Weekly Safety and Environmental Site Inspection ............................................................... 29
13. Site Induction.............................................................................................................................. 31
13.1 Supporting Documents ........................................................................................................................ 31
14. Incident Investigation Report ................................................................................................. 32
14.1 Supporting Documents ........................................................................................................................ 32
15. Incident Notification................................................................................................................. 33
15.1 Supporting Documents ........................................................................................................................ 33
16. Hazard Report Form ................................................................................................................. 34
16.1 Supporting Documents ........................................................................................................................ 34
17. Daily Pre-start Minutes ............................................................................................................ 35
17.1 Supporting Documents ........................................................................................................................ 35
18. Toolbox Talk Minutes ............................................................................................................... 36
18.1 Supporting Documents ........................................................................................................................ 36
19. Safety Interactions.................................................................................................................... 37
20. HSE Planning Tool ..................................................................................................................... 38
21. Safety Task Observations.......................................................................................................... 40
22. Emergency Drill Evaluation ....................................................................................................... 41
22.1 Supporting Documents ........................................................................................................................ 41
23. Site Personnel Sign In ............................................................................................................... 42
24. Consultation, Cooperation and Coordination ...................................................................... 43
24.1 Supporting Documents ........................................................................................................................ 43
25. Statement of Responsibilities ................................................................................................. 44
WHS Management Plan / Page 3
Page 4
26. OHS Training .............................................................................................................................. 47
26.1 WHS Management Plan Training ......................................................................................................... 47
26.2 Safe Work Method Statement Training ............................................................................................... 47
26.3 Recognition of Contract Partner’s Competency ................................................................................... 47
26.4 Supporting Documents ........................................................................................................................ 47
27. Incident Management .............................................................................................................. 48
28. Mobile Plant............................................................................................................................... 49
28.1 Mandatory Mobile Plant Inspections ................................................................................................... 49
28.2 Operator Qualifications ........................................................................................................................ 50
28.3 Supporting Documents ........................................................................................................................ 51
29. High Risk Work .......................................................................................................................... 52
29.1 High-Risk Construction Work ............................................................................................................... 53
30. Electrical ..................................................................................................................................... 54
30.1 Electrical Equipment Lock Out ............................................................................................................. 54
30.2 Electrical Isolation ................................................................................................................................ 54
30.3 Supporting Documents ........................................................................................................................ 55
31. Work Permit Systems ................................................................................................................ 57
32. Temporary Works Register ..................................................................................................... 58
32.1 Supporting Documents ........................................................................................................................ 59
33. Management Systems Policy .................................................................................................. 60
34. APPENDICES ................................................................................................................................. 61
Appendix 1 – Project Hazard/Risk Assessment ........................................................................... 62
Appendix 2 – Emergency Evacuation Diagrams .......................................................................... 63
Appendix 3 – WHS Management Manual .................................................................................... 64
WHS Management Plan / Page 4
Page 5
Project Details
Project Name: Ozcare Noosa RACF
Project Address 80 Cooyar Street, Noosa Heads, QLD, 4567
Project Number:
Principal Contractor: Woollam Constructions
Principal Contractor ABN: 94 009 676 064
Principal Contractor 71 Lytton Road
Address: East Brisbane QLD 4169
Nominated QBCC Supervisor Bryan Ward
Client: Ozcare
Client Representative Name: Tony Barnett
Company: Ozcare
Contact details: [email protected]
07 3028 9004
Building Scope
External Walls Material: Block, Metal Frame, Cladding
Internal Walls Material: Metal Frame, Plasterboard
Building Construction
Floors Material: Concrete, Ceramic Tile, Vinyl, Carpet
Ceilings Material: Plasterboard
Basement: N/A
Floor Areas Ground: 4560m2
Levels: 2580m2
Neighbouring Facilities N/A
Remote / Isolate Project No
Start Date Approx. 07/2024
Completion Date -
Expected Completion Date Approx. 08/2027
The construction works would generally be undertaken during standard
Hours of Operation construction hours, being:
7:00 am to 6:30 pm Monday to Friday
WHS Management Plan / Page 5
Page 6
7:00 am to 2:00 pm Saturdays
Non works on Sunday or Public Holidays
After hours contact details will be displayed on the Woollam site entry
banner located adjacent to the vehicle and/or pedestrian site access
point.
Plan Approval
This WHSMP will be reviewed and approved by the Project Manager, Site Manager, Site HSE Adviser / Regional
HSE Coordinator and HSEQT Manager before it can be implemented.
Role Name Signature Date
HSEQT Manager: TBA
Project Manager: Bryan Ward
Site Manager: TBA
Site Foreman: Richard Robazza
Site HSE Adviser TBA
Regional HSE
TBA
Coordinator:
WHS Management Plan / Page 6
Page 7
1. WHS Management
1.1 WHS Management Manual
It is a generic document outlining the WHS Measure Woollam implements as a business. A hard copy of the
document will be included with the develop of each WHS Management Plan.
1.2 WHS Management Plan
The WHS Management Plan is a generic document that is amended according to the site-specific health and
safety requirements of each construction project.
A copy of the WHS Management Plan will be sent to all contracted Contract Partners prior to them mobilising
to site for their review. All workers will be informed of the contents of the WHS Management Plan during their
site-specific induction. All amendments to the plant, during the project construction, shall be communicated to
all workers at the next available Pre-start Meeting.
A review of the WHS Management Plan will be conducted by the respective Regional HSE Coordinator when
they are conducting a Site Review. The Site Review will be conducted at least six (6) times during a calendar
year and will be recorded in Procore utilising the Site Review Checklist.
Amendments to the Workplace Health and Safety Management Plan including all relevant details will be
recorded on the Table below.
See Appendix 3 for the WHS Management Manual
WHS Management Manual Amendments Record
Revision Date Revision Details
15/10/2022 Minor amendments
Additional RCS controls and Dust Management Plan inclusion. Additional COP in
08/03/2023
formation
02/01/2024 Minor Procedural Changes
05/03/2024 Inclusion of separate Hazard / Risk Register as a standalone document.
WHS Management Plan Review
Date Name Role Signature
15/10/2022 Cameron Stewart HSEQT Manager
22/02/2023 Cameron Stewart HSEQT Manager
WHS Management Plan / Page 7
Page 8
21/03/2023 Cameron Stewart HSEQT Manager
01/06/2023 Cameron Stewart HSEQT Manager
01/09/2023 Cameron Stewart HSEQT Manager
01/12/2023 Cameron Stewart HSEQT Manager
01/01/2024 Cameron Stewart HSEQT Manager
05/03/2024 Cameron Stewart HSEQT Manager
WHS Management Plan Induction Record
Name Position Role Signature Date
*Ensure training module on Woollam Connect has been completed.
WHS Management Plan / Page 8
Page 9
3.1 Supporting Documents
Risk Assessment Template
WHS Management Plan / Page 14
[OCR of page images]
3.1 Supporting Documents
Risk Assessment Template
woollam fi WORKING TOGETHER WHS Management Plan / Page 14
CONSTELCTICN t ;
Page 10
1.3 Legal Requirements Register
The Legal Requirements Register, below, is to be completed by the Regional HSE Coordinator during the
Project Start Up Meeting to identify the health and safety legislation, codes of practice and Australian
standards relevant for the scope of works for this project. (Remove non-relevant documents from table below)
Legislation and Other Legal Requirements
Queensland WH&S Act 2011 NSW WH&S Act 2017
Queensland WH&S Regulation 2011 NSW WH&S Regulation 2017
Environmental Protection Act and Regulation Induction for Construction Work – National CoP
Electrical Safety Act 2002 (Qld) Hazardous Manual Tasks CoP
Electrical Safety Legislation 2002 (Qld) How to Safely Remove Asbestos CoP
Electrical Safety CoP 2010 – Working near overhead How to Manage and Control Asbestos in the Workplace
and underground services (Qld) CoP
Electrical Safety CoP 2013 – Managing Electrical Risks Work Health and Safety Consultation, Co-operation,
in the Workplace (Qld) and Co-ordination CoP
Electrical Safety CoP 2010 – Works (Qld) How to Manage Work Health & Safety Risks CoP
Managing the Risks of Hazardous Chemicals in the
Managing Electrical Risks at the Workplace CoP (NSW)
Workplace CoP
Work Near Overhead Power Lines CoP (NSW) Managing Noise & Preventing Hearing Loss CoP
Managing the risk of falls at Workplaces CoP First Aid in the Workplace CoP
Managing the Work Environment & Facilities CoP Managing the Risks of Plant in the Workplace CoP
Confined Spaces CoP Welding Processes CoP
Excavation Work CoP Demolition Work CoP
Formwork CoP (Qld) Safe Design of Structures CoP
Scaffolding CoP (Qld) Tilt up and Pre-cast Construction CoP (Qld)
Mobile Crane CoP (Qld) Tower Crane CoP (Qld)
Steel Construction CoP (Qld) Preventing Falls in Housing Construction CoP (NSW)
Concrete Pumping CoP (Qld) Construction Work CoP (NSW)
Children and Young Workers CoP (Qld) AS/NZS 3000 Electrical Installations
Traffic Management for Construction or Maintenance AS/NZS 3012 Electrical Installations- Construction &
Work CoP (Qld) Demolition Sites
WHS Management Plan / Page 9
Page 11
Legislation and Other Legal Requirements
AS/NZS 3760 In-Service Safety Inspection & testing of
AS/NZS 1576.1 Scaffolding - General Requirements
Electrical Equipment
AS/NZS 1873.1 Power-Actuated Hand-Held Fastening
AS/NZS 4576.1995 Guidelines for Scaffolding
Tools
AS/NZS 2550.1 Cranes, Hoists & Winches - Safe Use – AS 2550.5 Cranes, Hoists & Winches – Safe Use –
General Requirements Mobile Cranes
AS 2550.10 Cranes, Hoists & Winches – Safe Use – AS 2550.15 Canes, Hoists & Winches – Safe Use –
Mobile EWP Concrete Placing Equipment
AS 2550.20 Cranes, Hoists & Winches – Safe Use – Self
AS 3850 Tilt-Up Concrete Construction
Erecting Tower Cranes
AS 3610 Formwork for Concrete AS 2601 The Demolition of Structures
Managing RCS dust exposure in the construction
Managing Psychosocial Hazards at work (QLD)
industry COP (QLD)
WHS Management Plan / Page 10
Page 12
2. Project Hazard/Risk Register
The Project Hazard / Risk Register is a generic document that is amended according to the site-specific health
and safety requirements of each construction project. This document will also take into consideration Hazards
and Risks relating Environmental Management and Emergency Response and Preparedness.
The Project Hazard / Risk Register will be referenced during the Project Start Up Meeting and the site-specific
hazards identified including all Health-related hazards that may require health monitoring in line with WC
Health Monitoring Program OHS 036 and any additional considerations during the construction phase.
A copy of the Project Hazard / Risk Register will be sent to all Contract Partners prior to them mobilising to site
for their review. All workers will be informed of the contents of the WHS Management Plan, Environmental
Management Plan. EPARP and Hazard Risk Register during their site-specific induction. All amendments to the
plan, during the project construction, shall be communicated to all workers at the next available Pre-start
Meeting.
A review of the Project Hazard / Risk Register will be conducted by the respective Regional HSE Coordinator /
HSE Advisor with BSBWHS414 OHS Cert 4 when conducting a Monthly Site Audit. The Site Review will be
conducted at least six (6) times during a calendar year and will be recorded in Procore utilising the Site Audit
Checklist.
Amendments to the Project Hazard Risk Register including all relevant details will be recorded on the revision
history section of the document.
The site-specific Project Hazard / Risk Register will be printed and stored onsite in a separate folder in A3
format to be referenced by all site personnel.
See Appendix 1 for a copy of the current Project Hazard/Risk Register.
2.1 Supporting Documents
Document Title Category Relevance
WC OHS 060 – Critical Incident / Exposure Procedure Procedure Rehabilitation and Return to Work
WC OHS 052 - Rehabilitation Policy Rehabilitation
WC OHS 060 - Critical Incident / Exposed Worker Procedure Critical Incident
WC ENV 015 - Cyclone Management Plan High Winds and Cyclone
0212 - 15 - Emergency Evacuation Drill Form Emergency Evacuation Drill
Cyclone Management Plan Plan Cyclone preparation
COVID-19 WHS Risk Assessment and Safe Workplace P Plan COVID-19 Assessment and preparation
Mobile Plant Checklist Checklist Plant Management
Work Health and Safety Management Plan Plan WHS management document
Environmental Management Plan Plan Environmental Management Document
SWMS Review Checklist Inspection Review SWMS compliance
Excavation Permit Permit Managing Excavation works
Hot Works Permit Permit Managing Hot Works
Working at Heights Permit Permit Managing Working at Heights
Confined Space Permit Permit Managing Confined Space
Weekly HSE Inspection Inspection Monitoring / Review
Safety Interaction Inspection Monitoring / Review
Monthly Audit Inspection Monitoring / Review
Scaffold Inspection Inspection Monitoring / Review
Procore Inspection Matrix Procedure Monitoring / Review Procedure
Project Prestart Agenda Form Meeting Records
Project Prestart Minutes Form Meeting Records
WHS Management Plan / Page 11
Page 13
Site Equipment / Testing Register Register Maintaining Records
3. Risk Assessment
The hazards and risks related to projects undertaken by Woollam will be assessed by the Project Manager or
their delegate in conjunction with the Regional HSE Coordinator or their delegate and recorded in Section 2
Project Hazard / Risk Register of the WHS Management Plan for each Project. The WHS Management Manual
will also identify legislative criteria relevant to the hazards and risks and relevant to the State in which the
project is located.
If required, the Site Manager, in consultation with the Regional HSE Coordinator, shall conduct a formal risk
assessment of any task, and shall record the results on a Risk Assessment. When conducting this risk
assessment, it will take in the likelihood and consequence of injury, illness and injury occurring and reference
any available information on the hazard including records of incidents, illnesses, and disease. Some reference
areas would include the safety statistics spreadsheets on the server and relevant authorities’ websites.
Identified risks will be reduced to So Far as Reasonably Practicable (SFARP) by the application of control
measures.
SFARP should not be above Moderate.
In the event of a task having a level of risk, where no matter what controls are put in place, it remains a High
Risk, practical risk control priorities such as, Work Permits, increased inspections or supervision will be
implemented.
Recommended control measures identified from the Risk Assessment, will be implemented in the form of Safe
Work Method Statements.
WHS Management Plan / Page 12
Page 14
Risk Matrix
CONSEQUENCE LIKELIHOOD
Not expected
The event may The event will
however the The event could The event is
occur only in probably occur
event may occur at some expected to occur
exceptional in most
Health & Safety Environment Quality Severity occur at some point or has occurred
circumstances circumstances
point
Rare Unlikely Possible Likely Almost Certain
Serious and
irreversible Severe damage to
Fatality
environmental Woollam reputation
Permanent Total harm with costs
Catastrophic Medium High High Extreme Extreme
Loss greater than
Disability greater than $200,000
$50,000
Significant / Considerable damage
extensive injury or Extensive to Woollam
illness environmental reputation High Medium Medium High High Extreme
Permanent Partial damage Loss of $50,000 –
Disability $199,999
Woollam brand
Serious injury or Minor reputation
illness resulting in environmental Moderate Low Medium Medium High High
lost time injury damage Loss of $5,001 –
$49,999
Injury or illness Minor impact to
Environmental Woollam reputation
requiring medical
nuisance
Low Low Low Medium Medium High
treatment Loss of $501 – $5,000
Injury or illness No No effect on Woollam
requiring minor first environmental reputation Insignificant Low Low Low Medium Medium
aid treatment damage Loss less than $500
Risk Rating Risk Actions
Tolerance
Unacceptable Controls are inadequate, task not to commence or continue until risk is reduced by changes to methodology and or additional
1. Extreme
Risk control measures have been approved by the operations support teams.
Unacceptable Controls may be inadequate, task not to commence or continue until risk is reduced by changes to methodology and or
2 High
Risk additional control measures agreed by Project Manager in consultation with Construction Team management.
Tolerable Existing controls are monitored for effectiveness and where additional controls to reduce risk are identified controls are to be
3. Medium
Risk implemented.
Accepted
4. Low Undertake the activity with existing controls and monitor effectiveness.
Risk
Control measures shall be selected according to the hierarchy of controls. In order of preference, these are:
1. Elimination - completely remove the hazard, or risk of exposure to the hazard. e.g. removal of a noisy
machine from an otherwise quiet area or removing the need for stressful actions and movements by
redesigning the work area or workflow.
2. Substitution – replacing one substance or activity with a less hazardous one. e.g. using a non-
flammable solvent in the place of a flammable one or replacing an unstable machine with a stable
one.
3. Isolation - can the hazard be isolated from the worker or the worker from the hazard?
4. Engineering – control the risk through engineering controls such as using enclosures, guarding, local
exhaust ventilation, or automation. e.g. installing guards on machinery
5. Administration - policies and procedures for safe work practices e.g. Procedures to be followed for
use of hazardous chemicals or processes, and lockout procedures.
6. Personal Protective Equipment – PPE should only be used where other measures are not practicable.
e.g. respirators, ear plugs.
WHS Management Plan / Page 13
Page 15
4. Safe Work Method Statement
Register
The following is a list of Woollam Constructions’ Safe Work Method Statements. A cross in the corresponding
box will indicate it is required on this particular project:
High Risk Construction Work
Req’d SWMS Req’d
SWMS
Confined Spaces Refuelling Plant and Equipment
Control of Exposure to RCS Traffic Control
Demolition and Structural Alteration
Telehandler Operation
Work
Elevated Work Platform Operation Working at Heights
Trenching and Excavation Working Near Overhead Power Lines
Forklift Operation Man and Material Hoist Operation
Hazardous Substance and Dangerous
General Site Works
Goods
Mobile Scaffold General Internal Carpentry
Working with or Around Mobile Plant General External Carpentry
Precast and Tilt Panel Erection General Concrete Works
All Safe Work Method Statements submitted by Contract Partners shall be reviewed by Woollam Constructions
for adequacy and recorded on the online Safe Work Method Statement Checklist. A completed copy of the
Safe Work Method Statement Checklist will be kept electronically as evidence of review.
If there are deficiencies listed on the Safe Work Method Statement Checklist, the Safe Work Method
Statement shall be returned to the Contract Partner, and the Contract Partner shall make the required changes
to the Safe Work Method Statement prior to commencing work.
Any alterations or amendments to a Safe Work Method Statement must be communicated to the relevant
employees by Woollam Constructions or the relevant Contract Partner via a Daily Prestart Meeting and
recorded on the relevant SWMS and Daily Prestart Talk form.
A review of the Contract Partner SWMS shall be facilitated by the Site Manager and or the Site HSE Adviser
with the respective Contract Partner every 3 months, should that Contract Partner still be on the project.
Contract Partner’s SWMS will be filed either in hard copy on site, electronically in the relevant project online
portal or both. In the event of a notifiable incident, then this WHSMP, and any relevant SWMS, will be retained
for a minimum period of two years.
WHS Management Plan / Page 15
Page 16
• All contract partners to provide certification and Calibrations records to the Site Manager or HSE
representative upon starting on any Woollam project. These records need to include when equipment
was first tested and the frequency that calibration / testing needs to be conducted, who has
conducted the testing and their registered qualification to conduct said product.
• All Woollam equipment requiring certification / calibrating are to be recorded om WC OHS 095 Site
Equipment register and maintained as per manufacturing specs and products Australian Standards.
WHS Management Plan / Page 21
Page 17
PROJECT NAME: Insert Project Name
NEXT REVIEW
NUMBER CONTRACTOR DATE COMMENTS
DATE
1
2
3
4
5
6
7
8
9
10
4.1 Supporting Documents
Safe Work Method Statement (WC OHS 004(a-v)
Safe Work Method Statement Checklist (electronic document located on Procore)
WHS Management Plan / Page 16
Page 18
5. Site Safety Rules
Any safety non-compliance regarding the Employees or Contract Partners workplace, work activities, plant and
equipment, non-compliance to their Safe Work Method Statements, or non-compliance to Woollam
Constructions Site Safety Rules will adversely affect the Employees and Contract Partners continuation of work
with Woollam Constructions.
• First warning will be verbal, name registered, and Hazard Report issued;
• Second warning will be re-induction to site for the worker and supervisor. This will include retraining
in SWMS. A Second Hazard Report will be issued.
• Third warning and Hazard Report issued, and Woollam Constructions will ask the employee / Contract
Partner to show cause within 24 hours, as to why the employee / Contract Partner should not be
removed from site.
5.1 Site Entry Requirements
• All workers must present a General Safety Induction Card. No worker will be able to conduct site
works without a General Induction Card.
• All workers must report to the site office, sign in and notify Woollam Staff of arrival and submit a Site-
specific site induction.
• Visitors to site must be involved in a brief Site Induction and be escorted by an inducted member of
the Woollam team at all times.
• All workers to be familiar with emergency Preparedness and Response Plan before entering site.
• Workers are required to park their personal vehicles as instructed by the Site Manager/Site HSE
Adviser, failure to do so a first warning will be issued.
• All Contract Partners and workers to sign in on the cloud-based software system.
• Where a workers numbers board has been deemed required, Contract Partner workers numbers to
be updated daily.
5.2 Prestart
Prestart meetings are to be attended every morning by all Contract Partners and Contract Partners Supervisor.
Special high risk prestart to be attended by supervisors on site to ensure all workers are aware of up-and-
coming high-risk tasks e.g. post tensioning, crane lifts, confined spaces etc. All workers to sign prestart as part
of the sign in / sign out procedure. As well as acknowledge they accept the information in the prestart via Sign-
Onsite.
5.3 Safe Work Method Statements
Once the Site Manager/ HSE Adviser has approved the Contract Partners Safe Work Method Statement, the
Contract Partner will comply with their Safe Work Method Statement, the Principal Contractors WHS
Management Plan and the Site Safety Rules at all times. Review of SWMS to be conducted quarterly or as per
site requirements. Adherence to those SWMS will be confirmed via Task observations and Safety Interactions
through Procore.
5.4 Personal Protection Equipment
5.4.1 Head Protection
• The wearing of hard hats is mandatory at all times whilst on site.
WHS Management Plan / Page 17
Page 19
5.4.2 High Visibility
• The wearing of high visibility long sleeved shirts is mandatory. Visitors are required to wear long
sleeved shirts and Hi-Vi’s vest to be worn at all times whilst on site.
5.4.3 Eye Protection
• Eye protection is to be worn where there is any possibility of objects entering the eye.
• Welding masks must be worn when using any welding equipment.
• Appropriate welding shields to be installed to protect all other workers on site where appropriate.
• Oxy goggles to be worn when using gas cutting equipment.
5.4.4 Hearing Protection
• Protection is required to be worn where the noise levels exceed exposure standards for noise
(Laeq,8h of 85dB(A) or a Lc, peak of 140dB(C)).
5.4.5 Respiratory Protection
• Respiratory Protection must be worn any time there is cutting or grinding of fibrous materials
including RCS containing products.
• Respiratory protection must be used in accordance with the relevant SDS for the substance being
used at the time.
• All dust generating activities are prohibited.
• A fit test register must be provided by the Contract Partners for all workers using RPE as a control.
• Engineering controls, mechanical extract or water suppression is required for all dust generated
activities. Workers conducting task and workers working in the vicinity must wear appropriate RPE.
Workers not requiring RPE whilst using an engineering control must produce a hygienist report
identifying the engineering controls are sufficient.
• Vacuums with H & M filters to be used instead or sweeping and bags to be disposed of correctly.
• Wet down of high traffic areas with water to supress dust.
5.4.6 Foot Protection
• All workers are required to always wear safety boots when on site. Boots must have a construction
that carries above the ankle, consists of a leather upper and laces for support.
• Visitors approved by the Site Manager may wear only enclosed footwear and must always be
escorted by an inducted person.
5.4.7 Hand Protection
• Suitable hand protection must be worn on your body at all times. Gloves must be worn when
conducting manual tasks and/or as per the approved SWMS.
• Appropriate gloves must be used in accordance with the relevant SDS for the substance being used at
the time. SDS to be provided and maintained by Contract Partners.
• Gloves must be worn at all times when handling any light gauge steel framing products or sharp objects.
5.4.8 Sun Protection
• Long sleeved shirts must be worn at all times and Sun Block shall be worn on unprotected areas of
skin as conditions require.
• Brims on hard hats are encouraged to be worn whilst working outdoors.
5.5 Alcohol and Drugs
• Random drug and alcohol testing are conducted on this project.
WHS Management Plan / Page 18
Page 20
• No illegal substances or alcohol are permitted on the project site.
• Workers will not consume alcohol or drugs during working hours.
• Workers will be fit for work, and if prescription drugs are taken that may affect work safety, the Site
Manager/HSE Adviser must be notified before the start of works.
5.6 Amenities
The following amenities will be provided for all workers:
• Toilets.
• Facilities for washing hands and face.
• Cool, clean drinking water.
• Room or shelter where meals can be taken.
• Toilets must be used – urinating elsewhere is not permitted.
All workers are expected to help maintain the amenities in clean and tidy manner and report to the Site
Manager/HSE Adviser if amenities require maintenance, repairs or moving. Amenities to be maintained to
relevant Australian Standards.
5.7 Plant Operation
• Only ticketed/competent persons shall operate plant on site. Competency needs to be ascertained by
a Registered and qualified RTO.
• Operators of scissor lifts must be in possession of an appropriate qualification i.e. a yellow card to
operate onsite.
• Contract Partners and workers shall supply the Site Manager/compliance officer with copies of
Certificates of Competency or other relevant qualifications before starting work.
• Contract Partners shall supply the Site Manager/compliance officer with evidence that plant brought
onto the site is safe for use before starting work.
• Plant Operators must complete the Mobile Plant Checklist before undertaking any tasks.
• All mobile plant will have roll-over protection, operational warning lights, fire extinguishers and
reversing alarms fitted and working.
5.8 Electrical
• All portable electrical equipment must be tested and tagged three monthly and maintained in a
serviceable condition, this includes all site containers and offices where power is being used.
• Temporary power boards to be fixed securely to the ground or wall at all times.
• Double adapters and/or piggyback adapters of any kind are prohibited.
• Residual Current Devices (RCD) must be fitted to all construction wiring and portable generators.
• Portable generators must have appropriate earthing mechanisms and RCD protection.
• All temporary power boards must be installed by a licensed electrician and comply with the
requirements set out in AS/NZS 3012:2010.
• A register must be kept and maintained on site for all RCD trip tests.
• Electrical leads must be tested, tagged, less than 30 metres and protected from damage and liquids at
all times.
• Wherever practical leads should be elevated off the ground on insulated hooks or lead stands. Never
wrap electrical cables around metal objects.
• Electrical contractors must complete the Electrical Isolation Checklist on Procore prior to any
electrical isolation.
5.9 House Keeping
WHS Management Plan / Page 19
Page 21
6. Common Plant and Equipment
Common Plant and Equipment is plant or equipment that is provided by the Principal Contractor for use by
workers at a workplace.
The use of common plant is only for workers that are appropriately competent for the relevant plant. The user
of the plant must provide evidence of competence before operating the plant.
All plant must be maintained, inspected, checked and records kept according to the following register.
Plant found to be unsafe must be marked as “locked out” according to the process in Section 30.1 Electrical
Lock Out. All unsafe plant must be reported to the Site Manager immediately to arrange for repairs.
All Emergency Equipment identified in the Emergency Preparedness and Response Plan should be added to
the Site Equipment / Testing Register.
Equipment to be reviewed on a weekly basis as part of the mandatory Procore auditing schedule.
Common Plant Inspection and Servicing Requirements
Plant Type Plant Type Plant Type Plant Type
Anchor/attachment points Height Safety Inspector - AS/NZS 1891.4, Yearly
(fall arrest//restraint) MEM15004B, RB, RI, RA or AS1891.2
Engineer
Construction wiring Licensed Electrician AS3012 Upon installation,
then every 6 months
Electrical Equipment Licensed Electrician / AS 3000 3 monthly, 3 monthly RCD
Competent Person AS 3012 calibrations. Independent
(UEENEEP026) inspection at least once in the
duration of the project
Fire Extinguishers Competent Person AS 1851 Regular inspection,
(CPPFES2021A) 6 monthly tests (if not disposable)
Formwork Engineer with relevant AS 3610 Engineers Certificate prior to a pour
experience
Lifting gear – alloy chains Licensed crane operator, AS3775.1 01 - 05 lift cycles per week - 12
dogman or rigger monthly 06 - 25 lift cycles per week
- 6 monthly 26 - 200 lift cycles per
week - 3 monthly 201 plus lift
cycles per week - monthly
Lifting gear – round & flat Licensed crane operator, AS4497.1, 3 monthly, yearly
slings dogman or rigger AS1353.1
Lifting gear – lifting devices Licensed crane operator, AS4991 12 monthly
dogman or rigger
6.1 Supporting Documents
• WC OHS 095 Site Equipment / Testing Register
WHS Management Plan / Page 22
Page 22
• All access and egress to be kept clear of all materials including travel paths around and through the
project.
• The work site shall be kept neat and tidy at all times.
• Employees and Contract Partners are to place their rubbish into the skip provided at the end of each
day.
• Contract Partners may be back charged for removal of any rubbish left overnight.
• All RCS containing material to be cleaned up and removed as per RCS code of practice.
• No dust permitted to be generated during cleaning activities.
5.10 Interference with Safety Measures
• The removal or alteration of hoardings, scaffold guardrails, edge protection, penetration covers,
temporary power boards and other measures designed to protect against safety risks without the
approval of the Site Manager is an offence and will result in a hazard report and may also be reported
to State authorities.
5.11 Safety Incidents
• Employees and self-employed persons must notify the Site Manager/ HSE Adviser of all incidents,
injuries, illnesses, equipment damage and near misses immediately.
• The scene of any incident shall not be interfered with until the Site Manager/ HSE Adviser or delegate
has provided authority to proceed.
5.12 Ladders
• Ladders on site are to be platform ladders as per the code of practice and AS1892. No milk crates or
the like to be used as a platform to work off.
• Contract Partners using planks need to be 450mm wide and a handrail installed if working above 2m.
Ladders need to be well maintained, industrial standard with a load rating of 120kg as a minimum.
• Ladders used for access and egress must be positioned 4:1 and secured top and bottom and extend
1m above stepping off point.
• Task specific activities requiring the use of step ladders will be considered upon receipt of an
approved risk assessment.
• 600mm and 900mm step ladders are not permitted on site.
5.13 Grinders
• No 9” grinders to be used on site.
• Whilst cutting metal with drop saws full face shields must be worn.
5.14 Scaffolding
• Only a licensed scaffolding is permitted to alter or adjust scaffolding onsite with permission from the
licensed scaffolder who originally constructed the structure.
• All unauthorised adjustments of scaffold by an unlicensed person this includes removal of hop ups,
kickboards and handrailing will result in immediate removal from site and may be reported to State
authorities.
• All scaffolding is required to be constructed in a compliant manner and that is fit for purpose.
• A Procore Scaffold Inspection must be completed prior to any scaffold handover will be accepted.
5.15 Equipment / Calibration Records
WHS Management Plan / Page 20
Page 23
7. Health Surveillance and
Exposure Monitoring
The purpose of the Health Surveillance and exposure monitoring is to detect at an early stage, any adverse
health effects of employees identified conducting ‘High Risk’ activities, or areas of work which have certain
significant hazards.
This program aims to:
• Contribute to the detection of hazards and assessment of risk.
• Raise the general awareness of the adverse effects of exposure to hazardous materials and harmful
work processes.
• Prevent and detect at an early stage any adverse health effect on employees.
• Assist in the evaluation of risk control measures and
• Provide necessary resourcing.
Prior to works commencing on a project Woollam Constructions will conduct a Project Hazard/Risk Assessment
which will be conducted by the Regional HSE co-ordinator who holds a formal OHS qualification cert 4 or
above. In circumstances where a high or extreme risk is identified an occupation hygienist with formal training
will be engaged to provide exposure monitoring.
Woollam Constructions conducts a range of activities / tasks that may potentially expose employees to sources
of harm (hazards).
Any employee identified as using or exposed to substances listed in the WHS Regulations Schedule 14 is
required to participate in the Health Monitoring Program. Concerns may be discussed with the Site Manager,
Site Health and Safety Adviser or the Regional Health and Safety Coordinator.
In accordance with Australian Safety and Compensation Council’s guidelines, Medical Practitioners or formally
qualified Occupational Hygienist will be appointed by Woollam Constructions, to assist with the Health
Monitoring program and any associated medical monitoring.
All Woollam Constructions’ employees who are frequently required to use personal protective equipment to
protect the worker from the risk of hearing loss associated with noise that exceeds the exposure standard for
noise will be provided with audiometric testing within three months of commencing with Woollam
Constructions and at two yearly intervals thereafter. This will managed by a registered health professional
which specialises in this testing.
Woollam Constructions shall ensure all workers carrying out asbestos and other works which risk exposure to
chemicals contained in Schedule 14 of the WHS Reg 2011 related workers will be provided with Health
Monitoring prior to undertaking the said work. The Health Monitoring will cover substances listed under
Schedule 14 of the WHS Reg 2011 and will consider the worker’s demographic, medical and occupational
history, records of the worker’s personal exposure and include a physical examination of the worker. Woollam
Constructions will ensure that this Health Monitoring will be carried out by or under the supervision of a
registered medical practitioner with experience in health monitoring or a formally trained Occupational
Hygienist.
Exposure to RCS will be monitored onsite using the RPE / PPE usage record found on Procore. Exposure levels
included and exceeding 30 exposure instances in 365 days will trigger Health Monitoring.
7.1 Supporting Documents
WHS Management Plan / Page 23
Page 24
Health Monitoring Program
RPE / PPE Usage Record (Procore)
As found in Procore -
WHS Management Plan / Page 24
Page 25
8. Hazardous Substance and
Dangerous Goods Register
Hazardous Substances and Dangerous Goods brought to site for Woollam Constructions use shall be listed in
the project Hazardous Substance and Dangerous Goods Register along with a current SDS. A risk assessment
will be conducted with the completed form also listed in the register for all hazardous substances and
dangerous goods except for those that are identified as household products and are used in that same manner.
Woollam Construction employees who handle hazardous substances or dangerous goods shall read,
understand, and sign off on the applicable SWMS and Risk Assessment.
Contract Partners shall provide the Site Manager with a completed Hazardous Substance and Dangerous
Goods Register, an accompanying Risk Assessment, and current Safety Data Sheet (SDS) before they are
brought onto site. A copy of the Risk Assessment and SDS’s will always be kept in the Site Office and / or First
Aid Room, at the storage location of the substance and be readily available to workers.
Contract Partners shall be responsible for providing a Safe Work Method Statement (SWMS) that documents
the control measures they will implement to mitigate the potential of their workers and others from being
exposure to risk or harm. Employees shall adhere to the health and safety requirements outlined in their
respective SWMS, SDS’s and Risk Assessments for all Hazardous Substances and Dangerous Goods used whilst
completing their work activities.
Contract Partners shall be responsible for the safe storage and handling of their Hazardous Substances and
Dangerous Goods
Compliance with this process will be reviewed and monitored using the Weekly Safety and Environmental
Inspection and Monthly HSE Audit.
8.1 Supporting Documents
Hazardous Substance Register
Hazardous Substance Training Presentation (ELMO)
Hazardous Substance Management Procedure
WHS Management Plan / Page 25
Page 26
9. Emergency Preparedness and
Response Plan
Woollam Constructions has identified the most likely potential emergency situations for construction activities.
Generic situations and appropriate actions are recorded on the Emergency Preparedness and Response Plan.
The plan will be created by the HSEQT Manager / Regional HSE Co-ordinator with that person holding a
minimum a Cert 4 BSB41419 Work Health and Safety or equivalent.
The Emergency Preparedness and Response Plan will be available in prominent locations on site (site office or
lunchroom.
Site Specific Emergency scenarios will also be identified using the Emergency Preparedness and Response Plan
Site Managers and other workers nominated as Emergency Coordinators will be required to undertake the
Emergency Response Training on the cloud-based software system and participate in development of the
Emergency Preparedness and Response Plan during the site establishment phase.
The Emergency Preparedness and Response Plan shall formally assess the suitability, location and accessibility
of emergency equipment and identify potential Emergency Scenarios. It shall also determine the first aid
system, facilities and number of first aid providers, appropriate for the project and the organizational risks.
9.1 Supporting Documents
Evacuation Diagram
Emergency Preparedness and Response Plan
Emergency Preparedness and Response Plan Training (conducted online)
WHS Management Plan / Page 26
Page 27
10. Evacuation Diagram
A copy of the Project Evacuation Plan will be recorded on the Emergency Evacuation Diagram Template and
will be displayed in a prominent location on site (site office and lunchroom) once the site has been established.
The evacuation will contain the following:
• Emergency Assembly Area
• First Aid
• Amenities
• Siren Location
• Fire Fighting Equipment
• Current location on project including current floor.
Employees and Contract Partners shall be informed of the Evacuation Diagram for the Project, as part of the
Site Induction Process, and evidence will be recorded on a cloud -based software system.
10.1 Supporting Documents
See Appendix 2 for Emergency Evacuation Diagrams
WHS Management Plan / Page 27
Page 28
14. Incident Investigation
Report
Incident investigations will be recorded on the Incident Investigation Report form on a cloud-based software
system and notification will be in accordance with the Incident Notification Flowchart.
The Site Manager, in conjunction with the Regional HSE Coordinator, will ensure that investigations are
conducted according to the Incident Investigation Procedure.
Corrective and Preventive measures will be introduced where appropriate and recorded along with prescribed
timeframes, on the Incident Investigation Report on a cloud-based software system.
Incident Investigation Reports will be forwarded to the relevant people for action and follow up according to
the Incident Notification Flowchart.
For notifiable incidents or were requested by the client, the Site Manager, in conjunction with the Regional
HSE Coordinator, will complete an Incident Investigation Analysis.
All completed Incident Investigation Reports shall be kept on site or electronically until the completion of the
Project and after the project, in line with the Records Management Procedure.
14.1 Supporting Documents
Incident Investigation Report (electronic form)
Incident Investigation Flowchart
Incident Investigation Procedure
Incident Investigation Analysis
WHS Management Plan / Page 32
Page 29
11. Site Diary
The Site Diary for the project will be undertaken on a cloud-based software system each day by the Site
Manager. The Site Diary will be used to record the following:
• Notes Register – the notes register is to record activities that could include but not be limited to:
- Incidents.
- Hired Plant information.
- Activities and associated hazards on site.
• Weather conditions
• Timecard entry – a record of all Woollam Constructions’ employees worked hours.
• Man Hours Register – a record of all Contract Partner’s worked hours.
All completed Site Diaries will be filed, and can be accessed, through the relevant project and recorded on
Procore.
WHS Management Plan / Page 28
Page 30
12.Weekly Safety and
Environmental Site Inspection
The Site Inspection for the project will be undertaken on the cloud-based software system, Procore.
Weekly Safety Inspection – undertaken each week by the Site Manager on the inspection’s portal of cloud-
based software system. Using the template refer to each prompt and mark pass, fail or N/A. An observation
will be created for any follow up actions required. Observations will be documented including a description of
what action is required, who is to complete the action and when it must be completed. Once observations
have been rectified to an approved and satisfactory standard that they should be closed out.
All completed Weekly Safety and Environmental Inspections will be filed, and can be accessed, through the
relevant project online portal.
Weekly Safety and Environmental Inspections to be completed in line with Procore Inspection Matrix.
As found in Procore -
WHS Management Plan / Page 29
Page 31
WHS Management Plan / Page 30 [OCR of page images] mages ae Tew piate Week y Letet) amt Dreewerwersel ben pen tne 116 Cast Sogn Sqaage hapectad, vetoes aed wairesired 19) Pusha Aneae pectacted and thgrponted UF Are wotters parting thelr epbinios op reeminshed in whe someday Incheon? Ip there o ‘Drale Menegeeet Plan om pimeeT bp the Trelle Menegeeeest Pies being adhered to? 1L5D Hae 2 bat work permit Been lnmued for any ot work being undertaben? In there an ROCF IEC UmE Be FQN eT! Cresent Ent In Cate? Aw COMmbuStDIS materiale Ompoesd of (U28 Are Gere any eetivetes lebinng plere Pest merterd Mealy Larvedence waragermerd Fowvorerental 2 Are 0it temees in tnet ened appropriate a9 per deteis bn old pews? Ase sit penis in GrnienT Ace Dee 28 Ween appropriate fer water rem ei? 2.2 Ave Gust mitigation procesees in place? Are Dey Comtroding avy Cust coscena? (22S plant ant equtpemend herve apap ciate reine papeewthnn Gevees? bt rewy papererd parent way Iman rms erative ares) bre wary bemewy wwrbed mun te Feperrments sat out in the DEPT Se end appraprian veemlaton of work area? 15Gee S87 Are at caved coveremy? are 9 open ua evesunar? 2.6 Crceton Controtia the appecason Cf eration COMO! Mmamares appr Doriste for Eve Bete 10 prevent COmaD! mind aed wane erotica? lm Erosion and Sedement Cowrue Underunen 88 per Crmtecnmental Secemert Commo Maragerseet Plat? 27a Orenege se Kate heed tom dcenmand ereetog Gre SahoWA'? Ace ony exedomivaten tre peotien te erent Ot Mecoreater rein) dee pieytin a harcers appregeiatety maint mired > 22 Comatering Masagernent 1s Oreraring Undetamin £8 fe! Coentening Maregerser, Pian? Oroundueser Conasina Guecoved mvtam fax con be csc a squack exvewament managed ROCK, waEe Quality Monnorng Demy Uncertubes BNE soproprmty? (20 Ret ond Reeperne Oo Rell Kits remkew Pee consent eustertons be cine! wih opie oo eeraatend WEN thin Goreirvation Oe wiell naw te prevent, contain amd clean wp sqaieT 216 Compinint Maragersert-ems an ervircermente Comptamn (Moms Dust Ain Water) Goer Tepormdt Are Pere Merratives 1 BVOC UEMECEERATY RDA 68 LUMCESCING PemPonrboce? (201 Wrst ts ote preered ter emrepeeted enather cordtiiers? Ave certreds i pieee? (212 Veyetatenn Mesegeruest Ase wruetatiens erees dewwitnd probes tent eoed aedanmd (mre Aerte~ ortew age) 29 o ae segue oat cneemonns tpmeoninny ervnnang ne tn’ hens oo at 1y Bagel be weep oe hone corvtaminetes iree®y ite therwumeher dnsine Paes Fania Pees / Fenian Poa Pes rene Paes Fania Pees ree Pace Fan ntA woollam WORKING TOGETHER CONSTRUCTIONS TO BUILO LEGA WHS Management Plan / Page 30
Page 32
13. Site Induction
In accordance with relevant state legislation, Woollam Constructions shall ensure a person has attended
General Construction Safety Induction Course and been given a Site-Specific Induction for the workplace
before allowing the person to start construction work. In addition to the Site-specific induction, all workers
when possible are to complete the Woollam Safety Induction prior to commencing work on site.
Evidence of the General Construction Safety Induction, the Woollam Safety Induction, the Site-Specific
Induction and any applicable high-risk licence shall be recorded on a cloud-based software system Sign On-site.
All visitors will be required to be part of brief site-specific induction. All visitors to site need to be accompanied
by an inducted person and have been made aware of major hazards and the daily prestart by said Inducted
person. Visitors will also need to sign into the project via the Sign-Onsite app and sign out when they leave
site. The Site Induction Guide / Template is to be used during the site-specific induction and be made site
specific prior to presentation.
Before onsite induction is to commence all equipment servicing, certification or calibration evidence and
records need to be provided to the Site Manager of HSE representative. This evidence needs to be needs to be
compiled in a register of format that is easily referenced.
Topics to be covered in the Site-Specific Induction include:
• Project details
• Project goals
• Top project risks
• Site specific emergency Response Procedures
• Site entry requirements including PPE requirements.
• Emergency evacuation and contact details.
• Site specific information including working hours, delivery information and parking arrangements.
• Woollam Way policy
Topics to be covered in the Woollam Safety Induction include:
• The Golden Rules
• Safe work method statements
• Working at heights
• Site Safety Rules
• Young workers
• Mental health
• Software systems
• Primary hazards
• Plant and equipment requirements.
• Consultation
• Right of entry
• Health surveillance and exposure monitoring
• COVID 19 requirements
13.1 Supporting Documents
Site Induction Record (electronic form available on Sign Onsite)
Site Induction Guide / Template
WHS Management Plan / Page 31
Page 33
15. Incident Notification
Reporting is to be as per Incident Notification Flowchart.
The Incident Notification Flowchart is to be displayed in prominent locations around the site (site office and
lunchroom)
Where there is a death of a person, a serious injury or illness of a person or a dangerous incident, the
Regulatory Authority must be notified immediately after becoming aware of the incident. Notification can be
by phone or in writing (email or online). Consult with the Project Manager, Regional Manager, HSEQT Manager
or Regional HSE Coordinator for further advice prior to notifying authorities.
A copy of the Incident Investigation Report is to be forwarded to the Regional HSE Coordinator.
All completed Incident Investigation Reports shall be kept electronically until the completion of the Project.
15.1 Supporting Documents
Incident Investigation Flowchart
WHS Management Plan / Page 33
Page 34
19. Safety Interactions
Safety Interactions will be completed by the Site Manager, or their delegate to increase the site conversations
around safety, to identify safe work practices and to identify and correct unsafe work. This will be done using
the inspections portal of a cloud-based software package.
When completing the Safety Interaction, the following points will be discussed:
• Is the work being completed safely?
• If the work is being completed safely, then:
- Comment on the safe aspects of work.
- Ask if the worker has any safety concerns.
• If the work is being completed unsafely, then:
- Record the workers’ name.
- Is there a safer way to complete the task? If not, then stop work and review SWMS.
- Record what the unsafe act/condition was.
Safety Interactions will be completed in line with the Inspection Matrix.
All completed Safety Interactions can be accessed through the relevant project online portal.
As found in Procore -
WHS Management Plan / Page 37
Page 35
21. Safety Task Observations
Safety Task Observations will be completed by the Site Manager, Project Managers, relevant Contract Partners
and an HSE Resource, where available, weekly, to monitor and evaluate the effectiveness of implemented
control measures detailed on employee and Contract Partner Safe Work Method Statements. This will be done
using the inspections portal of a cloud-based software package.
When completing the task observation, the following points should be considered:
• Has a SWMS Checklist been completed?
• Have all relevant workers signed the SWMS?
• Does the SWMS identify all hazards and appropriate controls?
• Are all high-risk activities being undertaken included in the SWMS?
• Are controls for all high-risk activities being undertaken included in the SWMS?
• Are all listed controls being implemented correctly?
• Are hazardous substances being used? Have current SDSs been provided for all hazardous
substances?
• Is all Personal Protective Equipment (PPE) nominated in the SWMS being used correctly?
• Is the PPE in good condition?
Outcomes of the discussions with workers should be recorded.
Risks and opportunities (a more productive method to conduct a task etc.) should also be recorded.
An observation will be created for any follow up actions required. Observations will be documented including a
description of what action is required, who is to complete the action and when it must be completed.
Outstanding observations can be viewed on relevant project online portal. Once observations have been
rectified to an approved and satisfactory standard that they should be closed out.
All completed Task Observations can be accessed through Procore.
As found in Procore
WHS Management Plan / Page 40
Page 36
16. Hazard Report Form
Where a Contract Partner or Woollam Constructions’ employee is found to be non-compliant in regard to their
workplaces, work activities, plant and equipment, noncompliance to Safe Work Method Statements, or
noncompliance to Woollam Constructions’ Site Safety Rules than a Hazard Report will be issued to the
offending worker on a cloud-based software system.
Where an Employee or Contract Partner has been issued with 3 Hazard Report forms on any one project,
regarding the Employees or Contract Partners workplace, work activities, plant and equipment, noncompliance
to their Safe Work Method Statements, or noncompliance to Woollam Constructions’ Site Safety Rules,
Woollam Constructions will ask the Employee or Contract Partner to show cause within 24 hours, as to why
the Employee or Contract Partner should not be removed from site. Failing a response, which in the discretion
of Woollam Constructions, properly addresses the matter of concern, and which addresses the Employees or
Contract Partner's future compliance regarding the Employees or Contract Partners workplace, work activities,
plant and equipment, Safe Work Method Statements, or Woollam Constructions’ Site Safety Rules, Woollam
Constructions may, in its discretion, remove the Employee or Contract Partner from the relevant site and
suspend the Employees or Contract Partners re-entry to the site, until such time as the issues are, in the
discretion of Woollam Constructions, properly addressed.
Any delay costs associated with an employee or Contract Partner being suspended from a Woollam
Constructions’ site will be recovered from that employee or Contract Partner.
All Hazard Report forms shall be sent to the HSEQT Manager via Procore who will ensure they are discussed during
the HSE Leadership Meeting.
All completed Hazard Report forms shall be kept electronically on the Procore System.
16.1 Supporting Documents
Hazard Reporting Procedure
Hazard Report Form - as found on Procore –
WHS Management Plan / Page 34
Page 37
17. Daily Pre-start Minutes
Daily Pre-start talks will be used as a means of involving and consulting with employees in order to obtain
consultation on OHS issues and procedures to control risks. Issues arising out of Daily Pre-Start Meetings will
be recorded on the Daily Pre-start Talk Minutes or on a cloud-based software system.
Issues raised during Daily Pre-Start Talk Meetings, that cannot be resolved at a Site Level, will be
communicated to the Regional HSE Coordinator for resolution. If a resolution is not achieved, the Regional HSE
Coordinator will raise the issues with the Manager HSE who will ensure it will be discussed during the
Leadership Team Meeting for resolution. The results of the resolution at the Leadership Team Meeting will be
communicated to the relevant Regional HSE Coordinators who in turn will notify the site where the issue was
raised by the completing and participating in a toolbox talk with all workers to discuss the results. The Regional
HSE Coordinator will ensure the issues raised are addressed in the prescribed timeframe.
Site Managers will conduct Daily Pre-Start Talks with employees and Contract Partners to communicate and
discuss:
• The activities planned for the site.
• The issues and hazards arising from those activities.
• Details of work other than routine work being carried out.
• Potential for any serious risk
• Likelihood of affecting members of the public or other non-employees
• Changes to the WHSMP including changes to the Risk Register
• General Site issues
• Issues raised by workers and team members.
All completed Daily Pre-Start Talk Minutes records shall be kept on site or on the cloud-based software system
until the completion of the Project.
17.1 Supporting Documents
Daily Prestart Talk Minutes
Sign-Onsite Template
WHS Management Plan / Page 35
Page 38
18. Toolbox Talk Minutes
Woollam Constructions will utilize toolbox talks in two manners:
1. Pre-prepared toolbox talk templates are available on the intranet. There are twelve templates covering
various issues and they are available for the Site Managers to use to convey a particular safety message. The
following topics are covered by these templates:
• Manual Handling • Housekeeping
• PPE • Fire Extinguishers
• Responsibilities • Noise
• Slips, Trips and Falls • Working around mobile plant
• Scaffolding • Chemical Spills
• Snake bites • Workplace Relations Information
• Safe use of step ladders
Site Managers will present one toolbox talk per week and all workers on site including Contract Partners are
expected to attend and sign the back page as evidence of attendance.
2. Toolbox talks will be undertaken prior to high-risk activities such as Tilt Panel Erection. These toolbox talks
will be attended by all workers involved in that high-risk activity and will discuss the hazards, risks and controls
to be used whilst undertaking the high-risk activity. The information discussed will be recorded on Toolbox
Talk Minutes or on the Contract Partners Toolbox Talk form/template and all workers will sign as evidence of
attendance. Once complete the Site Manager will gather the completed toolbox talk and keep on site until the
completion of the Project.
The Toolbox Talk Minutes will be displayed in a prominent location on site (lunchroom) for other employees
and Contract Partners to read when they arrive on site.
All completed Toolbox Talk Minutes shall be kept on site or electronically until the completion of the Project.
18.1 Supporting Documents
Toolbox Talk Minutes WC OHS 008 (a-m)
Toolbox examples available on Intranet and cover of multiple subjects.
WHS Management Plan / Page 36
Page 39
20. HSE Planning Tool
The HSE Planning Tool will be completed by the Regional HSE Coordinator in consultation with the Site
Manager and Site HSE Advisers (where applicable), to identify high risk activities and discuss controls on a
weekly basis. HSE planning tool will also be used to identify and design changes or changes to risk profiles of
temporary structures A record of the identified and risks and the intended controls will be kept on a cloud-
based software system.
As found in Procore.
WHS Management Plan / Page 38
Page 40
Activity Responsible Person Type of action and records
people who may work on or visit the Site HSE Adviser - • Site Safety Rules displayed in a
site. HSEQT Manager - prominent position on site (site
office and lunchroom)
• Discussed during Site Specific
Induction
• Establishment of OH&S
Workplace Committee (if
Managing communication between Site Manager -
requested)
OH&S Workplace Committee (where Site HSE Adviser -
• Minutes of OH&S Workplace
applicable).
Committee Meetings
• Toolbox Talks
Providing the Woollam Cwith the Contracts Administrator / Project • Supplied to Contract Partners
WHS Management Plan. Manager – during the letting of contracts.
• Site Manager will make
Preparing, maintaining and making accessible in the site office.
Site Manager -
accessible the register of hazardous • Administration prepares and
substances. Site HSE Adviser -
updates in conjunction with
site foreman.
• Submissions of SWMS are
checked for current training
Ensuring that before starting work history.
Site Manager -
on site all personnel attend suitable • Copies of general induction
Site HSE Adviser -
induction training courses. cards taken during induction
• On site induction process
requires proof of training
• Incidents are to be investigated
Site Manager - and recorded on the Incident
Incident Reporting. Investigation Report and
Site HSE Adviser -
notification as per the Incident
Notification Flowchart.
Site Manager – • The work site is to be secured
Site Access and Egress. and safe access and egress is to
Site HSE Adviser -
be developed and maintained
• Copies of SWMS, Induction,
accident reports etc are kept on
Site Manager - site.
Keeping OHS Records. Office Administrator – • On completion of Project, OHS
Site HSE Adviser – Records are archived as per
Records Management
Procedure
Project Manager – • Identify and document health
hazards and risks for individual
Site Manager - project by using the Project
Health Risk Assessment and
Site HSE Adviser -
discuss at Project Start-up
Health Surveillance and Exposure
HSEQT Manager – Meeting
Monitoring
• Amend the WHS Management
Formally Trained Health Plan according to the Risk
Professional Assessment
Formally Trained Health • Communicate the Health
Professional / Occupational Surveillance Program at Site
Hygienist Inductions for Woollam
WHS Management Plan / Page 45
Page 41
25. Statement of Responsibilities
Activity Responsible Person Type of action and records
Project Manager – • Hazard Risk Register in WHS
Hazard identification, assessment Site Manager – Management Plan
and control. Site HSE Adviser – • Project Health Risk Assessment
HSEQT Manager – • Hazard Report
Project Manager – • Surveillance
Compliance with State Legislation, Site Manager - • Task Observation
Appropriate Standards, Codes of
Practice and Site Safety Rules. Site HSE Adviser – • Safety Interactions
HSEQT Manager –
• Review of Contract Partner’s
Safe Work Method Statements
Project Manager –
Assessment of Contract Partners • Task Observations and Safety
Site Manager -
OHS capabilities and performance Interactions
on the job. Site HSE Adviser –
• Site Audits
HSEQT Manager –
• Contract Partner Tender
Interview
• Register of Injuries
Workplace injury management and HSEQT Manager – • Medical Certificates and
rehabilitation. Workers’ Compensation
HSE Adviser –
documents will be held at
Regional Office
• Site induction for all employees
and Contract Partners
Project Manager –
Consult and Communicate OHS&R • Toolbox talks and Daily Pre-
Site Manager –
information to all site personnel in start meetings.
the lead up to and during project. Site HSE Adviser -
• Safety Alerts
HSEQT Manager -
• WHS Management Plan sent to
Contract Partners
Provide general construction, work Site Manager - • Site induction for all Woollam
activity and site-specific induction Constructions’ employees and
training to all site personnel. Site HSE Adviser -
Contract Partners
• All Woollam Constructions’
Sites have first aid kits.
Project Manager – • First Aid Providers’ names and
Provide first aid equipment and Site Manager - contact numbers posted in the
maintain first aid stocks. Site HSE Adviser - crib room and site office.
HSEQT Manager - • Contract Partners to provide
name and contact details for
their first aid providers
• Site induction for all Woollam
Constructions employees,
Contract Partners, and visitors.
Manage accident and emergency Site Manager -
• Emergency Evacuation Drill
procedures. Site HSE Adviser -
• Registers updated regularly.
• Regular inspections of first aid
kit contents
Making sure that the Site Safety Project Manager – • Site Safety Rules developed for
Rules are available and provided to Site Manager - the Project.
WHS Management Plan / Page 44
Page 42
WHS Management Plan / Page 39 [OCR of page images] 34 = Compote Checeneed? Lint Controts Betow bn the Comments section. High Rick Activity « Mobile Plant ieteraction (where 2 oF reore mectile plant le working in proakréty) 41 Aen eek permits repent? £2 be pre pherwring requires | o sereiees hevteten, sequired dereemertater? 42) Other Wades steed by tie acthty? Lint aden Setow in the Comments ection 44 = Commate Checeneed? Lint Contncts Betow bn the Comments secuon AS MRI Erere sppropatatety Iiceneed | qualifies operstons avallucie High Mink Activity - Lit inateiietion 51 Are wom permite requined' S2 Hee @ Peet natediotion meeting bees contented 7 52 Ciler Wracten altpeted bry this entity? Lint ination Ieetne in the cgeements sentiion 54 Compete Crecwemed? Lint Contrcte Betow bn the Comments section High Rick Activity - Craseiolst Operations 61 Are weet pereits required Le maintenance of beeen, neietions of prwers? 62 be pre perry rere Lo ting setters , tivities? 62 Diner Westen eftipeted bry thes antietiy? Livi lnedes ieetre in the comments seetinn 64 «= Compote Clecwanet? Uist controts Betow in the Comments section High Rink Activity - Asty Activity Not Covered Abowe Le. working at heights, concrete pumping , working Is live errfromeserts, working near bockes of waner, live electrical Installations. TA Mherity te Nghia eetivity T 2 Are week permite repained? 12 le peepee requires? TA Orher race attend by thin acthdiny? Lint aden Setow in the Comments section TS Compote ctecennee? Uist contscts Betow bn the Comments section. High Rick Activity - Hazardous Material Management Le lead paint removal, anbestos renal 01 Mae the wubatance Deen Cnnaitind and Quancty confemer? 52 Ace werk pereite requined > 22 lt pre punning requerc? 84 Orher races (Pubic attected by the active? BE Comtrnte Gietwened? List cantante behee in the oqmmants sentions? woollam WORKING TOGETHER WHS Management Plan / Page 39 CONSTRUCTIONS TO BUILO LEGAQES
Page 43
24. Consultation, Cooperation
and Coordination
Under the current legislation there is no requirement to establish a safety representative or safety committee,
unless:
• In relation to a health & safety representative – a request is made by a worker.
• In relation to a health & safety committee – a request is made by 5 or more workers or a health &
safety representative.
At the beginning of the project Woollam Construction will assess the need for workgroups, safety
representatives and/or safety committee based upon the size and associated risks of the project. If there is a
requirement for a safety representative, workgroups will be formed, nomination will be requested, and an
election will be arranged (if needed). The safety representative will be provided with the relevant training to
perform this role.
The primary function of a Safety Committee is to assist cooperation between employer, principal contractor,
and worker in developing and carrying out measures to ensure health and safety at a workplace. Workers will
be consulted and given the opportunity to be involved with OHS issues and decisions.
All Safety Committee Meeting will be recorded on the Safety Committee Meeting Minutes.
Consultation occurs in reference to, but is not limited to the following topics discussed in Safety Committee
meetings;
• Legislative Changes
• Objectives and Targets
• Training and education
• Reviewed / Amended Safe Work Method Statements
• Incidents
• Progress on Action Items
• Audits / Inspections
• Hazard Reports
• General Business
The Minutes from Safety Committee Meetings will be posted on Site Safety Notice boards for perusal by the
workers at the workplace.
Issues raised during Toolbox Talks and Safety Committee Meetings, that cannot be resolved at a Site Level, will
be communicated to the Regional HSE Coordinator for resolution. If a resolution is not achieved, the Regional
HSE Coordinator will raise the issues with the Manager HSE who will ensure it will be discussed during the
Leadership Team Meeting for resolution. The results of the resolution at the Leadership Team Meeting will be
communicated to the relevant Regional HSE Coordinators who in turn will notify the site where the issue was
raised by the completing and participating in a toolbox talk with all workers to discuss the results. The Regional
HSE Coordinator will ensure the issues raised are addressed in the prescribed timeframe.
24.1 Supporting Documents
Safety Committee Meeting Minutes
WHS Management Plan / Page 43
Page 44
23. Site Personnel Sign In
All persons entering and exiting the site will sign in and sign out on a cloud-based software system Sign-On
Site.
The following information will be recorded:
• Name.
• Company.
• Date.
• Acceptance of Daily Pre-start
• Time in.
• Time out.
Sign in information will be filled, and can be accessed, through the relevant project online portal.
WHS Management Plan / Page 42
Page 45
27. Incident Management
The Incident Investigation Procedure will be followed for all incidents on this site. Incident investigations will
be recorded on the Incident Investigation Report form.
Where there is a notifiable event, the death of the person, a serious injury or illness or a dangerous incident,
that may require a notice to be sent to the applicable regulatory authority, consult with the Project Manager,
General Manager and/or HSE Manager, who in turn will notify authorities and the in some cases the client.
Incident Investigation Reports will be forwarded to the Regional HSE Coordinator as per the Incident
Investigation Procedure.
All completed Incident Investigation Reports shall be archived as per the Records Management Procedure. In the
event of a notifiable incident, then this WHSMP, and any relevant SWMS, will be retained for a minimum
period of two years.
Project Contact Name 24hr Contact Number
Regional Manager Mitch Perry
Project Manager Bryan Ward
Site Manager TBA
Site HSE Adviser TBA
Regional HSE Coordinator TBA
HSEQT Manager Cameron Stewart
WHS Management Plan / Page 48
Page 46
22. Emergency Drill Evaluation
An Emergency Drill of the site will be conducted in line and in the frequency identified in the Emergency
Preparedness and Response plan. They should be scheduled on site to ensure that they are scenario based and
test a variety of potential emergency situations.
The drill will be analysed, and any follow up actions identified. These details will be recorded on the
Emergency Drill Evaluation form on a cloud-based software system. Once all follow up actions are complete
than the evaluator shall sign the evaluation form.
This form will be kept electronically. A record is also created in Sign-Onsite.
22.1 Supporting Documents
Emergency Drill Evaluation (Procore document)
As found in Procore
WHS Management Plan / Page 41
Page 47
Activity Responsible Person Type of action and records
Constructions employees,
Contract Partner, and Visitors
• Review health risks when
conducting Safety Interactions
• Review health risks when
conducting Safety Task
Observations
• Ensure design documentation
and methodologies developed
by competent persons have
been obtained
• Ensure inspection reports and
verifications have been
obtained from competent
persons where required
• Ensure reports and verifications
have been obtained from a
geotechnical engineer where
Site Manager – required
Site HSE Adviser – • Ensure applicable Work Permits
Creation and Maintenance of
are implemented prior to
Temporary Structures Register Site Engineer – commencing work
Site Foreman - • Ensure only trained and
competent persons perform
work on site
• Ensure designer, inspector and
worker competencies and
qualifications are verified prior
to commencing work
• Ensure that SWMS are provided
for any work that involves
structural alterations or repairs
that require temporary support
to prevent collapse
WHS Management Plan / Page 46
Page 48
High-Risk Licence – CN is required), Piling Rigs,
Scissor lifts
There are other High-Risk Licences, as defined in Schedule 3 of the WHS Regulations, but are not generally found on
Woollam Constructions sites. These are as follows:
• Crane Operation – derrick crane (CD), portal boom crane (CP), bridge and gantry crane (CB),
• Pressure Equipment Operation – standard boiler operation (BS), advanced boiler operation (BA), turbine
operation (TO) and reciprocating steam engine (ES)
• Order picking forklift truck (LO)
• Reach stacker (RS)
29.1 High-Risk Construction Work
Under current legislation all High-Risk Construction Work activities require a Safe Work Method Statement.
High Risk Construction Work is defined as work that:
a) involves a risk of a person falling more than 2 metres, or
b) is carried out on a telecommunication tower, or
c) involves demolition of an element of a structure that is loadbearing or otherwise related to the physical
integrity of the structure, or
d) involves, or is likely to involve, the disturbance of asbestos, or
e) involves structural alterations or repairs that require temporary support to prevent collapse, or
f) is carried out in or near a confined space, or
g) is carried out in or nearby:
i. a shaft or trench with an excavated depth greater than 1.5 metres, or
ii. a tunnel, or
h) involves the use of explosives, or
i) is carried out on or near pressurised gas distribution mains or piping, or
j) is carried out on or near chemical, fuel or refrigerant lines, or
k) is carried out on or near energised electrical installations or services, or
l) is carried out in an area that may have a contaminated or flammable atmosphere, or
m) involves tilt-up or precast concrete, or
n) is carried out on, in or adjacent to a road, railway, shipping lane or other traffic corridor that is in use by
traffic other than pedestrians, or
o) is carried out in an area at a workplace in which there is any movement of powered mobile plant, or
p) is carried out in an area in which there are artificial extremes of temperature, or
q) is carried out in or near water or other liquid that involves a risk of drowning, or
r) involves diving work.
WHS Management Plan / Page 53
Page 49
26. OHS Training
26.1 WHS Management Plan Training
Site Managers/Leading Hands will receive training in the use of this Management Plan using the WHSMP
Training Program on (ELMO) at the commencement of each project. Evidence will be recorded on ELMO.
26.2 Safe Work Method Statement Training
Supervisors, either Woollam or Contract Partners, will train their employees in the requirements of Safe Work
Method Statements when they first enter the work site. Training will be evidenced by the inductees signing
onto the Safe Work Method Statement for their respective tasks / work activities.
Any alterations or amendments to the Safe Work Method Statements will be communicated to the employees
via a Toolbox Talk Meeting, and a copy of the revised Safe Work Method Statement will be posted on the site
Safety Noticeboard for perusal by employees and Contract Partners.
Contract Partners will be required to review and where required amend their Safe Work Method Statements
quarterly.
26.3 Recognition of Contract Partner’s Competency
Woollam Constructions shall ensure all Contract Partners’ workers produce satisfactory evidence as to the
competency of the work they are expected to undertake, through the presentation of the certificates or letters
of competencies, training logbooks and where applicable, licenses. These records will be recorded on a cloud-
based software system. For Operation of Mobile Plant see Section 28 and for High-Risk Construction Activities
see Section 29.
26.4 Supporting Documents
WHSMP Training Program (ELMO Training System)
WHSMP Training Questionnaire (Elmo Training System)
WHS Management Plan / Page 47
Page 50
28. Mobile Plant
Woollam Constructions shall ensure all mobile plant entering or performing work on a Woollam Constructions
site, is safe to use, is being appropriately serviced and maintained in accordance with the Manufacturers
recommendations, Australian Standards, Regulatory requirements and is fit for purpose.
Woollam Constructions shall ensure that the operator of mobile plant holds a current qualification gain
through training with a Registered Training Organisation. See 28.2 for qualification requirements.
Mobile Plant includes, but is not limited to;
• Cranes • Excavators / trenchers • Trucks
• Elevated Work Platforms (EWP’s) • Graders • Forklifts
• Scissor Lifts • Dozers • Backhoes
• Skid Steer Loader • Tractors • Bobcats
Woollam Constructions will ensure that a Plant Risk Assessment and a Safe Work Method Statement is
completed for each item of mobile plant prior to undertaking any activities on site. The Plant Risk Assessment
and Safe Work Method Statement must cover the safe operating procedures for the plant including
maintenance, service, inspection details and any commissioning on site prior to use.
The relevant Contract Partner must complete the Mobile Plant Checklist prior to equipment being used on site.
Where any element of this checklist is not acceptable, the plant owner shall ensure rectification prior to the
mobile plants use on site. The completed Mobile Plant Checklist shall be saved as on a cloud-based software
system and linked to Site Diary Equipment Section.
Woollam Constructions shall ensure plant onsite is maintained by regularly reviewing the scheduled
maintenance requirements documented on the Mobile Plant Checklist and in the Site Diary Equipment
Section. If maintenance is undertaken whilst on site, then the Mobile Plant Checklist and Site Diary Equipment
Section should be updated to include the next scheduled maintenance date.
Further to this Woollam Constructions will inspect daily prestart checklists completed for each plant. In some
cases, copies of these checklists will be kept with the plant operator’s SMWS.
28.1 Mandatory Mobile Plant Inspections
Following is a list of required inspection and maintenance for Contract Partners to provide for specific items of
Mobile Plant:
Mobile Plant Inspection and Servicing Requirements
Inspection frequency and
Plant Type Person responsible for inspection Australian Standard
record requirements
Operator (daily), Mechanic Daily, Monthly,
Concrete Line Pump AS 2550.15 COP
Engineer with relevant experience Yearly, 6 yearly
Operator (daily), Mechanic Daily, Monthly,
Concrete Boom Pump AS 2550.15 COP
Engineer with relevant experience Yearly, 6 yearly
Upon installation,
Construction wiring Licensed Electrician AS3012
then every 6 months
Daily Monthly,
Crane- mobile Operator (daily), Mechanic AS 2550 Independent yearly,
Crane – mobile >10t Engineer with relevant experience AS 1418 independent 10 yearly (5
yearly thereafter)
WHS Management Plan / Page 49
Page 51
Daily
Quarterly (service),
Independent yearly
Crack testing slew ring
Operator (daily), Mechanic AS 2550 bolts 5 yearly
Crane - Tower Independent 10 yearly (5
Engineer with relevant experience AS 1418
yearly thereafter)
Independent inspection of
tower crane at least once
in the duration of the
project
Elevated work Operator (daily), Manufacturer, Daily,
platforms Excluding engineering tradesperson AS 2550.10 3 monthly, yearly, 10
boom lift engineer with relevant experience yearly
Operator (daily), Manufacturer, Daily,
Elevated work engineering tradesperson AS 2550.10 3 monthly, yearly, 10
platforms Boom lift
engineer with relevant experience yearly
Operator (daily), manufacturer, Regular inspection &
Forklift truck engineering tradesperson AS 2359.2 maintenance as per
engineer with relevant experience manufacturer
Daily,
Operator 3 monthly, yearly 10
Men and Materials AS 2550.7 yearly, independent
Hoist Licensed crane operator, dogman
AS 1418 inspection at least once in
or rigger
the duration of the
project;
Daily, pre-start
Mobile & Static Plant Operator Mechanic COP Regular inspection to
manufacturers
specification.
28.2 Operator Qualifications
Operators of moving mobile plant shall hold the relevant and current qualification from the list below – all
workers on a construction site must have a General Induction (Blue or White Card) or equivalent
Plant Item Qualification
Excavator RIIMPO320F - Conduct Civil Construction Excavator Operations
Skid Steer Loader RIIMPO318F - Conduct Civil Construction Skid Steer Loader Operations
Grader RIIMPO324F - Conduct Civil Constructions Grader Operations
Roller RIIMPO317F - Conduct Roller Operations
Water Truck RIIMPO326E - Conduct water vehicle operations
Backhoe RIIMPO319E - Conduct Backhoe / Loader Operations
Dozer RIIMPO323E - Conduct Civil Construction Dozer Operations
WHS Management Plan / Page 50
Page 52
Front End Loader RIIMPO321F - Conduct Civil Construction Wheeled Front End Loader Operations
Elevation Work Platform –
Scissor Lift
RIIHAN301E - Operate Elevating Work Platform
Elevation Work Platform –
Boom Type < 11m
Truck – 2 axle GVM of more
Medium Rigid License
than 8 tonnes.
Truck - multi-axle greater than
Heavy Rigid License
8 tonnes GVM
Heavy Rigid (HR class) vehicles
with an attached trailer that
Heavy Combination License
has a Gross Vehicle Mass
(GVM) over 9,000 kg.
28.3 Supporting Documents
- Mobile Plant Checklist (located in Procore)
- Mobile Plant Prestart (located in Procore)
- Procore Site Diary Equipment Section (located in Procore)
WHS Management Plan / Page 51
Page 53
29. High Risk Work
Woollam Constructions shall not allow a worker to perform high risk work unless the worker has appropriate:
• High risk work licence for that class of high-risk work (refer: Schedule 3 WH&S Regulation and below)
• Safe Work Method Statement
Workers operating, or performing the high-risk work, shall hold and record on the Site Induction Record the
appropriate competency or qualification.
High Risk Work Minimum Requirements – all workers on a construction site must have a General
Induction (Blue or White Card) or equivalent
Activity Minimum Requirement
Scaffolding – over four metres (At least one
member of the erecting team to have a High- High Risk Licence – SB
Risk Licence – SB, SI, SA)
Tower Crane High Risk Licence – CT
Self-Erecting Tower Crane High Risk Licence – CS
Vehicle Loading Crane (Hi-ab) High Risk Licence – CV
Non-slewing Mobile Crane High Risk Licence – CN
Crane Operation Slewing Mobile Crane – up to 20T High Risk Licence – C2
Slewing Mobile Crane – up to 60T High Risk Licence – C6
Slewing Mobile Crane – up to 100T High Risk Licence – C1
Slewing Mobile Crane – over 100t High Risk Licence – C0
Dogging High Risk Licence – DG
Rigging – required for all structural steel
High Risk Licence - RB
erection
Material Hoist High Risk Licence – HM
Personnel and Materials Hoist High Risk Licence – HP
Boom type elevating work platform – EWP over
High Risk Licence – WP
11m
Concrete Placing Boom Pump High Risk Licence – PB
Forklift High Risk Licence – LF
Mobile Plant Operation – Excavators, Skid Steer Any of the following:
Loaders, Backhoes, Dingoes, Rollers, Telescopic
Handlers (if a jib or outriggers are being used • Previously issued High Risk Licence
then this is consider a non-slewing crane and a • Relevant competency issued by an RTO.
WHS Management Plan / Page 52
Page 54
30. Electrical
A register of equipment must be kept on site. This register may be kept on the follow WC OHS 095 Site
Equipment Register or another similar register. Sub-Contractors are responsible for maintaining their own
equipment, registers and must always have it available on site for inspection.
All equipment (including hand and power tool, safety harnesses and safety equipment) must be checked by a
competent person before using to ensure they are safe and appropriate for the task being performed.
All electrical equipment which is intended to be used on this project shall be compliant with the requirements
of AS/NZS 3012 Electrical Installations – construction and demolition sites.
Woollam Constructions shall ensure that electrical systems installed for use during construction works are
inspected and certified as correctly installed prior to use in accordance with relevant legislation, codes of
practice and Australian standards. Evidence of these inspections will be recorded on the WC OHS 053 Electrical
Isolation Checklist completed by a licensed electrician or in Procore.
Woollam Constructions shall ensure that emergency procedures are established specific to the electrical scope
of works.
No electrical equipment is to be brought on to site unless it is tested and tagged by a competent person, in
accordance with AS/NZS 3760 In-Service Safety Inspection & Testing of Electrical Equipment.
30.1 Electrical Equipment Lock Out
Any equipment found to be damaged or unsafe must be “locked out” using an out of service tag or signage or
some other means of ensuring no one uses the faulty equipment. Information must be recorder in the Site
Equipment / Testing Register.
The faulty/damaged/unsafe equipment must:
• Removed from service.
• Reported to the Site Manager (or their delegate) as soon as possible.
• Repaired or removed from site as soon as possible.
• If un-repairable, the equipment should be destroyed and disposed of appropriately.
• The relevant register altered.
Lock out tags or signage may only be removed by the Site Manager (or their delegate) after ensuring the
equipment is again safe to use (advise from a competent person may be required).
30.2 Electrical Isolation
Electrical Contractors who are required to install, alter, or repair electrical installations must complete the WC
OHS 053 Electrical Isolation Checklist in Procore, including signing off on Section 4 or a similar signed off
document and follow their lock out procedure described in their safe work method statement prior to
undertaking these tasks.
Once the electrical isolation work is complete, the licensed electrical contractor will be required to sign off to
confirm the electrical installation is safe and operable.
WHS Management Plan / Page 54
Page 55
30.3 Supporting Documents
Electrical Isolation Checklist
As found in Procore
WHS Management Plan / Page 55
Page 56
WHS Management Plan / Page 56 [OCR of page images] a5 Do you have a Safe Work Method Statement for the task at hand? This should identify the risks and and state the contro! measures required to eliminate or minimise the risk 3.6 = Are. you trained, competent and comfigent im applying particular procedures or techniques that are required for the task? 37 Have you checked to ensure that your tools and accessories are insulated and have been ieapected and maintained to ensure they are serviceable 7 3.8 ts you test equipment appropeiate to the task and functioning correctly? 3.9 Are you wearing the appeopriate clothing and PPE for the task? 3.10 Do you have the appropriate insulsted mats and sheeting? 3.11 ts a safety observer prosont? 3.12 Aro the necessary first aid facilities provided and accessible and aro unauthorized persons prevented from entering the work area? Part 4 AFTER COMPLETING INITIAL ISOLATION AND TESTING IN WORK AREAS at After isclation and testing | have tested to the best of my knowledge and physical ability to access services in the work ares. Any cables! services which are still found to be energised after testing have been marked in accordance with the current AS/NZS 1012 42 Ihave identified energised services using different cable sheaths of a different colour 4.3 Ihave attached yellow tape spaced # intervals of mo leas than Sem marked with the words constructice wiring PART 5 AFTER COMPLETING THE WORK ( FINAL INSPECTION) 5.1 Have the installations/ circults‘equipment been restored to a safe and operable condition? 52 Have alll tags and locking off devices been removed? 53 | have Inspected and tested to the best of my knowledge and physical ability to access services in the work area and find them undamaged. wool lam / WORKING TOGETHER WHS Management Plan / Page 56 CONSTRUCTIONS TO BUILO LEGAQES
Page 57
31. Work Permit Systems
The requirement for, and frequency of, Work Permits at any particular project will be discussed during the
Project Start Up Meeting. The Project Manager will make the final call on which Work Permits are required.
The following table will nominate the work permits required and the frequency the work permits will be
required to be completed:
Frequency
Required
Work Permit Title (Every day, weekly, change of tasks, at the start of works
(Y/N)
etc)
Confined space
Excavation
Hot works
Penetrations – drilling through
walls
Working at heights
Asbestos Management
Respiratory Crystalline Silica
Workers planning to undertake these tasks are required report to Site Management and identify which work
permits will be required. Work Permits are available on a cloud-based software system,
Upon completion of the activity, the worker will report back to the Site Office and sign off on the Work Permit.
All completed documents will be stored electronically.
WHS Management Plan / Page 57
Page 58
32. Temporary Works Register
The purpose of the Temporary Works Register is to track and ensure that all temporary works are installed,
inspected/checked, maintained, and dismantled as per the design without incident or injury to workers or
members of the public. This document is to be used in conjunction with the Project Hazard/Risk Register.
The Temporary Works Register is to be created at the beginning of a project after the Project Start Up
Meeting and in conjunction with the site-specific amendment of the Project Hazard/Risk Register to identify
temporary works on the project. Risk assessment of temporary works will be conducted in the Project Hazard
Risk/Register and managed as described.
The Temporary Works Register will be maintained and populated by a person nominated in the Project Start
Up Meeting. The document will be reviewed on a weekly and monthly basis by Regional HSE Co-ordinator, Site
Advisor and / or Site Engineer. This applies to all temporary works that are designed and executed on Woollam
projects. This includes:
• Earthworks (e.g. trenches, excavations, temporary slopes, piling platforms)
• Structures (e.g. formwork, falsework, propping, façade retention, needling, shoring, edge protection,
screens, scaffolding, site hoarding and signage, covered walkways, gantries/overhead protection,
crane landing platforms, site fencing, amenities)
• Equipment/plant foundations (e.g. tower crane bases, crane and hoist ties, groundworks to provide
suitable base for plant erection such as mobile plant and piling rigs, covers for pit holes / penetrations
/ risers / shafts, braces for masonry walls)
Temporary works designs will be categorised to indicate the complexity/simplicity of the specific temporary
works structure and the potential risk based on the nature of the works, site conditions, and environment of
the work area. Categories include:
• Low Complexity – Temporary Works which generally require no design analysis
• Medium Complexity – Temporary Works comprising of proven design solutions and materials
• High Complexity – Temporary works comprised of complex/mixed systems or bespoke solutions
All items of temporary works identified in the Temporary Works Register shall be assigned a competent
person or Company who is responsible for the checking of the design and/or specification of each item. The
independence of the design checker to the designer shall be as set out using the Design Check Categories 0, 1,
2 and 3 and as agreed with Woollam. See below table:
Design
Check Scope Comment
Category
Restricted to standard solutions only, to ensure the site conditions do This applies to the use of standard solutions and
not conflict with the scope or limitations of the chosen standard not the original design, which requires both
0
solution. These may include standard trench boxes. structural calculation and checking to Category 1, 2
or 3, as appropriate.
For simple designs. These include - formwork; falsework and Such designs would be undertaken using simple
1 propping to brickwork openings in single story construction. methods of analysis and be in accordance with
the relevant standards, supplier’s technical
literature or other reference publications.
On more complex or involved designs. Designs for Category 2 checks would include designs where
excavations including excavation support using sheet piles, for a considerable degree of interpretation of
2 foundations, for structural steelwork connections, for loading or soils’ information is required before
reinforced concrete. Designs where stability is obtained by the design of the foundation or excavation
restraint at the top of the temporary works (e.g. top- support, or slope is carried out.
restrained falsework).
For complex or innovative designs, which result in complex These designs include unusual designs or where
3 sequences of moving and/or construction of either the temporary significant departures from standards, novel
works or permanent works. It also includes basement excavations and methods of analysis or considerable exercise of
tunnels. engineering judgment are involved.
WHS Management Plan / Page 58
Page 59
32.1 Supporting Documents
- Project Hazard and Risk Register
- Procore Inspection Matrix
- Temporary Works Register
- Woollam Permits to Work
- HSE Planning Tool
- Weekly HSE inspection
- Monthly Site Audit
WHS Management Plan / Page 59
Page 60
33. Management Systems Policy
WHS Management Plan / Page 60
[OCR of page images]
33. Management Systems Policy
v v
oy
A woollam
v
v Buin v SINCE 1884
Woollam way
Wootlam has a long proud history in construction. We are commilted to maintaining the highest
standard which gives os a reputation that is synonymous with quatily and reliability. By working
together with our clients and colleagues and promoting the principtes of ‘best practice’ we vii
provide our services in a safe, competitive, efficient, retiable and environmentaily sustainante
manner.
Wherever we operate we will
« Aim to achieve our goal of zero harm to peapte and the environment,
© = Gevelop and review meaaurabte objectives and targets that promote continuous
improvement of our environmentat, quatily, health and safety performance;
* $Prevent pottution and minimise any edverse effects cur operations may have on the
environment;
* Promote a work culture that achieves corporate targets through work/life balance, sate
behaviour, environmental awareness and use of quality systems;
* Comply with relevant legisiation and regulations; Commeanweatth, State, Territory or Public
Heatth Orders and other reauiremants retevent to operations;
» Clearty document environmental, quality, heaith and safety roles and responsibilities and
ensure that they are clearly communicated, understood and accepted,
* €nsure personnel and contractors have the secessary information, training, resources and
Supervision to meet regulatory and corporate requirements;
» Strive lo understand our customers’ needs, meet their requirements and aim for total
customer satisfaction;
» Se honest, consistent and fair in our deatings wilh our clients, contractors and suppliers;
» We will demonstrate these commitments by meeting the requirements of ISO14001, ISO#OOt
and AS/NZS45001.
ko
Craig Percival
Managing Director
1 September 2022
WHS Management Plan / Page 60
Page 61
34. APPENDICES
WHS Management Plan / Page 61
[OCR of page images]
34. APPENDICES
woollam / wornerocerer
Page 62
Appendix 1 – Project Hazard/Risk
Assessment
WHS Management Plan / Page 62
[OCR of page images]
Appendix 1 — Project Hazard/Risk
Assessment
woollam f WORKIN THER WHS Management Plan / Page 62
Used in these records
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.