Skip to the record
Accept no substitutions.

Council archive · source document

WHS Management Plan Ozcare Noosa RACF WC OHS 002 Rev 23 4 July 2023 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy · OPW24/0118

of 62

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
5. Site Safety Rules
Any safety non-compliance regarding the Employees or Contract Partners workplace, work activities, plant and
equipment, non-compliance to their Safe Work Method Statements, or non-compliance to Woollam
Constructions Site Safety Rules will adversely affect the Employees and Contract Partners continuation of work
with Woollam Constructions.
    •    First warning will be verbal, name registered, and Hazard Report issued;
    •    Second warning will be re-induction to site for the worker and supervisor. This will include retraining
         in SWMS. A Second Hazard Report will be issued.
    •    Third warning and Hazard Report issued, and Woollam Constructions will ask the employee / Contract
         Partner to show cause within 24 hours, as to why the employee / Contract Partner should not be
         removed from site.

5.1 Site Entry Requirements
    •    All workers must present a General Safety Induction Card. No worker will be able to conduct site
         works without a General Induction Card.
    •    All workers must report to the site office, sign in and notify Woollam Staff of arrival and submit a Site-
         specific site induction.
    •    Visitors to site must be involved in a brief Site Induction and be escorted by an inducted member of
         the Woollam team at all times.
    •    All workers to be familiar with emergency Preparedness and Response Plan before entering site.
    •    Workers are required to park their personal vehicles as instructed by the Site Manager/Site HSE
         Adviser, failure to do so a first warning will be issued.
    •    All Contract Partners and workers to sign in on the cloud-based software system.
    •    Where a workers numbers board has been deemed required, Contract Partner workers numbers to
         be updated daily.

5.2 Prestart
Prestart meetings are to be attended every morning by all Contract Partners and Contract Partners Supervisor.
Special high risk prestart to be attended by supervisors on site to ensure all workers are aware of up-and-
coming high-risk tasks e.g. post tensioning, crane lifts, confined spaces etc. All workers to sign prestart as part
of the sign in / sign out procedure. As well as acknowledge they accept the information in the prestart via Sign-
Onsite.

5.3 Safe Work Method Statements
Once the Site Manager/ HSE Adviser has approved the Contract Partners Safe Work Method Statement, the
Contract Partner will comply with their Safe Work Method Statement, the Principal Contractors WHS
Management Plan and the Site Safety Rules at all times. Review of SWMS to be conducted quarterly or as per
site requirements. Adherence to those SWMS will be confirmed via Task observations and Safety Interactions
through Procore.

5.4 Personal Protection Equipment
5.4.1 Head Protection
    •    The wearing of hard hats is mandatory at all times whilst on site.




                                                                                     WHS Management Plan / Page 17

Used in these records

About this file

File size
1.3 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHS Management Plan Ozcare Noosa RACF WC OHS 002 Rev 23 4 July 2023 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads -.pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.