8. Hazardous Substance and
    Dangerous Goods Register
Hazardous Substances and Dangerous Goods brought to site for Woollam Constructions use shall be listed in
the project Hazardous Substance and Dangerous Goods Register along with a current SDS. A risk assessment
will be conducted with the completed form also listed in the register for all hazardous substances and
dangerous goods except for those that are identified as household products and are used in that same manner.
Woollam Construction employees who handle hazardous substances or dangerous goods shall read,
understand, and sign off on the applicable SWMS and Risk Assessment.
Contract Partners shall provide the Site Manager with a completed Hazardous Substance and Dangerous
Goods Register, an accompanying Risk Assessment, and current Safety Data Sheet (SDS) before they are
brought onto site. A copy of the Risk Assessment and SDS’s will always be kept in the Site Office and / or First
Aid Room, at the storage location of the substance and be readily available to workers.
Contract Partners shall be responsible for providing a Safe Work Method Statement (SWMS) that documents
the control measures they will implement to mitigate the potential of their workers and others from being
exposure to risk or harm. Employees shall adhere to the health and safety requirements outlined in their
respective SWMS, SDS’s and Risk Assessments for all Hazardous Substances and Dangerous Goods used whilst
completing their work activities.
Contract Partners shall be responsible for the safe storage and handling of their Hazardous Substances and
Dangerous Goods
Compliance with this process will be reviewed and monitored using the Weekly Safety and Environmental
Inspection and Monthly HSE Audit.

8.1 Supporting Documents
Hazardous Substance Register
Hazardous Substance Training Presentation (ELMO)
Hazardous Substance Management Procedure




                                                                                   WHS Management Plan / Page 25

Used in these records

About this file

File size
1.3 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHS Management Plan Ozcare Noosa RACF WC OHS 002 Rev 23 4 July 2023 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads -.pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.