13. Site Induction
In accordance with relevant state legislation, Woollam Constructions shall ensure a person has attended
General Construction Safety Induction Course and been given a Site-Specific Induction for the workplace
before allowing the person to start construction work. In addition to the Site-specific induction, all workers
when possible are to complete the Woollam Safety Induction prior to commencing work on site.
Evidence of the General Construction Safety Induction, the Woollam Safety Induction, the Site-Specific
Induction and any applicable high-risk licence shall be recorded on a cloud-based software system Sign On-site.
All visitors will be required to be part of brief site-specific induction. All visitors to site need to be accompanied
by an inducted person and have been made aware of major hazards and the daily prestart by said Inducted
person. Visitors will also need to sign into the project via the Sign-Onsite app and sign out when they leave
site. The Site Induction Guide / Template is to be used during the site-specific induction and be made site
specific prior to presentation.
Before onsite induction is to commence all equipment servicing, certification or calibration evidence and
records need to be provided to the Site Manager of HSE representative. This evidence needs to be needs to be
compiled in a register of format that is easily referenced.
Topics to be covered in the Site-Specific Induction include:
• Project details
• Project goals
• Top project risks
• Site specific emergency Response Procedures
• Site entry requirements including PPE requirements.
• Emergency evacuation and contact details.
• Site specific information including working hours, delivery information and parking arrangements.
• Woollam Way policy
Topics to be covered in the Woollam Safety Induction include:
• The Golden Rules
• Safe work method statements
• Working at heights
• Site Safety Rules
• Young workers
• Mental health
• Software systems
• Primary hazards
• Plant and equipment requirements.
• Consultation
• Right of entry
• Health surveillance and exposure monitoring
• COVID 19 requirements
13.1 Supporting Documents
Site Induction Record (electronic form available on Sign Onsite)
Site Induction Guide / Template
WHS Management Plan / Page 31
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHS Management Plan Ozcare Noosa RACF WC OHS 002 Rev 23 4 July 2023 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.