29. High Risk Work
Woollam Constructions shall not allow a worker to perform high risk work unless the worker has appropriate:
• High risk work licence for that class of high-risk work (refer: Schedule 3 WH&S Regulation and below)
• Safe Work Method Statement
Workers operating, or performing the high-risk work, shall hold and record on the Site Induction Record the
appropriate competency or qualification.
High Risk Work Minimum Requirements – all workers on a construction site must have a General
Induction (Blue or White Card) or equivalent
Activity Minimum Requirement
Scaffolding – over four metres (At least one
member of the erecting team to have a High- High Risk Licence – SB
Risk Licence – SB, SI, SA)
Tower Crane High Risk Licence – CT
Self-Erecting Tower Crane High Risk Licence – CS
Vehicle Loading Crane (Hi-ab) High Risk Licence – CV
Non-slewing Mobile Crane High Risk Licence – CN
Crane Operation Slewing Mobile Crane – up to 20T High Risk Licence – C2
Slewing Mobile Crane – up to 60T High Risk Licence – C6
Slewing Mobile Crane – up to 100T High Risk Licence – C1
Slewing Mobile Crane – over 100t High Risk Licence – C0
Dogging High Risk Licence – DG
Rigging – required for all structural steel
High Risk Licence - RB
erection
Material Hoist High Risk Licence – HM
Personnel and Materials Hoist High Risk Licence – HP
Boom type elevating work platform – EWP over
High Risk Licence – WP
11m
Concrete Placing Boom Pump High Risk Licence – PB
Forklift High Risk Licence – LF
Mobile Plant Operation – Excavators, Skid Steer Any of the following:
Loaders, Backhoes, Dingoes, Rollers, Telescopic
Handlers (if a jib or outriggers are being used • Previously issued High Risk Licence
then this is consider a non-slewing crane and a • Relevant competency issued by an RTO.
WHS Management Plan / Page 52
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHS Management Plan Ozcare Noosa RACF WC OHS 002 Rev 23 4 July 2023 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.