Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

WHS Management Plan Ozcare Noosa RACF WC OHS 002 Rev 23 4 July 2023 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy · OPW24/0118

of 62

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
33. Management Systems Policy




                      WHS Management Plan / Page 60


[OCR of page images]
33. Management Systems Policy

v v

oy
A woollam

v
v Buin v SINCE 1884

Woollam way

Wootlam has a long proud history in construction. We are commilted to maintaining the highest
standard which gives os a reputation that is synonymous with quatily and reliability. By working
together with our clients and colleagues and promoting the principtes of ‘best practice’ we vii
provide our services in a safe, competitive, efficient, retiable and environmentaily sustainante
manner.

Wherever we operate we will
« Aim to achieve our goal of zero harm to peapte and the environment,

© = Gevelop and review meaaurabte objectives and targets that promote continuous
improvement of our environmentat, quatily, health and safety performance;

* $Prevent pottution and minimise any edverse effects cur operations may have on the
environment;

* Promote a work culture that achieves corporate targets through work/life balance, sate
behaviour, environmental awareness and use of quality systems;

* Comply with relevant legisiation and regulations; Commeanweatth, State, Territory or Public
Heatth Orders and other reauiremants retevent to operations;

» Clearty document environmental, quality, heaith and safety roles and responsibilities and
ensure that they are clearly communicated, understood and accepted,

* €nsure personnel and contractors have the secessary information, training, resources and
Supervision to meet regulatory and corporate requirements;

» Strive lo understand our customers’ needs, meet their requirements and aim for total
customer satisfaction;

» Se honest, consistent and fair in our deatings wilh our clients, contractors and suppliers;

» We will demonstrate these commitments by meeting the requirements of ISO14001, ISO#OOt
and AS/NZS45001.

ko

  

Craig Percival
Managing Director

1 September 2022

       

 

WHS Management Plan / Page 60

  

Used in these records

About this file

File size
1.3 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHS Management Plan Ozcare Noosa RACF WC OHS 002 Rev 23 4 July 2023 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads -.pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.