Skip to the record
Beware of cheap imitations.

Council archive · source document

WHS Management Plan Ozcare Noosa RACF WC OHS 002 Rev 23 4 July 2023 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy · OPW24/0118

of 62

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
1. WHS Management
1.1 WHS Management Manual
It is a generic document outlining the WHS Measure Woollam implements as a business. A hard copy of the
document will be included with the develop of each WHS Management Plan.

1.2 WHS Management Plan
The WHS Management Plan is a generic document that is amended according to the site-specific health and
safety requirements of each construction project.
A copy of the WHS Management Plan will be sent to all contracted Contract Partners prior to them mobilising
to site for their review. All workers will be informed of the contents of the WHS Management Plan during their
site-specific induction. All amendments to the plant, during the project construction, shall be communicated to
all workers at the next available Pre-start Meeting.
A review of the WHS Management Plan will be conducted by the respective Regional HSE Coordinator when
they are conducting a Site Review. The Site Review will be conducted at least six (6) times during a calendar
year and will be recorded in Procore utilising the Site Review Checklist.
Amendments to the Workplace Health and Safety Management Plan including all relevant details will be
recorded on the Table below.
                              See Appendix 3 for the WHS Management Manual

                            WHS Management Manual Amendments Record


 Revision Date          Revision Details

  15/10/2022            Minor amendments

                        Additional RCS controls and Dust Management Plan inclusion. Additional COP in
  08/03/2023
                        formation

  02/01/2024            Minor Procedural Changes

  05/03/2024            Inclusion of separate Hazard / Risk Register as a standalone document.




                                    WHS Management Plan Review

 Date                   Name                          Role                         Signature

  15/10/2022            Cameron Stewart               HSEQT Manager


  22/02/2023            Cameron Stewart               HSEQT Manager




                                                                                   WHS Management Plan / Page 7

Used in these records

About this file

File size
1.3 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHS Management Plan Ozcare Noosa RACF WC OHS 002 Rev 23 4 July 2023 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads -.pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.