3. No boatlifting devices are to be attached or moored at the pontoon structure for the
purpose of elevating a vessel above the water without Council approval.
4. The catwalk must be constructed in a manner to render the underside area vermin
proof.
5. There must be no electrical reticulation system carrying electricity in excess of 24
volts beyond the revetment wall unless all switches and power outlets are
positioned above the 1%AEP flood level.
6. Lighting associated with the use must be designed, installed, operated, and
maintained in accordance with Section 3 of AS4282 Control of the Obtrusive
Effects of Outdoor Lighting.
7. The pontoon is to be used for private purposes only and no commercial operations
are to be undertaken.
8. Boat repair activities are not permitted on site.
9. Wastewater and sullage must only be disposed of at approved pumpout facilities.
10. The mooring facility must not be utilised for live-aboard purposes.
11. Any construction and post construction activity is not to impact on the condition of
the waterway, and is to be conducted so as not to breach the Environmental
Protection Act (EPA) 1994 and the Environmental Protection (Water) Policy 2009.
12. The approval or conditions do not constitute a ruling on structural safety and the
applicant must make their own arrangements to ensure adequacy of design and
work. Also any approval granted does not warrant that such plans and
specifications have been checked in detail, nor does it absolve the owner of the
land from complying with all the conditions of this approval and/or relevant Council
By-Laws and Policies and/or relevant statutes and/or statutory regulations in the
execution and/or performance of said works. The Council does not accept any
responsibility for the accuracy of such plans and specifications as approved.
13. Certification by a Registered Professional Engineer of Queensland must be
submitted to Council. The certification must state that the pontoon and associated
structures have been constructed in accordance with best practice methods, are in
accordance with Coastal Protection and Management Act 1995, are structurally
sound and will have no detrimental affect on the existing revetment walls.
14. A final inspection and approval of the structure by Council’s Inspector is also
required. Please contact Council’s Planning Assessment Section (Development
Audit & Response Officer 0428738563) to arrange the inspection.
15. This approval lapses where the construction of the pontoon has not been
commenced within two (2) years of the date of issue of the approval, unless
application is made and approved by Council for an extension.
16. After completion, the proposed works must be maintained in a sound state of
repair in accordance with the approved plans
17. All necessary State government approvals relating to this development must be
obtained prior to any works commencing on the site
Page 2 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice OPW14-0034 55 Wyuna Dv NoosavilleRelated documentApplication case desk ↗
About this file
- File size
- 45 KB (small file)
- File type
No other editions are linked here.