Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

2019-09-10 P&E Agenda - Item 1 - Attachment 1 - Noosa Shire Council Charges Resolution (No 4) 2019

of 30

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                    Attachment 1 to Item 1
                    Planning & Environment Committee Agenda
                    10 September 2019




Noosa Shire Council
Charges Resolution (No.4) 2019



Effective Date: 23 September 2019
Log in to download the original file

2019-09-10 P&E Agenda - Item 1 - Attachment 1 - Noosa Shire Council Charges Resolution (No 4) 2019(PDF, 652KB).pdf · 668 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 29 sections

Section 2

                                                               2
                                                      Noosa Shire Council
                                                 Charges Resolution (No.4) 2019



Noosa Shire Council
Charges Resolution (No.4) 2019

Contents

                                                                                                                                                  Page
Part 1   Introduction ................................................................................................................................. 4
1.       Preliminary ................................................................................................................................... 4
         1.1      Short title                                                                                                                           4
         1.2      Planning Legislation                                                                                                                  4
         1.3      Effect                                                                                                                                4
         1.4      Purpose of the resolution                                                                                                             4
         1.5      Interpretation                                                                                                                        4
2.       Application of the adopted infrastructure charge ................................................................... 7
         2.1      Purpose                                                                                                                               7
         2.2      Effect of the Chapter 4 of the Planning Act 2016 in the local government area                                                         7
         2.3      Application of the resolution to the local government area                                                                            7
         2.4      Application to particular development                                                                                                 7
         2.5      Categorisation of uses to development classes                                                                                         8
3.       Assumptions about future development .................................................................................. 8
         3.1      Purpose                                                                                                                               8
         3.2      Development assumptions about future development                                                                                      8
4.       Priority infrastructure area ......................................................................................................... 8
         4.1      Purpose                                                                                                                               8
         4.2      Priority infrastructure area                                                                                                          8
Part 2   Trunk infrastructure networks ................................................................................................... 9
5.       Trunk infrastructure plans ......................................................................................................... 9
         5.1      Purpose                                                                                                                               9
         5.2      Schedule of works for trunk infrastructure                                                                                            9
         5.3      Trunk infrastructure network systems and items                                                                                        9
         5.4      Trunk infrastructure plans                                                                                                            9
6.       Desired standard of service ....................................................................................................... 9
         6.1      Purpose                                                                                                                               9
         6.2      Desired standards of service for trunk infrastructure                                                                                 9
7.       Establishment cost for trunk infrastructure networks ............................................................ 9
         7.1      Purpose                                                                                                                               9
         7.2      Establishment cost for a trunk infrastructure network                                                                                 9


                                       Council Resolution effective 23 September 2019

Section 3

                                                              3
                                                     Noosa Shire Council
                                                Charges Resolution (No.4) 2019



Part 3   Levied charge ............................................................................................................................ 10
8.       Levied infrastructure charge.................................................................................................... 10
         8.1      Purpose                                                                                                                         10
         8.2      Calculation of Council levied charge                                                                                            10
         8.3      Council adopted charge rate                                                                                                     12
         8.4      Credit                                                                                                                          13
         8.5      Additional credit for past contribution or charge                                                                               13
9.       Administration of levied charge .............................................................................................. 14
         9.1      Purpose                                                                                                                         14
         9.2      Subsidy for a levied charge                                                                                                     14
         9.3      Time of payment of a levied charge                                                                                              14
         9.4      Alternatives to paying a levied charge                                                                                          14
         9.5      Automatic increase provision of levied charge                                                                                   14
10.      Allocation of adopted infrastructure charge (breakup agreement) ..................................... 15
         10.1 Purpose                                                                                                                             15
         10.2 Allocation of adopted infrastructure charge to the Council and the distributor-
              retailer (breakup agreement)                                                                                                        15
         10.3 Allocation of levied charge to trunk infrastructure networks                                                                        17
         10.4 Schedule of Council Adopted Infrastructure Charges (under breakup agreement) 18
Part 4   Offset and refund for Council trunk infrastructure................................................................ 24
11.      Infrastructure offset .................................................................................................................. 24
         11.1 Purpose                                                                                                                             24
         11.2 Application of section                                                                                                              24
         11.3 Establishment cost for an infrastructure offset                                                                                     24
         11.4 Recalculation of establishment cost for an infrastructure offset                                                                    24
12.      Refund of an unused infrastructure offset ............................................................................. 26
         12.1 Purpose                                                                                                                             26
         12.2 Application of section                                                                                                              27
         12.3 Payment of a refund                                                                                                                 27
13.      Conversion Applications .......................................................................................................... 27
         13.1 Purpose                                                                                                                             27
         13.2 Application of section                                                                                                              27
         13.3 Conversion application process                                                                                                      28
         13.4 Notice of decision                                                                                                                  28
         13.5 Effect of conversion application decision                                                                                           28
         13.6 Criteria for deciding a conversion application                                                                                      28




                                      Council Resolution effective 23 September 2019

Section 4

                                                        4
                                               Noosa Shire Council
                                          Charges Resolution (No.4) 2019




       Part 1                      Introduction

  1.          Preliminary
1.1     Short title

        The charges resolution may be cited as Noosa Shire Council Charges Resolution (No. 4)
        2019.

1.2     Planning Legislation

        (1)       The resolution is made pursuant to section 113 of the Planning Act 2016.

        (2)       The resolution is to be read in conjunction with the following:

                  (a)      the Planning Regulation 2017;

                  (b)      the applicable local planning instrument.

        (3)      The resolution is attached to but does not form part of the applicable local
                 planning instrument.

1.3     Effect

        The amended resolution has effect from 23 September 2019.

1.4     Purpose of the resolution

        The purpose of the resolution is to assist with the implementation of the applicable local
        planning instrument by stating the following:

                  (a)      an adopted infrastructure charge for determining the levied charge for
                           funding part of the establishment cost of the following trunk infrastructure
                           networks:

                           (i)          transport network;

                           (ii)         public parks and land for community facilities network;

                           (iii)        stormwater network;

                           (iv)         water supply network;

                           (v)          sewerage network;

                  (b)      stating other matters relevant to the adopted infrastructure charge.


1.5     Interpretation

        (1)       In this resolution:

                 adopted charge rate means the charge to be applied for the purpose of
                 calculating a levied charge as stated in section 8.3 (Council adopted charge rate).


                                   Council Resolution effective 23 September 2019

Section 5

                                 5
                        Noosa Shire Council
                   Charges Resolution (No.4) 2019



applicable local planning instrument means The Noosa Plan 2006 planning
scheme.
base date means the date being:

(a)      The date for the financial year applying to the adopted charge rates
         specified in section 10.4 (Schedule of Council Adopted Infrastructure
         Charges (under breakup agreement)).

(b)      The date stated in the LGIP for estimates of the establishment costs for
         the local government’s trunk infrastructure networks;

(c)      The date stated in the Netserve Plan for estimates of the establishment
         costs for the distributor-retailer’s trunk infrastructure networks.

bedroom means an area of a building or structure which:

(a)      is used, designed or intended for use for sleeping (but excludes a lounge
         room, dining room, living room, kitchen, water closet, bathroom, laundry,
         garage or plant room); or

(b)      other habitable rooms that can be used for sleeping such as a den,
         library, study, loft, media or home entertainment room, library, family or
         rumpus room or other similar space. (Non-habitable rooms will not be
         considered in the calculation of infrastructure charges)

breakup agreement means the agreement between the local government and
the distributor-retailer determining the proportion of the maximum adopted
charges to apply to each entity.

charges resolution see Planning Act 2016 section 113 (1).

Council means Noosa Shire Council.

credit means the amount to be applied for the purpose of reducing an adopted
infrastructure charge which takes into account the existing usage of the trunk
infrastructure networks by the premises on or in relation to which development is
carried out as calculated in section 8.4 (Credit) and 8.5 (Additional credit for past
contribution or charge).

demand means the deemed usage of the trunk infrastructure networks by the
development on the premises and correlates to the charge rates for the use/s
stated in section 8.3 (Council adopted charge rate) for the purpose of calculating
the levied charge stated in section 8.2 (Calculation of Council levied charge).




            Council Resolution effective 23 September 2019

Section 6

                                 6
                        Noosa Shire Council
                   Charges Resolution (No.4) 2019



distributor-retailer means the Northern SEQ Distributor-Retailer Authority
(trading as Unitywater).

dwelling unit means habitable rooms and other spaces used or capable for use
as one self-contained residential unit, comprising at least bathroom, toilet and
food preparation facilities as well as other living and sleeping space to
accommodate one or more persons.

establishment cost see schedule 2 (Dictionary) of the Planning Act 2016.

gross floor area (GFA) means the sum of the floor areas (inclusive of all walls,
columns and balconies, whether roofed or not) of all stories of every building
and/or structure attributable to the development use located on a site, excluding
the areas (if any) used for building services, a ground floor public lobby, a public
mall in a shopping centre, and areas associated with the parking, loading and
manoeuvring of motor vehicles.

habitable room (as defined in the Local planning instrument) means any room of
a dwelling unit or accommodation unit other than a bathroom, laundry, toilet,
pantry, walk-in wardrobe, corridor, stair, lobby, photographic darkroom, clothes
drying room and other space of a specialised nature occupied neither frequently
nor for extended periods.

impervious area means the area of the premises that is impervious to rainfall.
This includes all roofed, decked, paved, concreted, bitumen or other type of
sealed areas.

lawful use see schedule 2 (Dictionary) of the Planning Act 2016.

levied charge see Planning Act 2016 section 119 (12).

Local government infrastructure plan (LGIP) means part of the specified local
government planning scheme as defined in Schedule 2 Dictionary of the Planning
Act 2016.

Local planning instrument means the: The Noosa Plan 2006 planning scheme.

Netserv plan means the distributor-retailer’s plan and its service about its water
and wastewater networks as required by the South-East Queensland Water
(Distribution and Retail Restructuring) Act 2009.




            Council Resolution effective 23 September 2019

Section 7

                                                  7
                                         Noosa Shire Council
                                    Charges Resolution (No.4) 2019



                 planned date means the date scheduled for the provision of trunk infrastructure
                 stated in the schedule of works for trunk infrastructure referenced in the LGIP.

                 Planning Regulation means the Planning Regulation 2017 made under the
                 Planning Act 2016.

                 prescribed form means a form prescribed by the Council.

                 priority infrastructure area see section 4.2 (Priority infrastructure area).

       (2)       A term defined in the Planning Act 2016 which is used in the resolution has the
                 meaning given in the Planning Act 2016.

       (3)       If a term is not defined in the resolution, Local planning instrument or the
                 Planning Act 2016 the term is to, subject to section 14A (Interpretation best
                 achieving Act’s purpose) of the Acts Interpretation Act 1954, have the meaning
                 assigned to it by the edition of the Macquarie Dictionary that is current at the
                 commencement date.


  2.         Application of the adopted infrastructure charge
2.1    Purpose

       Section 2 states the following:

                 (a)      that Chapter 4 of the Planning Act 2016 has effect in the local
                          government area;

                 (b)      that the resolution is intended to apply to development in the local
                          government area;

                 (c)      that the resolution applies to particular development;

                 (d)      the categorisation of uses under an applicable local planning instrument
                          to development classes and charge categories under Schedule 16 of the
                          Planning Regulation.

2.2    Effect of the Chapter 4 of the Planning Act 2016 in the local government area

       Chapter 4 of the Planning Act 2016 applies to all of the local government area.

2.3    Application of the resolution to the local government area

       The resolution applies to all development in the local government area.

2.4    Application to particular development

       The Council may levy an infrastructure charge on the following development:
                 (a)      a reconfiguring a lot;
                 (b)      a material change of use of premises;
                 (c)      the carrying out of building work;


                             Council Resolution effective 23 September 2019

Section 8

                                                  8
                                         Noosa Shire Council
                                    Charges Resolution (No.4) 2019



                 (d)     other development approval.

2.5    Categorisation of uses to development classes

       (1)       A use under the local planning instrument as stated in column 1 of Table 10.3
                 (Schedule of Council adopted charges) is included within the Schedule 16 of the
                 Planning Regulation charge category stated in column 2 of Table 10.3 (Schedule
                 of Council adopted charges).

       (2)       The Council and the distributor-retailer are to allocate a use not otherwise stated
                 under subsection (1) to another similar use that the local government or
                 distributor-retailer decides to apply to the use (refer to Schedule 16 of the
                 Planning Regulation 2017).


  3.         Assumptions about future development
3.1    Purpose

       Section 3 states the assumptions about the type, scale, location and timing of future
       development.


3.2    Development assumptions about future development

                 (a)     the type, scale, location and timing of future development is identified in
                         the LGIP and/or local planning instrument

                 (b)     development inconsistent with the type, scale, location or timing
                         identified in the LGIP and/or local planning instrument will be subject to
                         assessment for conditions for extra trunk infrastructure costs in
                         accordance with Chapter 4 of the Planning Act 2016.


  4.         Priority infrastructure area
4.1    Purpose

       Section 4 states the priority infrastructure area for the Council.

4.2    Priority infrastructure area

       The priority infrastructure area is identified in the LGIP.




                             Council Resolution effective 23 September 2019

Section 9

                                                 9
                                        Noosa Shire Council
                                   Charges Resolution (No.4) 2019



Part 2                      Trunk infrastructure networks

  5.      Trunk infrastructure plans
5.1    Purpose

       Section 5 states the trunk infrastructure networks to be funded in part by the levied
       infrastructure charge.

5.2    Schedule of works for trunk infrastructure

       The trunk infrastructure networks comprise the land and works for trunk infrastructure
       detailed in the LGIP and Netserv Plan.

5.3    Trunk infrastructure network systems and items

       The trunk infrastructure networks identified in the schedule of works for trunk
       infrastructure include the systems and items detailed in the LGIP and Netserv Plan.

5.4    Trunk infrastructure plans

       The trunk infrastructure networks identified in the schedule of works for trunk
       infrastructure are conceptually identified in the trunk infrastructure plans detailed in the
       LGIP and Netserv Plan.


  6.      Desired standard of service
6.1    Purpose

       Section 6 states the desired standard of service which is the standard guiding the delivery
       of a trunk infrastructure network.

6.2    Desired standards of service for trunk infrastructure

       The desired standard of service for each infrastructure network is detailed in the LGIP and
       Netserv Plan.


  7.      Establishment cost for trunk infrastructure networks
7.1    Purpose

       Section 7 states the establishment cost for an identified trunk infrastructure network.

7.2    Establishment cost for a trunk infrastructure network

       The establishment cost for the trunk infrastructure networks are detailed in the LGIP and
       Netserv Plan.




                            Council Resolution effective 23 September 2019

Section 10

                                                  10
                                          Noosa Shire Council
                                     Charges Resolution (No.4) 2019



Part 3                       Levied charge

  8.         Levied infrastructure charge
8.1    Purpose

       Section 8 states the calculation of the infrastructure charge to be levied by the following:

                 (a)      the Council under Chapter 4 of the Planning Act 2016 for the transport,
                          public parks & land for community facilities and stormwater networks in
                          accordance with the breakup agreement;

                 (b)      the distributor-retailer under the South-East Queensland Water
                          (Distribution and Retail Restructuring) Act 2009 for the sewerage and
                          water supply networks in accordance with the breakup agreement and
                          Unitywater’s Infrastructure Charges Schedule.

       An infrastructure charge applies where the development results in an increase in the
       type/s and/or quantity in use/s on the site and therefore places additional demand on trunk
       infrastructure. The determination of extra demand on trunk infrastructure correlates
       directly to the infrastructure charge calculation undertaken in accordance with section 8.2
       (Calculation of Council levied charge) and section 8.3 (Council adopted charge rates) in
       compliance with the planning legislation. Refer also to Queensland State Government
       Fact Sheet: “Local government infrastructure framework, Calculating additional demand
       and existing use credits”.


8.2    Calculation of Council levied charge

       Infrastructure charges are calculated and levied separately by the Council and distributer-
       retailer in accordance with the charges breakup agreement and relevant legislation.

       The legislation states: “A levied charge may be only for extra demand placed on trunk
       infrastructure that the development will generate.” In this regard, alternative calculation
       methodologies may be undertaken according to whether the development approved:

                 (a)      alters the current development and/or use/s lawfully existing on the
                          premises whereby the calculation needs to consider the new “total”
                          development approved and deduct the previous lawful development;

                          or alternatively:

                 (b)      simply only adds to the current development use/s lawfully existing on
                          the premises whereby the calculation may be simplified to just comprise
                          the approved additional development quantity and use/s.

       (1)       An infrastructure charge that may be levied for reconfiguring a lot is generally
                 calculated as follows:

                 LCROL = (ACROL x QROL) - C

                 Where:

                 LCROL    is the infrastructure charge levied for reconfiguring a lot.



                             Council Resolution effective 23 September 2019

Section 11

                                       11
                               Noosa Shire Council
                          Charges Resolution (No.4) 2019



      ACROL    is the adopted charge rate for reconfiguring a lot stated in section 8.3
               (Council adopted charge rate).

      QROL     is the total no of lots.

      C        is the credit stated in section 8.4 (Credit).

      Note:

               (a) for residential lot reconfiguration, the adopted infrastructure charge
                   is apportioned across all networks;

               (b) for non-residential lot reconfiguration, the adopted infrastructure
                   charge apportionment excludes the stormwater charge component.
                   The stormwater charge will be calculated and issued on a
                   subsequent material change of use or building work approval when
                   the impervious area is able to be determined.

(2)   An infrastructure charge that may be levied for a material change of use or
      building work for residential development is generally calculated as follows:

      LCR = (Sum(ACR x QR) for each defined use) − C

      Where:

      LCR      is the infrastructure charge that may be levied for a material change of
               use or building work for residential development.

      ACR      is the adopted charge rate for each defined use for a material change of
               use or building work for residential development stated in section 8.3
               (Council adopted charge rate).

      QR       is the residential quantity for each defined use.

      C        is the credit stated in section 8.4 (Credit).

(3)   An infrastructure charge that may be levied for a material change of use or
      building work for non-residential development is generally calculated as follows:

      LC = LCNR + LCSW

      Where:

      LC       is the infrastructure charge that may be levied for the total development

      LCNR = (Sum of (AC4 x Q4) for each defined use) − C4

      LCSW = (ACSW x QSW) − CSW

      LCNR     is the infrastructure charge that may be levied for a material change of
               use or building work for non-residential development for the transport,
               public parks and land for community facilities networks.

      LCSW     is the levied charge for a material change of use or building work for
               non-residential development for the stormwater network.




                   Council Resolution effective 23 September 2019

Section 12

                                                   12
                                           Noosa Shire Council
                                      Charges Resolution (No.4) 2019



              AC4      is the adopted charge rate for each defined use for a material change of
                       use or building work for non-residential development stated in section
                       8.3 (Council adopted charge rate) for the transport, public parks and
                       land for community facilities networks.

              ACSW     is the adopted charge rate for a material change of use or building work
                       for non-residential development stated in section 8.3 (Council adopted
                       charge rate) for the stormwater network.

              Q4       is the non-residential quantity for each defined use.

              QSW      is the impervious area of the development.

              C4      is the credit stated in section 8.4 (Credit) for the transport, public parks
                      and land for community facilities networks.

              CSW     is the credit stated in section 8.4 (Credit) for the stormwater network.

      (4)     An infrastructure charge is only levied if the calculation in sub-sections (1), (2)
              and (3) results in an amount greater than $zero (i.e. no refund applies should the
              calculated charge result in a negative amount).

8.3   Council adopted charge rate

      The adopted charge rate for:

              (a)      reconfiguring a lot, is the amount stated equivalent to a Residential (3 or
                       more bedroom dwelling unit) in Table 10.3 (Schedule of Council adopted
                       charges);

              (b)      a material change of use or building work for:

                       (i)           residential development, is stated in Table 10.3 (Schedule of
                                     Council adopted charges);

                      (ii)          non-residential development other than other uses, is stated in
                                    Table 10.3 (Schedule of Council adopted charges), which
                                    comprises the following:

                                    (A)       the adopted charge rate for the transport, public parks
                                              and land for community facilities networks; and

                                    (B)       the adopted charge rate for the stormwater network;

                       (iii)        non-residential development being other uses or development
                                    not otherwise identified in paragraphs (i) or (ii):

                                    (A)       the adopted charge rate for the transport, public parks
                                              and land for community facilities networks being the
                                              prescribed amount for another similar use that the local
                                              government decides to apply to the use (refer to
                                              Schedule 16 of the Planning Regulation 2017); and

                                    (B)       the adopted charge rate for the stormwater network




                               Council Resolution effective 23 September 2019

Section 13

                                                    13
                                            Noosa Shire Council
                                       Charges Resolution (No.4) 2019



8.4   Credit

               The credit for the premises is an amount which is the greater of the following:

               (a)     the development use & quantity of development of an adopted
                       infrastructure charge previously paid for the development of the
                       premises;

               (b)     where the premises is subject to an existing lawful use or previous lawful
                       use no longer taking place for:

                        (i)           residential development, the amount stated for an adopted
                                      charge in Table 10.3 (Schedule of Council adopted charges) for
                                      the lawful use;

                        (ii)          non-residential development other than other uses, the amount
                                      stated for an adopted charge in Table 10.3 (Schedule of
                                      Council adopted charges) for the lawful use;

                        (iii)         non-residential development being other uses or development
                                      not otherwise identified in paragraphs (i) or (ii), the prescribed
                                      amount for another similar use that the local government
                                      decides to apply to the use (refer to Schedule 16 of the
                                      Planning Regulation 2017).

                       The onus remains with the applicant to provide full details and evidence
                       as to the extent and lawfulness of any claim for a credit for a previous
                       use no longer taking place.

               (c)     where the premises is not subject to an existing or previous lawful use:

                       (i)           for residential development, the amount applicable for a
                                     residential lot stated for Residential (3 or more bedroom
                                     dwelling unit) in Table 10.3 (Schedule of Council adopted
                                     charges) applicable to a single residential lot provided the lot is
                                     capable of having a dwelling house built on the lot in compliance
                                     the planning scheme requirements;

                       (ii)          for non-residential development, no credit applies.

8.5   Additional credit for past contribution or charge

      For a past contribution and or charge relating to “current” trunk infrastructure that has
      been paid for a particular trunk network under a previous charging regime that exceeds
      the credit applied under section 8.4 (Credit), an “additional credit” against the adopted
      charge for the particular network will be recognised. The amount of the credit will be
      determined by converting the previous payment to an equivalent adopted charge as
      determined by Council and only relates to the amount over and above the standard credit
      applied under section 8.4 (credit).

      The amount of the credit will not be more than the adopted charge amount apportioned for
      that network. The onus remains with the applicant to provide full details and evidence of
      any payments of contributions and or charges under a previous charging regime.




                                Council Resolution effective 23 September 2019

Section 14

                                                 14
                                         Noosa Shire Council
                                    Charges Resolution (No.4) 2019



  9.         Administration of levied charge
9.1    Purpose

       Section 9 states how an infrastructure charge levied by the Council is to be administered.

9.2    Subsidy for a levied charge

       The Council’s policy statement in respect of a subsidy for a levied infrastructure charge is
       stated in Council Policy Document - Infrastructure Charges Rebates for Community
       Organisations in effect at the time of levying the infrastructure charge.

9.3    Time of payment of a levied charge

       A levied infrastructure charge is payable in accordance with the Planning Act 2016 at the
       following time:

                 (a)     if the charge applies to reconfiguring a lot ― when the Council approves
                         the plan for the reconfiguration that, under the Land Title Act, is required
                         to be given to Council for approval; or

                 (b)     if the charge applies to building work ― the sooner of: when the
                         certificate of classification or final inspection certificate for the building
                         work is given under the Building Act or prior to occupancy; or

                 (c)     if the charge applies to a material change of use ― when the change
                         happens; or

                 (d)     if the charge applies for other development, on the day stated in the
                         infrastructure charges notice under which the charge is levied.

9.4    Alternatives to paying a levied charge

       The Council may give consideration to entering into an infrastructure agreement involving
       an alternative to the way a payment is to be made or an infrastructure contribution
       provided in a form other than paying an infrastructure charge.

9.5    Automatic increase provision of levied charge

       The levied infrastructure charge is subject to an automatic increase provision (indexation)
       as permitted under the legislation. The automatic increase provision is applied as follows:

       (1)       The infrastructure charge is first calculated using the adopted charge rates at the
                 base date and indexed to the Financial Year current at the time of issue of the
                 infrastructure charge notice;

       (2)       The issued infrastructure charge is subject to further indexation from the date of
                 issue until the date of payment.

       (3)       Indexation is applied annually per Financial Year using variations applicable to
                 the “maximum amount” possible to be issued under the Planning Regulation
                 2017 as amended in accordance with the legislation from the stipulated base
                 date to the time of issue and payment.




                             Council Resolution effective 23 September 2019

Section 15

                                                 15
                                         Noosa Shire Council
                                    Charges Resolution (No.4) 2019



  10.         Allocation of         adopted          infrastructure           charge   (breakup
              agreement)
10.1    Purpose

        Section 10 states how the adopted infrastructure charge of the Council and the distributor-
        retailer is to be allocated in accordance with the breakup agreement.

10.2    Allocation of adopted infrastructure charge to the Council and the distributor-
        retailer (breakup agreement)

        (1)      The proportion of an adopted infrastructure charge to be allocated to the Council
                 and the distributor-retailer is stated in Table 10.1 (Allocation of adopted
                 infrastructure charge (breakup agreement) to the Council and the distributor-
                 retailer). For non-residential development, this proportion of the adopted charge
                 excludes the stormwater network which is calculated separately and allocated
                 100% to Council.

        (2)      The levied charge is calculated and issued separately by the Council and
                 distributor-retailer as applying to their respective infrastructure networks in
                 accordance with the breakup agreement.

        (3)      Where development is not connected to the water and sewerage networks, the
                 levied charge issued by distributor-retailer is reduced as determined by the
                 distributor-retailer.




                             Council Resolution effective 23 September 2019

Section 16

                                                                    16
                                                            Noosa Shire Council
                                                       Charges Resolution (No.4) 2019



Table 10.1 Apportionment of adopted infrastructure charge (breakup agreement) to the Council and the Distributor-
Retailer (Unitywater)

 Column 1         Column 2                                              Column 3                                                              Column 4

 Applicable       Planning         *Apportionment of adopted infrastructure charge for Non-Residential Development           Apportionment of adopted infrastructure
 local planning   areas                                                                                                      charge for:
 instrument
                                                                                                                                 a)   Residential development; and
                                 Retail, Commercial and Entertainment Uses
                                    (Retail, Office, Bulk Goods, Showroom,                   Industry Uses                       b)   *Non-Residential development not
                                                  Entertainment)                                                                      otherwise specified in Column 3

                                                        Distributor-Retailer                          Distributor-Retailer                           Distributor-Retailer
                                 Noosa Shire Council                           Noosa Shire Council                           Noosa Shire Council
                                                           (Unitywater)                                  (Unitywater)                                   (Unitywater)
                                        (%)                                           (%)                                           (%)
                                                                (%)                                           (%)                                            (%)

                  All Areas in
 The Noosa Plan                          85                     15                      64                    36                      60                     40
                  Noosa Shire


Note:

* For Non-Residential development, the adopted infrastructure charge apportionment excludes stormwater which is calculated and allocated separately 100%
  to Council.




                                                Council Resolution effective 23 September 2019

Section 17

                                                       17
                                               Noosa Shire Council
                                          Charges Resolution (No.4) 2019



10.3      Allocation of levied charge to trunk infrastructure networks

          Infrastructure charges are provided for provision of trunk infrastructure in accordance with
          the breakup agreement for:

                  (a)        distributor-retailer trunk infrastructure, in accordance with Unitywater’s
                             Netserv Plan and Infrastructure Charges Schedule as determined by
                             Unitywater.

                  (b)        Council trunk infrastructure, in accordance with Council’s LGIP and
                             generally with Table 10.2 (Allocation of Council levied charge to trunk
                             infrastructure networks). The final allocation and spending of
                             infrastructure charges collected for trunk infrastructure will be
                             determined and administered by Council’s Finance Department.

Table 10.2 Allocation of Council levied charge to trunk infrastructure networks

                            Column 1                               Column 2
                   Infrastructure charge              Allocation of Council infrastructure
                                                    charge to trunk infrastructure networks




                                                   Transport    Public parks      #Stormwater

                                                      (%)       and land for          (%)
                                                                community
                                                                  facilities
                                                                     (%)
                   Infrastructure charge for
                   Residential development:
                   (a) reconfiguring a lot; or
                                                      40             50               10
                   (b) a material change of use;
                       or
                   (c) building work
                   Infrastructure charge for
                   Non-Residential
                                                      85             15              *N/A
                   development :
                   (a) reconfiguring a lot
                   Infrastructure charge for
                   Non-Residential
                                                                                  Calculated
                   development for:
                                                      85             15           Separately
                   (b) a material change of use;
                                                                                    100%
                       or
                   (c) building work


Note:
* The Non-Residential Stormwater charge is normally unable to be calculated on a reconfiguration of a lot
  approval. This charge will therefore be calculated and applied on subsequent development permits for
  material change of use or building work when the impervious area is able to be determined.
#   The Stormwater component of the charge will only apply to development located inside the PIA.




                                 Council Resolution effective 23 September 2019

Section 18

                                                                                                     18
                                                                                             Noosa Shire Council
                                                                                        Charges Resolution (No.4) 2019



10.4              Schedule of Council Adopted Infrastructure Charges (under breakup agreement)

                  Table 10.3 (Schedule of Council adopted charges) states the development class for a use under The Noosa Plan, planning scheme and
                  the adopted charge at the base date of 1 July 2019 for the 2019-2020 Financial Year applying to Council networks in accordance with the
                  “charges breakup” agreement. for:

Table 10.3 Schedule of Council adopted charges
              Column 1                             Column 2       Column 3                  Column 4                 Column 5                 Column 6                    Column 7
       Use under The Noosa Plan                   Development      Unit of             Planning Regulation           COUNCIL                  COUNCIL               Planning Regulation
                                                     class        measure             Prescribed Amount for      APPORTIONMENT                CHARGE               Prescribed Amount for
                                                                                         Adopted Charge            Per Table 10.1           Per Table 10.1             Adopted Charge
  Use                    Defined use                                                                            (Charges breakup) of     (Charges breakup) of            Stormwater
 class                                                                                    (Financial Year       Prescribed Amount in    Prescribed Amount in          (Non-Residential)
                                                                                             2019-2020)              Column 4                 Column 4                   Adopted by
                                                                                      ($ per unit of measure)            (%)           ($ per unit of measure)            COUNCIL
                                                                                                                                                                 ($ per m2 impervious area)
                                                                       Lot
                                                                 (equivalent to a 3
                  Residential - Reconfiguration of a Lot         or more bedroom
                                                                                            $29,339.55                 60%                   $17,603.73                         N/A
                                                                     dwelling)
                                                                       Lot                                                                                                      Nil
                                                                 (equivalent to a 3                                                                                (to be calculated and applied on
                Non-residential - Reconfiguration of a Lot       or more bedroom
                                                                                            $29,339.55                 60%                   $17,603.73          subsequent development permits that
                                                                     dwelling)                                                                                       determines impervious areas)

                                                                   3 or more
                                                                   bedroom                  $29,339.55                 60%                   $17,603.73                         N/A
                                                                    dwelling
                  • Detached house
                  • Community residence                           2 bedroom
                  • Ancillary dwelling unit                                                 $20,956.80                 60%                   $12,574.08                         N/A
                                                                   dwelling
                  &
                  Multiple housing                 Residential
                                                                                                                                           $12,574.08
  Residential




                                                                  1 bedroom
                  • Type 2 Duplex                                                           $20,956.80                 60%             Reduced by Council to                    N/A
                                                                   dwelling
                  • Type 4 Conventional                                                                                                     $8,560.00
                  • Type 5 Relocatable                            Secondary
                                                                                                                                           $12,574.08
                                                                 dwelling to a
                                                                                            $20,956.80                 60%             Reduced by Council to                    N/A
                                                                  detached
                                                                                                                                            $6,249.00
                                                                    house
                  Multiple housing
                  • Type 3 Retirement and                                                                                                    $88.02
                                                    Essential
                                                                    m2 GFA                   $146.70                   60%             Reduced by Council to                  $10.25
                    special needs (aged             services
                                                                                                                                             $65.44
                    care facility)




                                                                                Council Resolution effective 23 September 2019

Section 19

                                                                                          19
                                                                                  Noosa Shire Council
                                                                             Charges Resolution (No.4) 2019



             Column 1                     Column 2         Column 3              Column 4                 Column 5                 Column 6                    Column 7
      Use under The Noosa Plan           Development        Unit of         Planning Regulation           COUNCIL                  COUNCIL               Planning Regulation
                                            class          measure         Prescribed Amount for      APPORTIONMENT                CHARGE               Prescribed Amount for
                                                                              Adopted Charge            Per Table 10.1           Per Table 10.1             Adopted Charge
 Use                 Defined use                                                                     (Charges breakup) of     (Charges breakup) of            Stormwater
class                                                                          (Financial Year       Prescribed Amount in    Prescribed Amount in          (Non-Residential)
                                                                                  2019-2020)              Column 4                 Column 4                   Adopted by
                                                                           ($ per unit of measure)            (%)           ($ per unit of measure)            COUNCIL
                                                                                                                                                      ($ per m2 impervious area)
                                                           3 or more                                                            $17,603.73
                                                           bedroom               $29,339.55                 60%             Reduced by Council to                N/A
                                                            dwelling                                                            $13,458.00
               Multiple housing
               • Type 3 Retirement and                                                                      60%                 $12,574.08
                                           Long term       2 bedroom
                                                                                 $20,956.80                                 Reduced by Council to                N/A
                 special needs           accommodation      dwelling
                                                                                                                                 $9,613.00
                 (retirement village)
                                                                                                            60%                 $12,574.08
                                                           1 bedroom
                                                                                 $20,956.80                                 Reduced by Council to                N/A
                                                            dwelling
                                                                                                                                 $6,249.00
                                                         per suite (with                                    60%
                                                             1 or 2              $10,478.40                                       $6,287.04
                                                          bedrooms)
                                                         per suite (with                                    60%
                                                             3 or more           $14,669.75                                       $8,801.85
 Residential




                                                            bedrooms)                                                                                            N/A
                                                          per bedroom
                                                         (for a bedroom                                     60%
               Visitor accommodation                           that is           $10,478.40                                       $6,287.04
                                                            not within a
               • Type 1 Home hosted
                                                               suite)
               • Type 2 Caravan park       Short term
                                         accommodation       per 1 or 2                                     60%
               • Type 3 Rural                              tent/caravan          $10,478.40                                       $6,287.04
               • Type 4 Conventional                            sites
                                                              per 3                                         60%
                                                          tent/caravan           $14,669.75                                       $8,801.85
                                                              sites
                                                                                                                                                                 N/A
                                                           per 1 or 2                                       60%
                                                                                 $10,478.40                                       $6,287.04
                                                         bedroom cabin

                                                          per 3 or more                                     60%
                                                                                 $14,669.75                                       $8,801.85
                                                         bedroom cabin




                                                                     Council Resolution effective 23 September 2019

Section 20

                                                                                                20
                                                                                        Noosa Shire Council
                                                                                   Charges Resolution (No.4) 2019



             Column 1                        Column 2             Column 3             Column 4                 Column 5                 Column 6                    Column 7
      Use under The Noosa Plan              Development            Unit of        Planning Regulation           COUNCIL                  COUNCIL               Planning Regulation
                                               class              measure        Prescribed Amount for      APPORTIONMENT                CHARGE               Prescribed Amount for
                                                                                    Adopted Charge            Per Table 10.1           Per Table 10.1             Adopted Charge
 Use                  Defined use                                                                          (Charges breakup) of     (Charges breakup) of            Stormwater
class                                                                                (Financial Year       Prescribed Amount in    Prescribed Amount in          (Non-Residential)
                                                                                        2019-2020)              Column 4                 Column 4                   Adopted by
                                                                                 ($ per unit of measure)            (%)           ($ per unit of measure)            COUNCIL
                                                                                                                                                            ($ per m2 impervious area)
                Cultivation
                                           Low impact rural          N/A                   Nil                     Nil                      Nil                        Nil
                • Type 1 Traditional

                Cultivation                  High impact
                                                                   m2 GFA                $20.90                   60%                     $12.54                       Nil
                • Type 2 Intensive              rural
 Agricultural




                Animal husbandry
                                           Low impact rural          N/A                   Nil                     Nil                      Nil                        Nil
                • Type 1 Traditional

                Animal husbandry             High impact
                                                                   m2 GFA                $20.90                   60%                     $12.54                       Nil
                • Type 2 Intensive              rural

                Forestry
                • Type 1 Native            Low impact rural          N/A                   Nil                     Nil                      Nil                        Nil
                • Type 2 Plantation
                Commercial business          Commercial
                                                                   m2 GFA               $146.70                   85%                    $124.69                     $10.50
                • Type 1 Office                (office)

                Commercial business
                • Type 2 Medical               Essential
                                                                   m2 GFA               $146.70                   60%                     $88.02                     $10.50
                                               services
                • Type 3 Veterinary
                Entertainment and dining
                business                     Commercial
                • Type 1 Food &                                    m2 GFA               $188.60                   85%                    $160.31                     $10.50
 Business




                                               (retail)
                  beverages
                Entertainment and dining                           m2 GFA                                                               $125.73
                business                                          (excluding            $209.55                   60%             Reduced by Council to
                                            Indoor sport &       court areas)                                                           $78.74
                • Type 2 Recreation,                                                                                                                                 $10.50
                                           recreation facility                                                                          $12.54
                  amusement and                                    m2 GFA
                                                                                         $20.90                   60%             Reduced by Council to
                  fitness                                        (court areas)
                                                                                                                                        $11.25
                Entertainment and dining
                business                    Entertainment          m2 GFA               $209.55                   85%                    $178.11                     $10.50
                • Type 3 Bar



                                                                            Council Resolution effective 23 September 2019

Section 21

                                                                                       21
                                                                               Noosa Shire Council
                                                                          Charges Resolution (No.4) 2019



           Column 1                        Column 2       Column 3            Column 4                   Column 5                     Column 6                      Column 7
    Use under The Noosa Plan              Development      Unit of       Planning Regulation             COUNCIL                      COUNCIL                 Planning Regulation
                                             class        measure       Prescribed Amount for        APPORTIONMENT                    CHARGE                 Prescribed Amount for
                                                                           Adopted Charge              Per Table 10.1               Per Table 10.1               Adopted Charge
 Use              Defined use                                                                       (Charges breakup) of         (Charges breakup) of              Stormwater
class                                                                      (Financial Year          Prescribed Amount in        Prescribed Amount in            (Non-Residential)
                                                                              2019-2020)                 Column 4                     Column 4                     Adopted by
                                                                       ($ per unit of measure)               (%)               ($ per unit of measure)              COUNCIL
                                                                                                                                                           ($ per m2 impervious area)
            Home-based business
             • Type 1 Limited
               visibility
                                           Minor uses       N/A                   Nil                         Nil                         Nil                         Nil
             • Type 2 Evident
             • Type 3 Significant
               scale
            Industrial business
             • Type 1 Warehouse
             • Type 2 Production,            Industry     m2 GFA                $52.40                       64%                        $33.53                      $10.50
               alteration, repackaging
               and repairing
                                                                       Planning Regulation 2017 – Schedule 16: “The prescribed amount for another
                                                                       similar use listed in column 1 (other than in this row) that the local government
            Industrial business
                                           Other uses     m2 GFA       decides to apply to the use”.                                                                $10.50
             • Type 3 Extractive
                                                                       Council has decided the “Industrial Business Type 1 & Type 2” use to be most
                                                                       similar use & appropriate rate.
 Business




            Retail business
            • Type 1 Local                 Commercial
                                                          m2 GFA               $188.60                       85%                       $160.31                      $10.50
                                             (retail)
            • Type 2 Shop & salon
            Retail business
            • Type 3 Landscape and
              rural
            • Type 4 Showroom              Commercial
                                                          m2 GFA               $146.70                       85%                       $124.69                      $10.50
                                           (bulk goods)
            • Type 6 Hardware
              Store
            • Type 7 Garden

                                         a) Standard
                                          Commercial      m2 GFA               $146.70                       85%                       $124.69                      $10.50
                                          (bulk goods)
            Retail business
            • Type 5 Vehicle uses        b) Service
                                         Station          m2 GFA               $188.60                       85%                       $160.31                      $10.50
                                           Commercial
                                             (retail)


                                                                   Council Resolution effective 23 September 2019

Section 22

                                                                                         22
                                                                                 Noosa Shire Council
                                                                            Charges Resolution (No.4) 2019



            Column 1                      Column 2         Column 3             Column 4                    Column 5                     Column 6                      Column 7
     Use under The Noosa Plan            Development        Unit of        Planning Regulation              COUNCIL                      COUNCIL                 Planning Regulation
                                            class          measure        Prescribed Amount for         APPORTIONMENT                    CHARGE                 Prescribed Amount for
                                                                             Adopted Charge               Per Table 10.1               Per Table 10.1               Adopted Charge
 Use               Defined use                                                                         (Charges breakup) of         (Charges breakup) of              Stormwater
class                                                                         (Financial Year          Prescribed Amount in        Prescribed Amount in            (Non-Residential)
                                                                                 2019-2020)                 Column 4                     Column 4                     Adopted by
                                                                          ($ per unit of measure)               (%)               ($ per unit of measure)              COUNCIL
                                                                                                                                                              ($ per m2 impervious area)
             Education
             • Type 1 Childcare
             • Type 2 School               Education        m2 GFA                $146.70                       60%                        $88.02                      $10.50
             • Type 3 Adult
             • Type 4 Information
             Emergency service
             • Type 1 Station              Essential
                                                            m2 GFA                $146.70                       60%                        $88.02                      $10.50
                                           services
             • Type 2 Shed
                                                                          Planning Regulation 2017 – Schedule 16: “The prescribed amount for another
             Open space                                                   similar use listed in column 1 (other than in this row) that the local government
             • Type 1 Sport and            Other uses       m2 GFA        decides to apply to the use”.                                                                $10.50
               recreation                                                 Council has decided “Entertainment and dining business Type 2 Recreation,
                                                                          amusement and fitness” use to be most similar use & appropriate rate.
                                                            per 1 or 2
                                                          tent/caravan          $10,478.40                      60%                      $6,287.04
                                                              sites
 Community




                                                              per 3
                                                          tent/caravan          $14,669.75                      60%                      $8,801.85
             Open space                    Short term         sites
                                                                                                                                                                         N/A
             • Type 2 Camp ground        accommodation
                                                           per 1 or 2
                                                                                $10,478.40                      60%                      $6,287.04
                                                         bedroom cabin

                                                          per 3 or more
                                                                                $14,669.75                      60%                      $8,801.85
                                                         bedroom cabin

             Wellbeing
             • Type 1 Health               Essential
                                                            m2 GFA                $146.70                       60%                        $88.02                      $10.50
                                           services
               (hospital, hospice etc)
             Wellbeing
             • Type 2 Social (arts
               and crafts, community
                                           Assembly         m2 GFA                 $73.35                       60%                        $44.01                      $10.50
               meeting hall CWA etc)
             • Type 3 Worship
             • Type 4 Funeral


                                                                     Council Resolution effective 23 September 2019

Section 23

                                                                                         23
                                                                                 Noosa Shire Council
                                                                            Charges Resolution (No.4) 2019



                Column 1                       Column 2     Column 3            Column 4                   Column 5                     Column 6                      Column 7
         Use under The Noosa Plan             Development    Unit of       Planning Regulation             COUNCIL                      COUNCIL                 Planning Regulation
                                                 class      measure       Prescribed Amount for        APPORTIONMENT                    CHARGE                 Prescribed Amount for
                                                                             Adopted Charge              Per Table 10.1               Per Table 10.1               Adopted Charge
  Use                      Defined use                                                                (Charges breakup) of         (Charges breakup) of              Stormwater
 class                                                                       (Financial Year          Prescribed Amount in        Prescribed Amount in            (Non-Residential)
                                                                                2019-2020)                 Column 4                     Column 6                     Adopted by
                                                                         ($ per unit of measure)               (%)               ($ per unit of measure)              COUNCIL
                                                                                                                                                             ($ per m2 impervious area)
                    Service & utility
                                                Industry    m2 GFA                $52.40                       64%                        $33.53                      $10.50
                    • Type 1 Depot

                    Service & utility                                    Planning Regulation 2017 – Schedule 16: “The prescribed amount for another
                    • Type 2 Installation                                similar use listed in column 1 (other than in this row) that the local government
                                               Other uses   m2 GFA       decides to apply to the use”.                                                                $10.50
                    • Type 4 Treatment,
                                                                         Council has decided the “Industrial Business Type 1 & Type 2” use to be most
                      recycling & disposal;                              similar use & appropriate rate.
   Infrastructure




                    Service & utility                                               Nil
                                               Minor uses     N/A                                               Nil                         Nil                         Nil
                    • Type 3 Tower

                    Transport                                            Planning Regulation 2017 – Schedule 16: “The prescribed amount for another
                    • Type 1 Passenger                                   similar use listed in column 1 (other than in this row) that the local government
                      terminal                 Other uses   m2 GFA       decides to apply to the use”.                                                                $10.50
                    • Type 2 Carpark                                     Council has decided the “Industrial Business Type 1 & Type 2” use to be most
                    • Type 4 Aeronautical                                similar use & appropriate rate.

                    Transport
                                                Industry    m2 GFA                $52.40                       64%                        $33.53                      $10.50
                    • Type 3 Depot

Note:
(1) Development that is for provision of “trunk” infrastructure is exempt from and not subject to payment of infrastructure charges.
(2) Table 10.3 charges are specified at the base date and are subject to indexation in accordance with clause 9.5 Automatic increase provision of levied charge.
(3) The Stormwater component of the charge will only apply to development located inside the PIA.




                                                                     Council Resolution effective 23 September 2019

Section 24

                                                      24
                                              Noosa Shire Council
                                         Charges Resolution (No.4) 2019



Part 4                  Offset and refund for Council trunk
                        infrastructure

  11.         Infrastructure offset
11.1    Purpose

        Section 11 states the Council’s policy for calculating the establishment cost for an
        infrastructure offset for provision of trunk infrastructure.

11.2    Application of section

        Section 11 applies where for a development, the Council has for a trunk infrastructure
        network:
                  (a)     requires trunk infrastructure to be provided under a necessary
                          infrastructure condition of a development approval, that services or is
                          planned to service premises other than the subject premises; and;
                  (b)     a levied infrastructure charge applies to the development.

11.3    Establishment cost for an infrastructure offset

                  The establishment cost for determining offsets for provision of trunk infrastructure
                  required in a necessary infrastructure condition shall be the establishment cost
                  identified in the LGIP or Netserv Plan and indexed to the reference date of the
                  issued infrastructure charges notice.

11.4    Recalculation of establishment cost for an infrastructure offset

        (1)       Where a notice is given by an applicant under s. 657 of SPA requesting a
                  recalculation of the establishment cost for the trunk infrastructure that is works,
                  the recalculated amount shall be the pre-market estimate of the work as follows:
                  The pre-market estimate of work for the trunk infrastructure contribution is the
                  estimate expressed in dollars of the design and construction of the work:
                  (a)      including the following:
                          (i)          the cost of planning and designing the work;
                          (ii)         the cost of survey and site investigation for the work;
                          (iii)        a cost under a construction contract for the work;
                          (iv)         a portable long service leave payment for a construction
                                       contract;
                          (v)          an insurance premium for the work;
                          (vi)         a Council inspection fee for the commencement and end of the
                                       maintenance period for the work;
                          (vii)        the cost of an approval for the work;




                                  Council Resolution effective 23 September 2019

Section 25

                                    25
                            Noosa Shire Council
                       Charges Resolution (No.4) 2019



(b)   excluding the following:
      (i)          a cost of carrying out temporary infrastructure;
      (ii)         a cost of carrying out other infrastructure which is not part of the
                   trunk infrastructure contribution;
      (iii)        a cost of the decommissioning, removal and rehabilitation of
                   infrastructure identified in paragraphs (i) and (ii);
      (iv)         a part of the trunk infrastructure contribution provided by the
                   Council or a person other than the person seeking the
                   infrastructure offset;
      (v)          a cost to the extent that GST is payable and an input tax credit
                   can be claimed for the work.
(c)   The applicant:
      (i)           must undertake a tender process in accordance with the
                    Council’s Procurement Policy for any work contribution which is
                    eligible for an Infrastructure Offset under this document;
      (ii)          must give the Council a Notice which states the claimant’s
                    calculation of the pre-market estimate, which will include, as
                    applicable;
                  A.         a copy of the tender advertisement;
                  B.         a copy of each tender received;
                  C.         the claimant’s preferred tenderer;
                  D.         the claimant’s reason for the preferred tenderer;
                  E.         a copy of the proposed Work Contract issued by the
                             claimant’s preferred tenderer;
                  F.         detailed plans and specifications showing the extent of
                             the Work Contribution eligible for an Infrastructure
                             Offset;
                  G.         the claimant’s calculation of the cost providing a Works
                             Contribution to which an Infrastructure Offset applies;
                  H.        the total of the claimant’s calculation of the Pre-Market
                            Estimate.
      (iii)         If the Council agrees with the applicant’s Pre-Market Estimate, it
                    becomes the establishment cost of the infrastructure.

(d)   If the Council does not agree with the applicant’s Pre-Market Estimate,
      the Council will provide its own alternative Pre-Market Estimate to the
      applicant. If the applicant agrees with the Council’s alternative Pre-
      Market Estimate, it becomes the establishment cost of the infrastructure.

(e)   If agreement cannot be reached on the Pre-Market Estimate, an
      independent assessor is to be appointed by agreement between the



              Council Resolution effective 23 September 2019

Section 26

                                                   26
                                           Noosa Shire Council
                                      Charges Resolution (No.4) 2019



                           Council and the applicant to determine the estimate. The cost of this
                           independent assessment is to be equally shared between the local
                           authority and the applicant and the amended cost estimate determined
                           by the independent assessor becomes the establishment cost of the
                           infrastructure.

                           However, if the Council and the applicant cannot reach agreement on
                           the appointment of an independent assessor, the establishment cost of
                           the infrastructure is determined by calculating the average of the
                           previous two cost estimates prepared on behalf of the applicant and the
                           Council respectively.

        (2)        Where a notice is given by an applicant under s. 657 of SPA requesting a
                  recalculation of the establishment cost for the trunk infrastructure that is land, the
                  recalculated amount shall be the value estimated for the land based on the pre-
                  approved and pre-developed state of the land as follows:

                   a)      The applicant, at their own cost, must provide to the Council a valuation
                           of the specified land undertaken by a certified practicing valuer. If the
                           Council accepts the valuation, the valuation is the establishment cost of
                           the infrastructure.

                  (b)      If the Council does not agree with the applicant’s valuation, the Council
                           will provide its own alternative valuation to the applicant. If the applicant
                           agrees with the Council’s alternative Pre-Market Estimate, it becomes
                           the establishment cost of the infrastructure.

                  (c)      If agreement cannot be reached on the valuation, an independent
                           assessor is to be appointed by agreement between the Council and the
                           applicant to determine the estimate. The cost of this independent
                           assessment is to be equally shared between the local authority and the
                           applicant and the amended valuation estimate determined by the
                           independent assessor becomes the establishment cost of the
                           infrastructure.

                           However, if the Council and the applicant cannot reach agreement on
                           the appointment of an independent assessor, the establishment cost of
                           the infrastructure is determined by calculating the average of the
                           previous two valuation estimates prepared on behalf of the applicant and
                           the Council respectively.


  12.         Refund of an unused infrastructure offset
12.1    Purpose

        Section 12 states the Council’s policy for a refund of an unused infrastructure offset for
        provision of trunk infrastructure.




                               Council Resolution effective 23 September 2019

Section 27

                                                      27
                                              Noosa Shire Council
                                         Charges Resolution (No.4) 2019



12.2    Application of section

        Section 12 applies where:

                 (a)      the development to which the trunk infrastructure relates has been
                          lawfully completed;

                 (b)      the trunk infrastructure is planned under this document to service the
                          development of other premises and has been completed and handed
                          over to Council;

                 (c)      the amount of the value of an infrastructure offset has not been fully
                          offset against a levied infrastructure charge to which the trunk
                          infrastructure relates.

12.3    Payment of a refund

        (1)      A refund will be paid by Council (as applicable) to the applicant in accordance
                 with the following:
                 (a)      the refund will not exceed the value of the unused infrastructure offset
                          and is not subject to indexation;
                 (b)      The amounts and timing of refund payments will be made as follows:
                          (i)       for refund amounts up to $150,000, the payment will occur in the
                                    December quarter in the financial year following completion of the
                                    works and handover of the trunk infrastructure to Council; and
                          (ii)      for remaining refund balance amounts over $150,000 up to
                                    $500,000 the payment will occur in the December quarter in the
                                    second financial year following completion of the works and
                                    handover of the trunk infrastructure to Council; and
                          (iii)     for any remaining refund balance amounts over $500,000, the
                                    payment will occur in the December quarter in the third financial
                                    year following completion of the works and handover of the trunk
                                    infrastructure to Council.

  13.         CONVERSION APPLICATIONS

13.1    Purpose

        Section 13 states the Council’s criteria for consideration and assessment of applications
        to convert non-trunk infrastructure to trunk infrastructure.

13.2    Application of section

        (1)       This section applies if:
                  (a)     a condition of a development approval requires non-trunk infrastructure
                          to be provided; and
                  (b)     the construction of the non-trunk infrastructure has not started.




                                  Council Resolution effective 23 September 2019

Section 28

                                                   28
                                           Noosa Shire Council
                                      Charges Resolution (No.4) 2019




13.3   Conversion application process

       (1)     An applicant may apply to the local government to convert non-trunk
               infrastructure to trunk infrastructure.
       (2)     The application must be made in writing within the required period (see clause
               139 of the Planning Act).
       (3)     The local government must, within the required period (see clause 140 of the
               Planning Act), decide the conversion application having regard to the criteria for
               deciding the application stated in section 13.6.
       (4)     At any time before deciding the conversion application, the local government may
               give a notice to the applicant requiring the applicant to give information that the
               local government reasonably needs to make the decision (see clause140 of the
               Planning Act for notice requirements).

13.4   Notice of decision

       (1)     As soon as practicable after deciding the conversion application, the local
               government must give the applicant notice of the decision.
       (2)     If the decision is not to convert non-trunk infrastructure to trunk infrastructure, the
               notice must be an information notice about the decision.
       (3)     If the decision is to convert non-trunk infrastructure to trunk infrastructure, the
               written notice must state:
               (a)      that the infrastructure is trunk infrastructure
               (b)      if the infrastructure will be conditioned as a necessary infrastructure
                        condition
               (c)      if an offset or refund applies
               (d)      if an offset or refund applies, the details of that offset or refund.

13.5   Effect of conversion application decision

       (1)     If the local government has decided to convert non-trunk infrastructure to trunk
               infrastructure, it may amend the development approval by imposing a necessary
               infrastructure condition for the trunk infrastructure.
       (2)     If a necessary infrastructure condition is imposed, the local government must give
               either an infrastructure charges notice or an amended infrastructure charges
               notice including details of the offset or refund.

13.6   Criteria for deciding a conversion application

       (1)     Each of the following criteria must be met for non-trunk infrastructure to be
               converted to trunk infrastructure :
               (a)      the infrastructure services development that is-
                        (i)      consistent with the assumptions about the type, scale, location or
                                 timing of future development stated in the LGIP; and
                        (ii)     for premises completely inside the PIA.




                               Council Resolution effective 23 September 2019

Section 29

                                                     29
                                             Noosa Shire Council
                                        Charges Resolution (No.4) 2019



                 (b)      construction of the infrastructure has not yet started
                 (c)      the infrastructure is inconsistent with the requirements for non-trunk
                          infrastructure stated in clause 153 of the Planning Act.
                 (d)      the infrastructure is owned or will be owned by the local government
                 (e)      the infrastructure is not temporary infrastructure
                 (f)      the infrastructure will be used by other development
                 (g)      the type, capacity and function of the infrastructure is:
                          (i)      consistent with the trunk infrastructure identified in the local
                                   government’s LGIP and the examples of trunk infrastructure
                                   identified for a network in Table 13.1
                          (ii)     inconsistent with the examples of non-trunk infrastructure identified
                                   for a network in Table 13.1
                 (h)      the type, size and location of the infrastructure is the most cost effective
                          option for servicing multiple developments in the area.
                 (i)      the infrastructure could have been planned by the local government
                          without knowing the detailed layout of lot reconfigurations or the design
                          details for material change of use applications in the area. That is, the
                          infrastructure could have been planned during preparation of the LGIP
                          using only the planned density assumptions stated in the LGIP.
        (2)      The most cost effective option for trunk infrastructure provision means the least
                 cost option based upon the life cycle cost of the infrastructure required to service
                 future urban development in the area at the desired standard of service.
Table 13.1 – Examples of trunk infrastructure and non-trunk infrastructure for Council’s
networks

Infrastructure network   Examples of trunk infrastructure                 Examples of non-trunk infrastructure

Stormwater               Land and/or works for:                           Land and/or works for:
                         • the following stormwater infrastructure         • Privately     owned      stormwater
                           items which service a minimum of 300              infrastructure (e.g. dams, retention
                           residential lots or equivalent demand:            basins on private property)
                            o Bio-retention swale                          • bulk   stormwater      infrastructure
                            o Channel                                        owned by state or state entity
                            o Culvert                                      • the        following    stormwater
                            o Pipe                                           infrastructure items which service
                                                                             less than 300 residential lots or
                            o Revegetation                                   equivalent demand:
                            o Stormwater quality devices                     o Bio-retention swale
                            o Retention basin / wetland                      o Channel
                            o Detention basin                                o Culvert
                                                                             o Pipe
                                                                             o Revegetation
                                                                             o Stormwater quality devices
                                                                             o Retention basin / wetland
                                                                             o Detention basin




                                 Council Resolution effective 23 September 2019

Section 30

                                                  30
                                          Noosa Shire Council
                                     Charges Resolution (No.4) 2019



Infrastructure network   Examples of trunk infrastructure              Examples of non-trunk infrastructure

Transport                Land and/or works for:                        Land and/or works for:
                         • the following local government roads,       •       State controlled roads
                           including associated intersections,         •   the following local government
                           roundabouts, bridges and culverts:              roads,      including    associated
                            o arterial roads                               intersections, roundabouts, bridges
                            o sub-arterial roads                           and culverts:
                            o district collector roads in urban            o access streets
                                areas having a capacity equal to           o access roads
                                or greater than 16,000 vpd and             o minor collector roads.
                                servicing a minimum of 300
                                residential lots or equivalent         •       standard items associated with the
                                demand                                         road profile of a local government
                                                                               road specified above including kerb
                            o district collector roads in non-                 and channelling, lighting, signage,
                                urban areas having a capacity                  traffic lights, foot and cycle paths
                                equal to or greater than 1,000 vpd             and basic verge plantings
                                and servicing a minimum of 100
                                residential lots or equivalent         •       bus stops constructed as part of a
                                demand                                         local government road specified
                                                                               above.
                         • standard items associated with the
                           road profile of a local government road     •       streetscaping
                           specified above, including kerb and         •       local area traffic management
                           channelling, lighting, signage, traffic     •       pedestrian and cycle paths which
                           lights, foot and cycle paths and basic              perform a local neighbourhood
                           verge plantings                                     function
                         • pedestrian and cycle paths which
                           perform a shire wide or district function
                         • bus stops constructed as part of a
                           local government road specified above
Public parks and land    Land and/or works that ensure the land is     Land and/or works for:
for community            suitable for:                                 •       Privately owned parks
facilities               • the following public parks and land for     •       National parks
                           community facilities which service a
                           minimum of 300 residential lots or          •       State forestry areas
                           equivalent demand:                          •       Areas within local government
                            o district recreation park                         owned parks that allow limited
                                                                               public access or do not perform a
                            o shire wide recreation park
                                                                               primary    park   function    (e.g.
                            o district sporting park                           bushland,      waterways       and
                            o shire wide sporting park                         environmental areas)
                            o local land for community facilities      •   Any public park or land for
                                for the purpose of community               community facility which services
                                halls or centres, public recreation        less than 300 residential lots or
                                centres and public libraries.              equivalent demand
                         • Embellishments necessary to make            Any embellishments for a trunk public
                           the above specified public parks safe       park which are not specified as
                           and useable including:                      examples of trunk infrastructure.
                            o footpaths and cycle paths
                            o shade structures
                            o picnic & play facilities




                              Council Resolution effective 23 September 2019

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.