12
Noosa Shire Council
Charges Resolution (No.4) 2019
AC4 is the adopted charge rate for each defined use for a material change of
use or building work for non-residential development stated in section
8.3 (Council adopted charge rate) for the transport, public parks and
land for community facilities networks.
ACSW is the adopted charge rate for a material change of use or building work
for non-residential development stated in section 8.3 (Council adopted
charge rate) for the stormwater network.
Q4 is the non-residential quantity for each defined use.
QSW is the impervious area of the development.
C4 is the credit stated in section 8.4 (Credit) for the transport, public parks
and land for community facilities networks.
CSW is the credit stated in section 8.4 (Credit) for the stormwater network.
(4) An infrastructure charge is only levied if the calculation in sub-sections (1), (2)
and (3) results in an amount greater than $zero (i.e. no refund applies should the
calculated charge result in a negative amount).
8.3 Council adopted charge rate
The adopted charge rate for:
(a) reconfiguring a lot, is the amount stated equivalent to a Residential (3 or
more bedroom dwelling unit) in Table 10.3 (Schedule of Council adopted
charges);
(b) a material change of use or building work for:
(i) residential development, is stated in Table 10.3 (Schedule of
Council adopted charges);
(ii) non-residential development other than other uses, is stated in
Table 10.3 (Schedule of Council adopted charges), which
comprises the following:
(A) the adopted charge rate for the transport, public parks
and land for community facilities networks; and
(B) the adopted charge rate for the stormwater network;
(iii) non-residential development being other uses or development
not otherwise identified in paragraphs (i) or (ii):
(A) the adopted charge rate for the transport, public parks
and land for community facilities networks being the
prescribed amount for another similar use that the local
government decides to apply to the use (refer to
Schedule 16 of the Planning Regulation 2017); and
(B) the adopted charge rate for the stormwater network
Council Resolution effective 23 September 2019