Original source · versioned page text
2019-09-10 P&E Agenda - Item 1 - Attachment 1 - Noosa Shire Council Charges Resolution (No 4) 2019
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
15
Noosa Shire Council
Charges Resolution (No.4) 2019
10. Allocation of adopted infrastructure charge (breakup
agreement)
10.1 Purpose
Section 10 states how the adopted infrastructure charge of the Council and the distributor-
retailer is to be allocated in accordance with the breakup agreement.
10.2 Allocation of adopted infrastructure charge to the Council and the distributor-
retailer (breakup agreement)
(1) The proportion of an adopted infrastructure charge to be allocated to the Council
and the distributor-retailer is stated in Table 10.1 (Allocation of adopted
infrastructure charge (breakup agreement) to the Council and the distributor-
retailer). For non-residential development, this proportion of the adopted charge
excludes the stormwater network which is calculated separately and allocated
100% to Council.
(2) The levied charge is calculated and issued separately by the Council and
distributor-retailer as applying to their respective infrastructure networks in
accordance with the breakup agreement.
(3) Where development is not connected to the water and sewerage networks, the
levied charge issued by distributor-retailer is reduced as determined by the
distributor-retailer.
Council Resolution effective 23 September 2019
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.