Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

2019-09-10 P&E Agenda - Item 1 - Attachment 1 - Noosa Shire Council Charges Resolution (No 4) 2019

of 30

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                                 5
                        Noosa Shire Council
                   Charges Resolution (No.4) 2019



applicable local planning instrument means The Noosa Plan 2006 planning
scheme.
base date means the date being:

(a)      The date for the financial year applying to the adopted charge rates
         specified in section 10.4 (Schedule of Council Adopted Infrastructure
         Charges (under breakup agreement)).

(b)      The date stated in the LGIP for estimates of the establishment costs for
         the local government’s trunk infrastructure networks;

(c)      The date stated in the Netserve Plan for estimates of the establishment
         costs for the distributor-retailer’s trunk infrastructure networks.

bedroom means an area of a building or structure which:

(a)      is used, designed or intended for use for sleeping (but excludes a lounge
         room, dining room, living room, kitchen, water closet, bathroom, laundry,
         garage or plant room); or

(b)      other habitable rooms that can be used for sleeping such as a den,
         library, study, loft, media or home entertainment room, library, family or
         rumpus room or other similar space. (Non-habitable rooms will not be
         considered in the calculation of infrastructure charges)

breakup agreement means the agreement between the local government and
the distributor-retailer determining the proportion of the maximum adopted
charges to apply to each entity.

charges resolution see Planning Act 2016 section 113 (1).

Council means Noosa Shire Council.

credit means the amount to be applied for the purpose of reducing an adopted
infrastructure charge which takes into account the existing usage of the trunk
infrastructure networks by the premises on or in relation to which development is
carried out as calculated in section 8.4 (Credit) and 8.5 (Additional credit for past
contribution or charge).

demand means the deemed usage of the trunk infrastructure networks by the
development on the premises and correlates to the charge rates for the use/s
stated in section 8.3 (Council adopted charge rate) for the purpose of calculating
the levied charge stated in section 8.2 (Calculation of Council levied charge).




            Council Resolution effective 23 September 2019
Log in to download the original file

2019-09-10 P&E Agenda - Item 1 - Attachment 1 - Noosa Shire Council Charges Resolution (No 4) 2019(PDF, 652KB).pdf · 668 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.