Original source · versioned page text
2019-09-10 P&E Agenda - Item 1 - Attachment 1 - Noosa Shire Council Charges Resolution (No 4) 2019
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
5
Noosa Shire Council
Charges Resolution (No.4) 2019
applicable local planning instrument means The Noosa Plan 2006 planning
scheme.
base date means the date being:
(a) The date for the financial year applying to the adopted charge rates
specified in section 10.4 (Schedule of Council Adopted Infrastructure
Charges (under breakup agreement)).
(b) The date stated in the LGIP for estimates of the establishment costs for
the local government’s trunk infrastructure networks;
(c) The date stated in the Netserve Plan for estimates of the establishment
costs for the distributor-retailer’s trunk infrastructure networks.
bedroom means an area of a building or structure which:
(a) is used, designed or intended for use for sleeping (but excludes a lounge
room, dining room, living room, kitchen, water closet, bathroom, laundry,
garage or plant room); or
(b) other habitable rooms that can be used for sleeping such as a den,
library, study, loft, media or home entertainment room, library, family or
rumpus room or other similar space. (Non-habitable rooms will not be
considered in the calculation of infrastructure charges)
breakup agreement means the agreement between the local government and
the distributor-retailer determining the proportion of the maximum adopted
charges to apply to each entity.
charges resolution see Planning Act 2016 section 113 (1).
Council means Noosa Shire Council.
credit means the amount to be applied for the purpose of reducing an adopted
infrastructure charge which takes into account the existing usage of the trunk
infrastructure networks by the premises on or in relation to which development is
carried out as calculated in section 8.4 (Credit) and 8.5 (Additional credit for past
contribution or charge).
demand means the deemed usage of the trunk infrastructure networks by the
development on the premises and correlates to the charge rates for the use/s
stated in section 8.3 (Council adopted charge rate) for the purpose of calculating
the levied charge stated in section 8.2 (Calculation of Council levied charge).
Council Resolution effective 23 September 2019
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.