Original source · versioned page text
5179Flood Report_REV_3
Callaghan & Toth
LOW-FLOW OUTLET PIPE, APPROX 375 DIA TH
EMERGENCY / HIGH FLOW WEIR OVER FOOTPA
94 00
CONFINEMENT BUND
SWALE
99E. AR 21
0.8
10
xIL 100.10
4
Y
1.
0 0.
10 10
BACKWATERED SWALE 0.6 100 YR
2
10
1.
4
5m WIDE x 0.5m DEEP VEE
1.
10
10
x FL 100.45 99.85
375 DIA
1 ON 4 BATTERS ABOVE 2 x APPROX
102
x NOW
100.6
0.8
.0
10
101
x .95
99
2
100
100.8
L TW 101.10
.
101
WAL
MID/HIGH FLOW OUTLET BOX
101.2
101.4
OFFLINE BASIN
x TW 101.35
101.4
100 YR WL 101.26
1
FOOTPA
10
BIO FL 100.55
x
100.6
FL 100.55
x
TH
101.4 101.2 101.0 100.8
FOOTPATH
.26
100
0 SCALE 25m
Figure 3.3 Proposed Stormwater Detention Facilities
10
2035 2 Pearsons Road – Flood Study – Revision 3 April 2021
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.