Original source · versioned page text
5179Flood Report_REV_3
Callaghan & Toth
Rain # 1 L=0.030 U=0.00
Route L=0.030 U=0.25
Store.
Rain # 2 L=0.015 U=0.00
Get.
Route L=0.030 U=0.25
Store.
Rain # 3 L=0.020 U=0.20 I=0.55
Get.
Route L=0.045 U=0.20
Store.
Rain # 4 L=0.020 U=0.20 I=0.55
Route L=0.056 U=0.20
Get.
Route L=0.036 U=0.50
Store.
Rain # 5 L=0.030 U=0.25 I=0.55
Store.
Rain # 6 L=0.030 U=0.25 I=0.55
Get.
Get.
Print. TMR1
Loss C=0.46
{Throws away everything up to 0.46 m3/s}
Print.TMR2
Route L=0.078 U=0.00
Store.
Factor=1.0
Rain # 7 L=0.072 U=0.00 I=0.45
Factor=1.5
Add Rain # 8 L=0.036 U=0.20 I=0.55
Store.
Factor=1.0
Rain # 9 L=0.045 U=0.00 I=0.17
Factor=1.5
Add Rain # 10 L=0.030 U=0.20 I=0.55
Get.
Get.
Route L=0.030 U=0.50
Store.
Rain # 11 L=0.020 U=0.25 I=0.55
Get.
Route L=0.027 U=0.50
Store.
Rain # 12 L=0.020 U=0.25 I=0.60
Route L=0.020 U=0.50
Get.
Route L=0.062 U=0.00
Add Rain # 13 L=0.020 U=0.70 I=0.15
Print. BASIN
Dam Route VBF=0.0 Number=6
{THOU M3 CUMEC}
0.000 0.00
L
2035 2 Pearsons Road – Flood Study – Revision 3 April 2021
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.