Original source · versioned page text
5179Flood Report_REV_3
Callaghan & Toth
EL (m)
101.4
100YR VOL 334 m3 REQUIRES WL 101.26
x
101.2
NETT DETENTION VOL
x
20YR VOL 243 m3 REQUIRES WL 101.09 NORMAL (UN-BACKWATERED)
VOLUME IN SWALE
101.0 x
5YR VOL 190 m3 REQUIRES WL 100.98
1YR VOL 128 m3 REQUIRES WL 100.84
x TOTAL VOL IN BASIN + SWALE
100.8
100.6
100.4
100.2
0 50 100 150 200 250 300 350 400 450 500
VOLUME (m3)
O
2035 2 Pearsons Road – Flood Study – Revision 3 April 2021
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.