Original source · versioned page text
5179Flood Report_REV_3
Callaghan & Toth
CONTENTS
1.0 INTRODUCTION .................................................................................................................... 4
Figure 1.2 Existing Site Topography And Relevant Catchment Boundaries ............................. 5
Figure 1.3 Proposed Development Layout And Relevant Catchment Boundaries ..................... 5
2.0 FLOOD IMMUNITY ................................................................................................................. 6
3.0 STORMWATER DETENTION REQUIREMENT ............................................................ 7
3.1 Broad-Brush Estimate Of Required Detention Volume ....................................................... 7
3.2 Hydrologic Model Set Up .................................................................................................... 7
Table 1 Predicted Peak Outflow Rates (m3/sec) – Sanity Check................................................ 8
3.3 Model Determination Of The Required Detention Volume ................................................. 9
Table 2: Required Detention Volumes ....................................................................................... 9
3.4 Provision of Required Detention Volume ............................................................................ 9
Table 3 Required Detention Water Levels.......................................................................... 9
4.0 SUMMARY ........................................................................................................................... 11
APPENDIX 1 - Reconfiguration of a Lot Layout plans .................................................................... A
APPENDIX 2 - FLOOD CALCULATIONS ..................................................................................... D
LIST OF FIGURES
Figure 1.1 Site Location Plan……………………………………………………………..........4
Figure 3.1 URBS Model of the Pre-Development Catchment Condition……….………….7
Figure 3.2 URBS Model Of the Post-Development Catchment Condition……….……......8
Figure 3.3 Proposed Stormwater Detention Facilities………………………………..…......10
LIST OF TABLES
Table 1 Predicted Peak Outflow Rates……………………..……………. …………………………8
Table 2 Required Detention Volumes …………………….……………. …………………………..9
3
2035 2 Pearsons Road – Flood Study – Revision 3 April 2021
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.