CONTENTS
1.0    INTRODUCTION .................................................................................................................... 4
Figure 1.2 Existing Site Topography And Relevant Catchment Boundaries ............................. 5
Figure 1.3 Proposed Development Layout And Relevant Catchment Boundaries ..................... 5
2.0    FLOOD IMMUNITY ................................................................................................................. 6
3.0 STORMWATER DETENTION REQUIREMENT ............................................................ 7
3.1 Broad-Brush Estimate Of Required Detention Volume ....................................................... 7
3.2 Hydrologic Model Set Up .................................................................................................... 7
Table 1 Predicted Peak Outflow Rates (m3/sec) – Sanity Check................................................ 8
3.3 Model Determination Of The Required Detention Volume ................................................. 9
Table 2: Required Detention Volumes ....................................................................................... 9
3.4 Provision of Required Detention Volume ............................................................................ 9
     Table 3 Required Detention Water Levels.......................................................................... 9
4.0    SUMMARY ........................................................................................................................... 11
APPENDIX 1     - Reconfiguration of a Lot Layout plans .................................................................... A
APPENDIX 2     - FLOOD CALCULATIONS ..................................................................................... D



LIST OF FIGURES

Figure 1.1                      Site Location Plan……………………………………………………………..........4
Figure 3.1                      URBS Model of the Pre-Development Catchment Condition……….………….7
Figure 3.2                      URBS Model Of the Post-Development Catchment Condition……….……......8
Figure 3.3                      Proposed Stormwater Detention Facilities………………………………..…......10




LIST OF TABLES

Table 1              Predicted Peak Outflow Rates……………………..……………. …………………………8
Table 2              Required Detention Volumes …………………….……………. …………………………..9




                                                                                                                                      3
2035 2 Pearsons Road – Flood Study – Revision 3                                                                    April 2021
Log in to download the original file

5179Flood Report_REV_3.pdf · 3.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.