Original source · versioned page text
2509-48117 SRA - Response with conditions
Attached to the e-mail RAL25/0016 - SARA Referral agency response – with conditions.
2509-48117 SRA
Attachment 1—Referral agency conditions
(Under section 56(1)(b)(i) of the Planning Act 2016 the following conditions must be attached to any development
approval relating to this application) (Copies of the documents referenced below are found at Attachment 5)
No. Conditions Condition timing
Reconfiguring a lot
10.9.4.2.1.1 – Reconfiguring a lot within 25m of a State controlled road—The chief executive
administering the Planning Act 2016 nominates the Director-General of the Department of Transport and
Main Roads (DTMR) to be the enforcement authority for the development to which this development
approval relates for the administration and enforcement of any matter relating to the following conditions:
Access to a State controlled road
1. a) Road access must be located generally in accordance with: a) At all times.
‘Proposed Subdivision Cancelling Lot 4 on RP136445’,
prepared by Macro Spatial Solutions, dated 27 June 2025, b) and (c) Prior to
drawing number 2025030-DET-001, revision 01. submitting the Plan of
b) Provide road access works at the road access location comprising Survey to the local
a rural residential driveway, with a 6m wide throat and sealed government for
between the pavement edge and property boundary. approval.
c) The road access works must be designed and constructed in
accordance with:
The Department of Transport and Main Roads Road Planning
and Design Manual (RPDM) – second edition.
Rural Property Access, Standard Drawing SD1807 Type A,
Issue B with a 450 mm diameter pipe for drainage and include
sloping headwalls at both sides.
2. a) Provide reciprocal access easements on the titles of proposed lots a) At the time of Plan
41 and 42 for the shared access generally in accordance with: of Survey registration
‘Proposed Subdivision Cancelling Lot 4 on RP136445’,
prepared by Macro Spatial Solutions, dated 27 June 2025, b) Within 20 business
drawing number 2025030-DET-001, revision 01. days of registration of
b) Provide evidence that part (a) of this condition has been complied the easements
with to the Department of Transport and Main Roads via
[email protected] management
3. Stormwater management of the development must not cause At all times.
worsening to the operating performance of the State controlled road,
such that any works on the land must not:
i. create any new discharge points for stormwater runoff onto the
State controlled road
ii. concentrate or increase the velocity of flows to the State
controlled road
iii. interfere with and/or cause damage to the existing stormwater
drainage on the State controlled road
iv. surcharge any existing culvert or drain on the State controlled
road
v. reduce the quality of stormwater discharge onto the State
controlled road
vi. impede or interfere with any overland flow or hydraulic
conveyance from the State controlled road
vii. reduce the floodplain immunity of the State controlled road.
State Assessment and Referral Agency Page 3 of 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original