ORDINARY MEETING AGENDA 15 NOVEMBER 2018
a. Be in compliance with IPWEAQ standard drawing SEQ R-065 Concrete Pathway
Construction Details;
b. Be extended to smoothly tapered and join with the existing path along Garnet
Street.
Reinstatement Works
21. Any redundant driveway and/or kerb layback must be removed, and the kerb line and
verge area reinstated and landscaped to match the existing kerb and/or verge
treatments. Grassed verge areas to be reinstated must be provided with 100 mm
topsoil and turf, and must be maintained by the developer until established.
22. Any redundant private pathway to the property must be removed, and verge area
reinstated and landscaped to match the verge treatments.
23. Any damaged kerb and channel along the frontage of the site must be repaired to the
reasonable satisfaction of Council’s representative.
Site Access and Driveways
24. A sealed access driveway must be provided from Garnet Street to all parking and
manoeuvring areas of the development. The works must be undertaken in accordance
with an Operational Works approval and must include in particular:
a. Driveway crossovers in accordance with IPWEAQ standard drawings R-049 and
R-050 to grades prevent vehicles from scraping and/or bottoming whilst also
allowing for compliant grades for the footpath and pedestrians movements along
the footpath and the grassed verge without any step or trip hazard.
Car Parking
25. Car parking must be provided within the site generally as shown on the approved plans.
The works must be undertaken in accordance with an Operational Works approval and
must be in compliance with the provisions of AS/NZS 2890.1-2004 with allowance for
standard vehicle to enter and leave the site in a forward gear and with a minimum head
clearance (headroom) at any point of 2.2m.
26. All car parking areas and access driveways must be maintained exclusively for vehicle
parking and manoeuvring and kept in a tidy and safe condition at all times.
Stormwater Drainage
27. The site must be provided with a stormwater drainage system connecting to a lawful
point/s of discharge in Garnet Street and/or Wattle Street. The works must be
undertaken in accordance with an Operational Works approval in compliance with the
relevant sections of Queensland Urban Drainage Manual and supported by a detailed
stormwater drainage design prepared and certified by a suitably qualified and
experienced Registered Professional Civil Engineer (RPEQ).
28. The development of the site must not worsen existing drainage conditions on other
properties by diverting stormwater runoff or cause additional stormwater ponding on
any other property.
29. Stormwater runoff from the development must be disposed of on-site without causing
scour or damage to the subject site or any adjoining property.
Earthworks and Retaining Walls
30. All earthworks must be carried out in compliance with an Operational Works
Development Permit.
31. All earthworks and associated batters/retaining walls must be contained entirely within
the subject site unless written permission from the respective landowner(s) is provided
to Council.
Page 16 of 47