ORDINARY MEETING AGENDA                                                   15 NOVEMBER 2018


          a.   Be in compliance with IPWEAQ standard drawing SEQ R-065 Concrete Pathway
               Construction Details;
          b.   Be extended to smoothly tapered and join with the existing path along Garnet
               Street.
    Reinstatement Works
    21.   Any redundant driveway and/or kerb layback must be removed, and the kerb line and
          verge area reinstated and landscaped to match the existing kerb and/or verge
          treatments. Grassed verge areas to be reinstated must be provided with 100 mm
          topsoil and turf, and must be maintained by the developer until established.
    22.   Any redundant private pathway to the property must be removed, and verge area
          reinstated and landscaped to match the verge treatments.
    23.   Any damaged kerb and channel along the frontage of the site must be repaired to the
          reasonable satisfaction of Council’s representative.
    Site Access and Driveways
    24.   A sealed access driveway must be provided from Garnet Street to all parking and
          manoeuvring areas of the development. The works must be undertaken in accordance
          with an Operational Works approval and must include in particular:
          a.   Driveway crossovers in accordance with IPWEAQ standard drawings R-049 and
               R-050 to grades prevent vehicles from scraping and/or bottoming whilst also
               allowing for compliant grades for the footpath and pedestrians movements along
               the footpath and the grassed verge without any step or trip hazard.
    Car Parking
    25.   Car parking must be provided within the site generally as shown on the approved plans.
          The works must be undertaken in accordance with an Operational Works approval and
          must be in compliance with the provisions of AS/NZS 2890.1-2004 with allowance for
          standard vehicle to enter and leave the site in a forward gear and with a minimum head
          clearance (headroom) at any point of 2.2m.
    26.   All car parking areas and access driveways must be maintained exclusively for vehicle
          parking and manoeuvring and kept in a tidy and safe condition at all times.
    Stormwater Drainage
    27.   The site must be provided with a stormwater drainage system connecting to a lawful
          point/s of discharge in Garnet Street and/or Wattle Street. The works must be
          undertaken in accordance with an Operational Works approval in compliance with the
          relevant sections of Queensland Urban Drainage Manual and supported by a detailed
          stormwater drainage design prepared and certified by a suitably qualified and
          experienced Registered Professional Civil Engineer (RPEQ).
    28.   The development of the site must not worsen existing drainage conditions on other
          properties by diverting stormwater runoff or cause additional stormwater ponding on
          any other property.
    29.   Stormwater runoff from the development must be disposed of on-site without causing
          scour or damage to the subject site or any adjoining property.
    Earthworks and Retaining Walls
    30.   All earthworks must be carried out in compliance with an Operational Works
          Development Permit.
    31.   All earthworks and associated batters/retaining walls must be contained entirely within
          the subject site unless written permission from the respective landowner(s) is provided
          to Council.

                                                                                  Page 16 of 47
Log in to download the original file

2018-11-15 Ordinary Meeting Agenda(PDF, 920KB).pdf · 943 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.