Original source · versioned page text
2018-11-15 Ordinary Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING AGENDA 15 NOVEMBER 2018
Nature and Extent of Approved Use
66. An additional 21 beds are approved for the Visitor Accommodation Type 4 –
Conventional (visitor hostel). The total number of beds approved are 69 and one
manager’s unit.
67. The approved accommodation units must be used for short term visitors only.
The approved units must not be occupied by persons for the purpose of
permanent accommodation.
68. Amplified music must not be audible at the boundaries of the site between 10pm
and 7am.
Landscaping
69. The development site must be landscaped. The works must be undertaken in
accordance with an Operational Works approval, the Planning Scheme Policy 3
Landscaping Plants and Guidelines for Sunshine Beach and must include in
particular:
a. the works generally shown on the approved site plan including:
i. A minimum 1.0 metre wide landscaping strip along the northern side
boundary of the subject site, exclusive of the access driveway,
generally uncompromised by infrastructure items designed such that
vegetated screening will be provided within 3 years of the plantings
occurring.
ii. A minimum 2.0 metre wide landscaping strip along the full extent of
the eastern boundary designed such that vegetated screening will be
provided within 3 years of the plantings occurring.
iii. Vegetated screening of any electrical transformers, bin storage areas
and the like from the road frontage
iv. Provision of 1 street tree within the road reserve for every 8 metres
of road frontage including landscaping to the crossover works
v. Trees on the northern boundary must be retained to provide visual
screening of the development. Where civil works impact on the
capacity to retain the tree, the tree may be removed and replaced
with a tree of a minimum pot sized 100 litres.
70. All landscape works must be established and maintained in accordance with the
approved design for the life of the development, and in a manner that ensures
healthy, sustained and vigorous plant growth. All plant material must be allowed
to grow to full form and be refurbished when its life expectancy is reached.
Performance Bond
71. Security in the form of a cash bond or trading bank guarantee to the sum of
$10,000 must be submitted to Council, to secure performance of all conditions of
this approval, prior to the issue of a Development Permit for Operational Works.
The cash bond or trading bank guarantee will be returned on performance of the
conditions of approval less any costs incurred by Council in respect of enforcing
performance of this permit. Council reserves the right to call upon the bond or
guaranteed sum to effect compliance with conditions.
Water & Sewer Connections
72. An underground connection to reticulated water and sewerage must be provided
to the development site in accordance with the standards and requirements of
Northern SEQ Distributor–Retailer Authority (Unitywater).
Page 18 of 47
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.