a. The site area for the storage and separation of waste is to be shown on the plan
drawings accompanying the application.
b. A waste management table as indicated below is to be completed showing how
waste material is to be segregated - recycled – reused or disposed.
c. Table – Waste Management Table
MATERIALS ON-SITE DESTINATION
Re-use and Recycling Disposal
Expected Estimated On-site Off-site *specify contractor
waste volume(m³) *specify proposed *specify contractor and landfill site or
materials re-use or on-site and recycling outlet other disposal site
recycling methods
Excavation
material
Green waste
Bricks
Concrete
Timber-
please
specify
Plasterboard
Metals -
please
specify
Asbestos
Other -
please
specify
Note * If a demolition contractor is undertaking works, then the Waste Management
table is to be completed by the demolition contractor.
WASTE
40. The developer must provide waste storage and disposal facilities in accordance with
Planning Scheme Policy No. 9 "Waste Management Multi-Dwellings and Commercial
and Industrial Premises". The facilities must include an external impervious area
correctly sized for all refuse and recycling containers and suitably screened from public
places and neighbouring properties. A bin wash area is required with a cold-water tap,
hose and drain outlet connected to sewer, via a bucket trap. The drain outlet must be
designed to prevent storm water entry to the sewerage system. This can be achieved
with a nib wall 50mm high and up to 700mm x 700mm wide (max 0.5m2) , or
alternatively the waste area can be roofed, or any other design approved by Council.
41. Refuse containers must be provided in accordance with the requirements of the
Environmental Protection (Interim Waste) Regulation 1996 and (Waste Management)
Regulation 2000, for the storage and collection of refuse.
42. Bins must be provided throughout the site to reduce littering. All bins provided must be
for refuse and recycling and be decanted into the bulk bins by the site operators.
ENGINEERING
Site Specific Conditions
43. The proposed flood barrier must be of a design that is activated by the rising flood
levels and the associated hydraulic differential to raise and lower the barrier. The
barrier must not require a power supply or human intervention. The barrier must be
maintained by the property owner in accordance with the manufacturer’s specifications.
The works must be undertaken in accordance with an Operational Works approval and
must include in particular:
Page 28 of 47
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.