Original source · versioned page text
SafeWorkMethodStatement QLD Demolition
Safe Work Method Statement – 16-120 POINCIANA AVE, TEWANTIN QLD 4565
Revision No: 1 Printed Date: Page 7
KHODR CIVIL PTY LTD Initial 19/02/2025
Work Sequence Potential Hazards Potential Risk Risk Score
1.1 General Planning 1.1 Inadequate training, planning and 1.1 Task specific injuries due to inexperience or failure to 1
improvisation provide appropriate equipment
Control Method Residual
1.1 Ensure the people carrying out the work are skilled and competent enough to safely carry out the work. 4
Ensure there is enough competent supervision.
Plan for the required equipment hire.
Work Sequence Potential Hazards Potential Risk Risk Score
2.1 Planning by Principal 2.1 Insufficient Lighting 2.1 Walk into objects, slips, trips, and falls and other 1
Contractor or 2.2. Poor access to work areas injuries.
Subcontractor 2.3 Lack of adequate ventilation 2.2 Slips, trips and falls; abrasions, strains and sprains; 4
2.4 Working at height near edge manual handling injuries e.g. back damage.
2.5 Penetrations not covered 2.3 Illness; breathing difficulties – overcome by fumes. 2
2.6 Formwork inadequate 2.4 Fall from edge 2
2.5 Fall through penetration 3
2.6 Fall injury due to formwork failure 3
Control Method Residual
2.1 Provide artificial light at the work face in enclosed areas where natural light is reduced to levels considered too low to work 4
safely.
Ensure access ways are adequately defined and lighted
2.2 Maintain good housekeeping practices. 5
Keep area around work area (min 550 mm wide) clear of stored materials and/or rubbish.
Provide adequate access and egress for demolishers and their equipment.
Do not commence demolishing in an area where the deck is incomplete and or other traders are still working.