SafeWorkMethodStatement QLD Demolition
Safe Work Method Statement – 16-120 POINCIANA AVE, TEWANTIN QLD 4565
Revision No: 1 Printed Date: Page 9
KHODR CIVIL PTY LTD Initial 19/02/2025
Work Sequence Potential Hazards Potential Risk Risk Score
4. Check 4.1 Electricity 4.1 Electrocution 1
disconnection of 4.2 Gas 4.2 Inhalation / Explosion / Fire / Burns 1
Services 4.3 Water 4.3 Flooding 1
Control Method Residual
4.1 Disconnection by Principal Contractor 5
Certification of disconnection to be given to demolition contractor
4.2 Disconnection by Principal Contractor 5
Certification of disconnection to be given to demolition contractor
4.3 Disconnection by Principal Contractor 5
Certification of disconnection to be given to demolition contractor
Work Sequence Potential Hazards Potential Risk Risk Score
5. Removal of 5.1 Falling objects 5.1 Cuts and abrasions 3
existing ceilings 5.2 Falling Personnel 5.2 Broken bones 3
& ceiling 5.3 Dust 5.3 Inhalation, eye damage, ear damage. 2
structures
Control Method Residual
5.1 Dust masks to be worn while removing ceilings 5
Area to be closed to the public
Area to be closed to non essential workers 5
Ensure correct PPE for the required task is supplied and used at all times 4
5.2 Ladders and access scaffolds to be braced and on suitable footing
5.3 Control methods as per 5.1
Materials to be handled in a workmanlike manner
Materials to be stockpiled in an orderly manner.
Provide clean, fresh water for flushing eyes at the workplace.