Skip to the record
Noosa’s premier civic archive.

Council archive · source document

Response to Council's Further Advice · 51988.2740.02

of 3

Text shows just the words. Original shows the document exactly as it was published.

                                                              DANYA COOK TOWN PLANNING


Applicant’s Response

In response to Item 5 of Council’s Further Advice, the proposed extended garage will continue to function as a single garage,
therefore a compliant swept path plan has been provided for a single B99 vehicle, as demonstrated by the Engineering
Assessment, Plan No.: 3548 – SK02, prepared by Contour Consulting Engineers Pty Ltd included at Appendix D.

A review of the Noosa Plan 2020 indicates that the requirements for off-street parking spaces for a Dual Occupancy are two
(2) covered spaces and one (1) uncovered space (three (3) spaces total). The existing parking spaces at the property are two
(2) covered and two (2) uncovered spaces. The current parking arrangement will be maintained post development.
Therefore, the proposed extended garage has no requirement to function as a double garage.

Issue – Stormwater Management

There is no detail included to demonstrate where stormwater runoff from the garage and the new hardstand will be
controlled, directed, and discharged.

Information Required

6. Provide additional detail on where stormwater runoff from the garage and the new hardstand will be controlled, directed,
   and discharged. Please note that runoff must not be directed on to any adjoining property.

Applicant’s Response

In response to Item 6 of Council’s Further Advice, Contour Consulting Engineers Pty Ltd conducted a site visit and review of
stormwater runoff under the existing conditions and the proposed post developed conditions.

Under the existing conditions, roof water discharges to existing kerb adaptors in Parkedge Road. Stormwater runoff from
the driveway and surrounding surfaces generally falls toward a stormwater pit within the existing driveway and outlets to an
existing stormwater manhole in Parkedge Road.

Under post development conditions the stormwater runoff will continue to function as in the pre-development state. Roof
water will discharge via the existing kerb adaptors in Parkedge Road, and the driveway and uncovered parking spaces will
fall toward the internal drainage pit.

Please refer to the Engineering Assessment, Plan No.: 3548 – SK01, prepared by Contour Consulting Engineers Pty Ltd
included at Appendix D.

3.0       SUMMARY

I trust Council will issue a favourable Development Permit in due course and should Council have any questions with respect
to the above, please do not hesitate to contact me.

Kind regards,




Danya Cook B.Urb.Reg.Plan
Director / Principal Town Planner

M: 0422 051 263
E: [email protected]




                                                             3


Response to Council’s Further Advice                                                                             August 2023

Used in these records

About this file

File size
284 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Response to Council's Further Advice.pdf · 284 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.