Skip to the record
Beware of cheap imitations.

Original source · versioned page text

2018-07-06 SM - Attachment 1 to Item 5 - Level of Service Catalogue

of 150

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Service Listing 1 of 1
Service Output                  CANALS & WATERWAYS
                                Conservation and maintenance of canals, foreshores of natural waterways,
                                and related marine infrastructure.

Service Activity                Technical Services, Maintenance & Operations
                                The activities include maintaining support for revetment walls within canals
                                and at natural waterways through sand dredging or rock placement,
                                maintaining groynes or revetment walls protecting public land,
                                maintenance and operations of the Noosa Waters Lock & Weir, and public
                                marine facilities (jetties, pontoons, boat ramps) as well as responding to
                                environmental incidents.
                   1
Responsible Area                Department                             Branch
                                Infrastructure Services                Infrastructure Planning, Design &
                                                                       Delivery
                                                                       Civil Operations (Civil Works &
                                                                       Maintenance)

                                Community Services                     Waste & Environmental Health
                                                                       (recreational water quality testing;
                                                                       investigations for water pollution
                                                                       incidents )

                                Environment & Sustainable              Environmental Services (Waterways
                                Development                            management)
Cost Centres                    Canals & Waterways                     2013
                                Noosa Waters Canal M’ment Levy         2024
                                Noosa Waters Lock                      2106
                                Public Health                          1801
                                Waterways Management                   2401
                                Department Management – Director       1900
                                Infrastructure Services
                                Management Civil Operations            2000
                                Works Operations Coordination          2021
                                Works Operations                       2704

Key Statistics                  Length of canal revetment – Noosa      2.47 km (approx.)
                                      2
                                Sound

                                Length of canal revetment – Noosa      14.5 km (approx.)
                                       3
                                Waters
                                                                           4
                                Public boat ramps                      8

                                                                               5
                                Public jetties &pontoons               19

                                Groynes/foreshore protection           2 (Spit Beach & Munna Point
                                installations                          Foreshore)
                                                                              2
                                Noosa River Catchment (63% of Shire    583km
                                               2
                                area of 869.8km )
                                                                                   2
                                Mary River Catchment (36% of Shire     313km
                                area)

                                •
                                                                                   nd
Legislative responsibility to       Land Act and Government Gazette dated 22 August 1987 placed all
provide this service                foreshores (area between low water and high water mark) in Noosa Shire
                                    under Council’s control.
                                •   Noosa Waters Canal consists of State Land set aside as reserve under

                                                                                                 Page 10
Log in to download the original file

2018-07-06 SM - Attachment 1 to Item 5 - Level of Service Catalogue(PDF, 5MB).pdf · 5.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.