2m RESUMPTION ZONE
STREET
VISITOR PARK
TIMBER PALING FENCE
LANE
PROPOSED PROPOSED
UNIT 3 UNIT 1
TIMBER TIMBER
PALING PALING
DRIVEWAY FENCE FENCE DRIVEWAY
RUBY
OPAL
TIMBER PALING FENCE
PROPOSED PROPOSED
2m RESUMPTION ZONE
UNIT 4 UNIT 2
SCHEDULE OF AREAS: LEGEND:
LANDSCAPE PLAN
SITE AREA 971 sq.m
CONCRETE
AREA OF RESUMPTION ZONE 40 sq.m
BUILT AREAS 396.24 sq.m / 40.81% of site
PAVING
DRIVEWAYS 97.30 sq.m / 10.02% of site
HARD LANDSCAPING: CONCRETE, PAVING & DECKS 158.93 sq.m / 16.37% of site
DECK
SOFT LANDSCAPING: LAWN & GARDENS 318.53 sq.m / 32.80% of site
Minimum area required = 204 sq.m
SOFT LANDSCAPE
: Proposed Drawing PROPOSED DRAWING
General Notes:
For Existing Lot at LANDSCAPE PLAN
These drawings have been prepared for Building Permit application only. It is the Builders/owners responsibility to
further interpret the design and drawings to detail the project for construction. Lot 616 Ruby St, Cooroy
The builder shall check and verify the location of all services and structure on site prior to construction. for R Kildey Scale 1:200 @ A3 Date 20/3/25
All levels, dimensions and roof pitches are to be checked and verified by the builder on site prior to the
commencement of any work, making of shop drawings or fabrication of components. During construction the Builder Sheet: 1 of 1
building shall be maintained in a stable condition and no part shall be overstressed.
DO NOT SCALE OFF DRAWINGS. USE FIGURED DIMENSIONS. * IF IN DOUBT.......ASK THE BUILDER * Drawn A.D.S.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - AMENDED LANDSCAPE PLAN -20.3.25.pdfRelated documentApplication case desk ↗
About this file
- File size
- 445 KB (small file)
- File type
No other editions are linked here.