Approved Decision Notice - MCU24 0089 & OPW24 0099 [As Published] · MCU24/0089

of 14

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

 

Document Set ID: 23303042

2407-41532 SRA

Attachment 1—Referral agency conditions

 

(Under section 56(1)(b)(1) of the Planning Act 2016 the following conditions must be attached to any development
approval relating to this application) (Copies of the documents referenced below are found at Attachment 5)

 

No. | Conditions Condition timing

 

Operational work — prescribed tidal works (jetty)

 

Schedule 10, Part 17, Division 3, Subdivision 1, Table 1 (Planning Regulation 2017) — Tidal works or
work in a coastal management district—The chief executive administering the Planning Act 2016
nominates the Director-General of the Department of Environment, Science and Innovation to be the
enforcement authority for the development to which this development approval relates for the
administration and enforcement of any matter relating to the following conditions:

 

 

 

1. The development must be carried out generally in accordance with For the duration of
the following plan: works and to be
* Site Plan, prepared by Kunkel Building Design, dated maintained
27/08/24, sheet number 01 and revision F.
2. The works to which this approval relates are to be for a private At all times
purpose only.
3. Any operator and contractor involved in the works to which this During construction

approval relates must:

(a) be provided a copy of these referral agency conditions

(b) install all measures, plant and equipment necessary to
ensure compliance with the conditions of this approval

(c) maintain such measures, plant and equipment in a proper
and efficient condition; and

(d) operate such measures, plant and equipment in a proper
and efficient manner.

 

4. For the jetty works only use materials which are free from During construction
contaminants as defined under section 11 of the Environmental
Protection Act 1994.

 

5. Should the works become damaged as a result of erosion, flooding At all times
or storm tide inundation, the registered landowner/s of the subject
land shall be responsible for the removal of alll debris at their own
expense.

Schedule 10, Part 17, Division 3, Subdivision 2, Table 1 (Planning Regulation 2017) — Tidal works or
work in a coastal management district—The chief executive administering the Planning Act 2016
nominates the Director-General of the Department of Transport and Main Roads to be the enforcement
authority for the development to which this development approval relates for the administration and
enforcement of any matter relating to the following conditions:

6. The development must be carried out generally in accordance with At all times

the following plan:

* Site Plan, prepared by Kunkel Building Design. dated
27/08/24, sheet number 01 and revision F.

 

 

 

 

 

7. (8) Light/mark all vessels, structures, plant and equipment For the duration of
associated with: works and for operation
i. the works, in accordance with the following specifications: to be maintained at all
® any anchors deployed must be marked with yellow times

buoys and fitted with FL yellow lights fitted

 

 

 

 

 

State Assessment and Referral Agency Page 3 of 7

Version: 2, Version Date: 16/10/2024

 

Page 8 of 14

Used in these records

About this file

File size
885 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Approved Decision Notice - MCU24 0089 & OPW24 0099 [As Published].pdf · 885 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.