Council archive · source document
LATE RFI - App B - Landscaping Plans 19.10.2026 · MCU17/0024.04
Plans and drawings: the text below has words only, no drawings.
DESIGN APPROACH -
THE PROPOSED DESIGN APPROACH FOR THIS
PROJECT IS ONE OF PRACTICAL DESIGN SOLUTIONS
FOR A SUSTAINABLE AND AESTHETIC OUTCOME.
THIS WILL BE ACHIEVED VIA THE FOLLOWING NOTES
& INFORMATION.
SELECT TREES, SHRUBS AND GROUND-
COVER PLANTINGS TO PROPOSED BUILDING &
SURROUNDING AREAS TO COMPLEMENT THE
ARCHITECTURE & ASSIST IN CREATING A
SUSTAINABLE, SAFE & FUNCTIONAL ENVIRONMENT
WITHIN THE DEVELOPMENT.
THE PLANTING DESIGN WILL INCORPORATE -
1. PLANTINGS TO BE COASTAL NATIVE
ENDEMIC SPECIES TO COMPLIMENT THE EXISTING
ENVIRONMENT & LOCAL COUNCILS
LANDSCAPE DESIGN POLICY.
2. SURVEILLANCE & SIGHTLINE CRITERIA FOR SAFE IMAGES BY ANDREW BOCK ARCHITECTURE
& EASY TRAVEL FOR RESIDENTS THROUGH
THE DEVELOPMENT SITE.
3. PLANTING SPECIES WILL BE CHOSEN FOR THEIR
AESTHETIC VALUE, SUSTAINABILITY DURING WATER
CONSCIOUS PERIODS AND LOW MAINTENANCE
QUALITIES.
EXISTING SURF CLUB
EXISTING
HARDSTAND AREA
ex ee
tg
tr
ex nity r
U ate
W
tg
ex ee
tg
tr
Existing
carparking
leas
lease line
e lin
e
up
lk
wa
ale ard IRB
sw bo T
SW tg GP
/ PPE
Ex ver IRB
o JS IRB
rd
FD
ua
e
ols/ P
eg
r
RL 12.000
sto
Lif
Surf Lifesaving
el/ to
Bo
ard
JS
ge/ fu
sto
rag
stora
SSV
e/
SSV
fue
Pu nd s
Board
l/ t
a
blic eat
tract
oo
ls/
sh ing
SUBJECT
RL
ow
PF
D/
ers
12
PP
.70
SITE
E
0
rhang
swmh roof ove
T
concrete
GP
ramp up
EXIST
NTS IN G BE
isti ay
ACH
Ex adw
ng
ACCE
ro
SHEET LEGEND SS DR
IVEW
AY
SHEET 01 - SITE LAYOUT PLAN
SHEET 02 - HARDSCAPE PLAN
SHEET 03 - PLANTING PLAN
SHEET 04 - TREE RETENTION / REMOVAL PLAN
SHEET 05 - DETAILS PLAN
SHEET 06 - PLANT SCHEDULE AND SPECIFICATION PROPOSED NEW SUNSHINE BEACH SURF CLUB RESCUE FACILITY
SHEET 07 - REVEGETATION / REHABILITATION PLAN
1: 300 @ A3
scale in metres FOR COUNCIL APPROVAL
SHEET 01 - SITE LAYOUT PLAN - MCU / OPW LANDSCAPE WORKS 0 1 5 10
AMENDMENTS PROJECT
PROPOSED NEW EMERGENCY north
element design
issue date description
A
B
16.10.26 ISSUE FOR COUNCIL APPROVAL
19.10.26 ISSUE FOR COUNCIL APPROVAL
RESCUE FACILITY,
landscape architecture SUNSHINE BEACH SURF CLUB,
MASTER PLANNING SUBDIVISIONS
COMMERCIAL DEVELOPMENTS RESORTS SUNSHINE BEACH Date OCTOBER 2026
PARKLANDS REVEGETATION MULTI-UNITS
Scale 1: 300 @ A3
151 Brisbane Rd. Mooloolaba CLIENT SBSLSC
Phone 07 5444 6155 Design JRV Drawn JRV
PO Box 1546, Buderim QLD 4556
Copyright in the whole and every part of this document belongs to
ELEMENT DESIGN QLD PTY LTD and may not be used, sold, [email protected]
DWG
TITLE SITE LOCATION PLAN Sheet 01 OF 07
transferred, copied or reproduced in whole or in part in any manner or TM issue
form or in or on any media to any person without the prior written
consent of ELEMENT DESIGN QLD PTY LTD. ED 26141 OPW - 01 B
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 6 pages
Page 2
EXISTING CLUB BUILDING
14
Existing .0
EXISTING LEASE LINE
carparking
leas
EXISTING
lease line
e
RETAINING
line
EXISTING TIMBER
up
BOARDWALK
lk
OVER GPT
wa
w ale rd
oa T IRB
15.0
s b
SW tg r GP
PE
APPROX LOCATION OF
x
E ve IRB
1.5m DIA SW PIPE IRB
FD/ P
(2.2m BELOW) o JS
13.0
rd
ua
re
ols/ P
g
RL 12.000
sto
14.0
e
Lif
APPROX LOCATION OF Surf Lifesaving
el/ to
1.8m DIA SW PIPE
Bo
(2.2m BELOW)
ard
JS
ge/ fu
sto
BUILDING RETAINING
WALL
rag
stora
13.0
SSV
e/
SSV
fue
Pu d s
Board
l/ t
an
blic eat tract
oo
ls/
PROPOSED NEW PUBLIC
SHOWER AND SEATING
sh ing
RL
ow
PF
IN THE SAME LOCATION
D/
ers ROOF OVERHANG
12
AS THE EXISTING SHOWER
P
.70
(TO FUTURE ARCHITECTS
PE
0
DETAIL)
e rhang
swmh roof ov
.0
12
NEW CONCRETE RAMP
12.0
T
EXISTING RAISED GP concrete 6m LENGTH OF POST & RAIL
GPT TO BE RETAINED ramp up FENCE TO BE RETAINED
SELECT HARDWOOD
EXISTING BEACH BOLLARDS
ACCESS DRIVEWAY
TO BE RETAINED
13
11.0
.0
ix sti way
ng
E ad
ro
SELECT HARDWOOD BOLLARDS APPROX LOCATION OF 1.8m DIA
1: 100 @ A3 SW PIPE (2.2m BELOW)
SHEET 02 - HARDSCAPE PLAN - OPERATIONAL WORKS scale in metres FOR COUNCIL APPROVAL
0 1 5
AMENDMENTS
PLANTING AREA PROPOSED NEW EMERGENCY north
element design
issue date description PROJECT
A
B
16.10.26 ISSUE FOR COUNCIL APPROVAL
19.10.26 ISSUE FOR COUNCIL APPROVAL
RESCUE FACILITY,
LEGEND
landscape architecture SUNSHINE BEACH SURF CLUB,
MASTER PLANNING SUBDIVISIONS
COMMERCIAL DEVELOPMENTS RESORTS SUNSHINE BEACH Date OCTOBER 2026
PARKLANDS REVEGETATION MULTI-UNITS
Scale 1: 100 @ A3
151 Brisbane Rd. Mooloolaba CLIENT SBSLSC
Phone 07 5444 6155 Design JRV Drawn JRV
PO Box 1546, Buderim QLD 4556
Copyright in the whole and every part of this document belongs to
ELEMENT DESIGN QLD PTY LTD and may not be used, sold, [email protected]
DWG
TITLE HARDSCAPE PLAN Sheet 02 OF 07
transferred, copied or reproduced in whole or in part in any manner or TM issue
form or in or on any media to any person without the prior written
consent of ELEMENT DESIGN QLD PTY LTD. ED 26141 OPW - 02 B
Page 3
Concrete Path Entertainment Area
Existing
carparking
leas
ALE cor
lease line
WES fru
e lin
ALE cor
WES fru
REHABILITATION
e
extg Lomandra batter OFFSET AREA
WES fru (approx 130m2)
ELA aus
up
1 ELA aus lk ALE cor
wa
ALE cor
WES fru
ale ardT IRB
sw b o
tg r GP
ALE cor
SW
/ PPE
x
E ve IRB
o SCA tac
JS IRB
ard
D
WES fru
s/ PF
WES fru
CUP ana
u
re
eg
RL 12.000
sto
Lif
l
l/ too
SCA tac
Surf Lifesaving ALE cor
Bo
AUS dul
e/ fue
SCA tac
ard
WES fru
CUP ana
ALE cor JS
1 CUP ana
sto
g
rag
stora
SSV
e/
LOM lon
SSV
fue
ALE cor
Pu d s
WES fru ALE cor
Board
l/
an
blic eat
tract
too
PLANTING LEGEND CAR gla
ALE cor
ls/
sh ing
WES fru
RL
ow
PF
SMALL TREES
LOM lon
ALE cor
ALE cor
D/
ers
1 2.7
LOM lon
PP
00
WES fru
E
ALE cor
MAC tan
erhang
roof ov
BAN int WES fru
WES fru
swmh WES fru
REHABILITATION
WES fru
OFFSET AREA
BAN BC SCA tac (approx 130m2)
SCA tac
SHRUBS
T
concrete
GP
CAR gla
SCA tac
PAN tec
SCA tac
BAN int
ramp up
CAR gla
WES fru DIA cae
CAR gla
SCA tac SCA tac
1 CUP ana
DIA cae
GROUND
COVERS
SCA tac
LOM lon
DIA cae 1 BAN int
CAR gla
ay
refer to Sheet 07 for Plant Schedule
w
and Specification
ad ro
1: 100 @ A3
scale in metres
SHEET 03 - PLANTING PLAN - OPERATIONAL WORKS 0 1 5 FOR COUNCIL APPROVAL
AMENDMENTS
TREE PLANTING PROPOSED NEW EMERGENCY north
element design
issue date description PROJECT
A
B
16.10.26 ISSUE FOR COUNCIL APPROVAL
19.10.26 ISSUE FOR COUNCIL APPROVAL
RESCUE FACILITY,
LEGEND
landscape architecture SUNSHINE BEACH SURF CLUB,
TREES TO BE MASTER PLANNING SUBDIVISIONS
SUNSHINE BEACH
COMMERCIAL DEVELOPMENTS RESORTS Date OCTOBER 2026
RETAINED PARKLANDS REVEGETATION MULTI-UNITS
Scale 1: 100 @ A3
REHABILITATION 151 Brisbane Rd. Mooloolaba CLIENT SBSLSC
Phone 07 5444 6155 Design JRV Drawn JRV
OFFSET AREA PO Box 1546, Buderim QLD 4556
Copyright in the whole and every part of this document belongs to
ELEMENT DESIGN QLD PTY LTD and may not be used, sold,
(approx 130m2) [email protected]
DWG
TITLE PLANTING PLAN Sheet 03 OF 07
transferred, copied or reproduced in whole or in part in any manner or TM issue
form or in or on any media to any person without the prior written
consent of ELEMENT DESIGN QLD PTY LTD. ED 26141 OPW - 03 B
Page 4
Existing Path
carparking
leas
lease line
e lin
e
up
lk
le rd wa
a oa T IRB
sw b
SW tg r GP
PE
x
E ve IRB
IRB
FD/ P
o JS
rd
ua
re
ols/ P
g
RL 12.000
sto
e
Lif
Surf Lifesaving
el/ to
Bo
ard
JS
ge/ fu
sto
r
stora
ag
SSV
e
/ fu
SSV REVEGETATION
Pu s
el/
Board
an
REHABILITATION AREA
blic eat
tract
oot
(HATCHED) 130m2
d
ls/
sh ing
RL
ow
PF
D/
ers
1 2.7
P
PE
00
erhang
ION
roof ov
EXTENT OF REVEGETAT
swmh
REHABILITATION AREA
T
concrete
GP
TREES TO BE RETAINED
ramp up
Alectryon coriaceus
Banksia Spp
Macaranga tanarius
Pandanus tectorius
TREES TO BE REMOVED
Alectryon coriaceus
Banksia Spp
ng y
i a
Macaranga tanarius
Ex adw
Pandanus tectorius
s t i
ro
1: 100 @ A3
SHEET 04 - TREE RETENTION / REMOVAL PLAN - OPERATIONAL WORKS scale in metres
FOR COUNCIL APPROVAL
0 1 5
AMENDMENTS
PLANTING AREA PROPOSED NEW EMERGENCY north
element design
issue date description PROJECT
A
B
16.10.26 ISSUE FOR COUNCIL APPROVAL
19.10.26 ISSUE FOR COUNCIL APPROVAL
RESCUE FACILITY,
LEGEND
landscape architecture SUNSHINE BEACH SURF CLUB,
MASTER PLANNING SUBDIVISIONS
COMMERCIAL DEVELOPMENTS RESORTS SUNSHINE BEACH Date OCTOBER 2026
PARKLANDS REVEGETATION MULTI-UNITS
Scale 1: 100 @ A3
REHABILITATION 151 Brisbane Rd. Mooloolaba CLIENT SBSLSC
Phone 07 5444 6155 Design JRV Drawn JRV
OFFSET AREA PO Box 1546, Buderim QLD 4556
Copyright in the whole and every part of this document belongs to
ELEMENT DESIGN QLD PTY LTD and may not be used, sold,
(approx 130m2) [email protected]
DWG
TITLE TREE RETENTION / REMOVAL Sheet 04 OF 07
transferred, copied or reproduced in whole or in part in any manner or TM issue
form or in or on any media to any person without the prior written
consent of ELEMENT DESIGN QLD PTY LTD. ED 26141 OPW - 04 B
Page 5
MIN 1500mm
DIAL BEFORE
c ed
c ed
YOU DIG
c ed WWW. 1100.com.au
SHEET 05 - DETAILS PLAN - OPERATIONAL WORKS FOR COUNCIL APPROVAL
AMENDMENTS
PROPOSED NEW EMERGENCY north
element design
issue date description PROJECT
A
B
16.10.26 ISSUE FOR COUNCIL APPROVAL
19.10.26 ISSUE FOR COUNCIL APPROVAL
RESCUE FACILITY,
landscape architecture SUNSHINE BEACH SURF CLUB,
MASTER PLANNING SUBDIVISIONS
COMMERCIAL DEVELOPMENTS RESORTS SUNSHINE BEACH Date OCTOBER 2026
PARKLANDS REVEGETATION MULTI-UNITS
Scale 1: 200 @ A3
151 Brisbane Rd. Mooloolaba CLIENT SBSLSC
Phone 07 5444 6155 Design JRV Drawn JRV
PO Box 1546, Buderim QLD 4556
Copyright in the whole and every part of this document belongs to
ELEMENT DESIGN QLD PTY LTD and may not be used, sold, [email protected]
DWG
TITLE DETAILS PLAN Sheet 05 OF 07
transferred, copied or reproduced in whole or in part in any manner or TM issue
form or in or on any media to any person without the prior written
consent of ELEMENT DESIGN QLD PTY LTD. ED 26141 OPW - 05 B
Page 6
SPECIFICATION FOR LANDSCAPE WORKS element design TM
PLANT SCHEDULE element design
(GARDENS) SCOPE PERFORMANCE
TREE SPECIES GENERAL CONDITIONS ALL LANDSCAPE CONSTRUCTION WORK IS TO BE CARRIED OUT IN COMPLIANCE WITH RELEVANT COUNCIL APPROVALS AND TO
INDUSTRY BEST PRACTICE. ANY CHANGES FROM DESIGN DOCUMENTATION MUST BE APPROVED BY PROJECT LANDSCAPE ARCHITECT
PRIOR TO CONSTRUCTION ON SITE.
Code Botanical Name Common Name Size Quantity EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE UNDERTAKEN WHERE NECESSARY TO ENSURE NO DETRIMENTAL EFFECT
TO DOWNSTREAM WATERWAYS OR NEIGHBOURING SITES.
ALE cor Alectryon coriaceus Beach Bird's Eye 45 ltr 7 SITE PREPARATION / PRIOR TO COMMENCEMENT OF WORKS, EXISTING SITE CONDITION IS TO BE DOCUMENTED BY CONTRACTOR. ALL EXISTING AND
PROPOSED SERVICES ON SITE ARE TO BE LOCATED AND CLEARLY IDENTIFIED. ALL BUILDING RUBBISH AND DELETERIOUS MATERIALS
* BAN int Banksia integrifolia Coastal Banksia 100 ltr 1 EARTHWORKS ARE TO BE REMOVED FROM SITE TO APPROVED WASTE LOCATION.
LANDSCAPE AREAS SHALL BE SCARIFIED TO A DEPTH OF 150mm TO PROMOTE GOOD GROWTH FOR TURF AND PLANTING.
* CUP ana
ELA aus
Cupaniopsis anacardioides
Elaeodendron australe
Tuckeroo
Red Olive Plum
100 ltr
45 ltr
2
1
ALL MATERIALS TO BE USED IN THE CONSTRUCTION OF THE DESIGNED LANDSCAPE ARE TO BE OF AND INDUSTRY STANDARD QUALITY
MATERIALS / SERVICES
MAC tan Macaranga tanarius Macaranga 45 ltr 4 AND FROM A SUSTAINABLE SOURCE WHERE POSSIBLE. NO MATERIALS USED ON SITE SHALL BE TOXIC TO HUMANS, ANIMALS OR
PLANTS.
ALL SELECT ITEM MATERIALS ARE TO BE APPROVED BY CLIENT PRIOR TO CONSTRUCTION ON SITE.
* PROVIDE AS 2303:2018 CERTIFICATION FOR SELECT TREES
SHRUB SPECIES
PROVIDE SERVICE CONDUITS TO ALL GARDEN BEDS FOR IRRIGATION AND DRAINAGE PURPOSE. PROVIDE CONDUITS FOR LIGHTING
WHERE REQUIRED.
ENSURE ADEQUATE DRAINAGE TO PLANTING AREAS FOR SPECIFIC SITE SOIL CONDITIONS VIA THE USE OF SLOTTED AGRICULTURAL
DRAIN (SELECT TYPE FOR APPLICATION), OVERLAND FLOW PATHS WITHIN GARDENS (SELECT RIVER GRAVEL ON GEOFABRIC
MATERIAL) AND SURFACE STORMWATER PITS (LOCATED IN GENERALLY CONCEALED POSITIONS).
Code Botanical Name Common Name Size Quantity
PROPOSED HARDSCAPE ITEMS ARE TO BE CONSTRUCTED TO AUSTRALIAN STANDARDS AND RELEVANT COUNCIL CODES BY A
HARDSCAPE SUITABLY LICENCED CONTRACTOR. WORKPLACE HEALTH AND SAFETY REGULATIONS MUST BE IMPLEMENTED DURING CONSTRUCTION
LOM lon Lomandra longifolia Mat Rush 140 pot 55 PHASE.
SCA tac Scaevola taccada Beach Naupaka 200 pot 9 PLANT MANAGEMENT ALL PLANT SPECIES ARE DETAILED WITHIN THE PLANT SCHEDULE . NO SUBSTITUTIONS ALLOWED WITHOUT PRIOR ACCEPTANCE BY
AS 2303-2015 TREE STOCK COUNCIL AND PROJECT LANDSCAPE ARCHITECT.
WES fru Westringia fruiticosa Coastal Rosemary 200 pot 16 THE CONTRACTOR SHALL OBTAIN ALL PLANTS AS SPECIFIED FROM AN ACCREDITED NURSERY OR OTHER APPROVED SOURCE. PLANTS
FOR LANDSCAPE USE SHALL BE PRE-WATERED PRIOR TO ARRIVING ON SITE.
PLANTS SHALL BE HEALTHY, HARDY AND OF GOOD FORM. THE ROOT SYSTEM OF EACH PLANT SHOULD NOT BE ROOTBOUND AND BE
GROUNDCOVER SPECIES CONDUCIVE TO SUCCESSFUL TRANSPLANTATION. ALL PLANTS TO BE PEST AND DISEASE FREE WITH CONTAINERS FREE FROM WEEDS.
STREET TREE SPECIES ARE TO COMPLY WITH NATSPEC AND RELEVANT COUNCIL CONDITIONS.
Code Botanical Name Common Name Size Quantity STAKE TREES WITH A MIN. OF TWO 50x50 HWD STAKES AND HESSION STRAP OR SIMILAR AS NOT TO DAMAGE TREE. FIGURE '8' DETAIL
RECOMMENDED.
NO TYPE OF STAKE TO BE PLACED THROUGH ROOTBALL OF PLANT AT ANY TIME.
BAN BC Banksia spinulosa ' Birthday Candles' Dwarf Banksia EACH PLANT TO HAVE ADDED WATER CRYSTALS TO PLANTING HOLE AND WATERED IN AFTER PLANTING AS REQUIRED.
100 ltr 3 PLANT STOCK MAY BE REJECTED IF NOT CONFORMING WITH ABOVE SPECIFICATIONS.
CAR gla Carpobrotus glaucescens Pig’s Face 140 pot 23
DIA cae Dianella caerulea Flax Lilly 140 pot 15 SOFTSCAPE SETOUT OF ALL SOFTSCAPE AREAS TO BE IN ACCORDANCE WITH APPROVED PLANS. PLANTING AREAS TO BE MOUNDED TO ACHIEVE
ADEQUATE DRAINAGE AND AESTHETIC PRESENTATION.
NOTE : ALL PLANTS TO HAVE NATIVE SLOW RELEASE FERTILISER AND WATER CRYSTALS AS 4419-2003, SOILS FOR SOIL: A GOOD QUALITY FRIABLE, MODERATELY DRAINING, ORGANIC ENRICHED LANDSCAPING SOIL MIX SHALL BE IMPORTED FROM AN
LANDSCAPING AND APPROVED SOURCE. THE SOIL SHOULD NOT CONTAIN ANY CLAY AND BE FREE FROM CONTAMINANTS SUCH AS WEEDS, STICKS AND
ROCKS. IMPLEMENTATION WITHIN GARDEN AREAS TO A MIN. OF 300mm DEPTH.
GARDEN USE ORGANIC MULCH: HOOP PINE MULCH IN ITS VARIETY OF FORMS IS TO BE SUPPLIED AND INSTALLED TO A MIN. DEPTH OF 100mm. MULCH
IS TO BE FREE OF FOREIGN MATTER INCLUDING WEEDS, SOIL, STICKS AND ROCKS. AVOID PLACEMENT OF MULCH AGAINST STEM OR
AS 4454-2003, COMPOSTS, TRUNK OF PLANTS. GRADE MULCH TO BE SELF RETAINED WITHIN GARDEN EDGING.
SOIL CONDITIONERS AND GRAVEL MULCH: SELECTED WASHED RIVER MULCH GRADED IN SIZE AND COLOUR. USE IN AREAS AS SPECIFIED ON PLANS. TO BE USED
MULCHES TO SEPARATE ORGANIC MULCH FROM THE WALLS OF BUILDINGS, ADJACENT PATHS AND TOO FACILITATE DRAINAGE WITHIN GARDEN
BEDS. MIN. DEPTH TO BE TWICE THE DIAMETER OF THE LARGEST PEBBLE.
TURF SHALL CONSIST OF A DENSE, WELL ROOTED, VIGOROUS GRASS GROWTH WITH MIN. 25mm OF TOPSOIL. TURF IS TO BE
TURF DELIVERED TO SITE WITHIN 24 HOURS OF BEING CUT. TURF SHOULD BE FREE FROM DELETERIOUS MATERIAL INCLUDING WEEDS,
SEEDS OR ROOTS INCLUDING NUT GRASS AND OXALIS. TURF SHALL BE SUPPLIED IN UNIFORM SIZE IN UNBROKEN CONDITION.
MOISTURE LEVEL OF TURF TO REMAIN CONSISTENT DURING LAYING. TURF TO BE LAID ALONG CONTOUR AND PINNED IF GREATER
THAN 1:4 SLOPE.
PREPARE SUBGRADE TO A LEVEL BASE WITH AN APPROVED TOPSOIL AND SPREAD UNDER TURF FERTILIZER AT RECOMMENDED RATE.
TURF TO FINISH LEVEL WITH PATHS, EDGES AND KERBS AFTER ROLLING AND SETTLEMENT.
IRRIGATION TO BE INSTALLED BY A SUITABLY QUALIFIED CONTRACTOR AND BE INSTALLED IN ACCORDANCE WITH ALL COUNCIL WATER
IRRIGATION REGULATIONS.
(establishmant only) THE MOST WATER EFFICIENT METHOD OF IRRIGATION IS TO BE USED, CONNECTED TO TANK SUPPLY WHERE POSSIBLE.
CONDUITS TO BE LAID TO ALL GARDEN AREAS TO PROVIDE A REGULATED COVERAGE. FLUSH AND PRESSURE TEST PRIOR TO
COMMISSIONING.
PROVIDE AS CONSTRUCTED DRAWINGS CLEARLY SHOWING LOCATION OF ALL IRRIGATION COMPONENTRY.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CARE AND MAINTENANCE OF ALL LANDSCAPE WORKS FOR A PERIOD OF 13
LANDSCAPE WEEKS AFTER COMPLETION.
ESTABLISHMENT PERIOD MAINTENANCE IS TO INCLUDE MOWING OF TURF, REMOVAL AND SPRAYING OF WEEDS, PRUNING AND TRIMMING OF SHRUBS WHERE
REQUIRED, REPLACEMENT OF DEAD OR DISEASED PLANT STOCK AND CORRECT WORKING OF IRRIGATION SYSTEM.
WATER IS TO BE PROVIDED TO ALL SOFT LANDSCAPING AT A REQUIRED RATE DURING THE ESTABLISHMENT PERIOD TO ENSURE
HEALTHY AND VIGOROUS GROWTH.
SHEET 06 - PLANT LISTS & SPECIFICATION PLAN - OPW FOR COUNCIL APPROVAL
AMENDMENTS
PROPOSED NEW EMERGENCY north
element design
issue date description PROJECT
CONTRACTOR TO : DIAL BEFORE
A 16.10.26 ISSUE FOR COUNCIL APPROVAL
· CONFIRM LOCATION OF RESCUE FACILITY,
B 19.10.26 ISSUE FOR COUNCIL APPROVAL
YOU DIG
LEGEND
BOUNDARIES & SERVICES landscape architecture SUNSHINE BEACH SURF CLUB,
PRIOR TO COMMENCING
LANDSCAPE WORKS WWW. 1100.com.au MASTER PLANNING SUBDIVISIONS
SUNSHINE BEACH Date OCTOBER 2026
COMMERCIAL DEVELOPMENTS RESORTS
· ENSURE ALL FALLS TO PARKLANDS REVEGETATION MULTI-UNITS
Scale 1: 200 @ A3
STORMWATER PITS ARE TO 151 Brisbane Rd. Mooloolaba CLIENT SBSLSC
INDUSTRY STANDARDS Phone 07 5444 6155 Design JRV Drawn JRV
· CHECK ALL LEVELS PRIOR TO PO Box 1546, Buderim QLD 4556
Copyright in the whole and every part of this document belongs to
ELEMENT DESIGN QLD PTY LTD and may not be used, sold,
CONSTRUCTION [email protected]
DWG
TITLE PLANT LIST & SPEC. PLAN Sheet 06 OF 07
transferred, copied or reproduced in whole or in part in any manner or TM issue
form or in or on any media to any person without the prior written
consent of ELEMENT DESIGN QLD PTY LTD. ED 26141 OPW - 06 B
Page 7
PLANT SCHEDULE element design
(REVEGETATION) approx 130m2
TREE SPECIES
Code Botanical Name Common Name Size Quantity
ALE cor Alectryon coriaceus Beach Bird's Eye TUBE 3
BAN int Banksia integrifolia Coastal Banksia TUBE 3
MAC tan Macaranga tanarius Macaranga TUBE 3
PAN Tec Pandanus tectorius Coastal Pandanus 300 pot 3
WHERE PRACTICAL TRANSPLANT EXISTING PANDANUS
SHRUB SPECIES NOTE:NATIVE SLOW RELEASE FERT. AND WATER CRYSTALS TO
Code Botanical Name Common Name Size Quantity
BE ADDED TO ALL PLANTING HOLES TO MANUFACTURERS
SPECIFICATION.
LOM lon Lomandra longifolia Mat Rush TUBE 50
SCA tac Scaevola taccada Beach Naupaka TUBE 20
WEED SPECIFICATION
GROUNDCOVER SPECIES
Code Botanical Name Common Name Size Quantity
WEED SPECIES IDENTIFICATION.
DIA cae Dianella caerulea Flax Lilly TUBE 20 NON-LOCAL NATIVE FLORA WEED SPECIES AND EXOTIC FLORA ARE TO BE IDENTIFIED BY A SUITABLY QUALIFIED
NOTE : ALL PLANTS TO HAVE NATIVE SLOW RELEASE FERTILISER AND WATER CRYSTALS CONSULTANT.
ATTENTION IS REQUIRED FOR THE DETECTION OF -
* WEED GRASSES, ENVIRONMENTAL WEEDS AND SPECIES WITH RESTRICTIONS - SCRC.
REHABILITATION SCHEDULE * DECLARED PLANTS (LAND PROTECTION (PEST AND STOCK ROUTE MANAGEMENT) ACT 2002 (QLD))
WEED ERADICATION, ENDEMIC REGENERATION & REVEGETATION *MAROCHY PEST MANAGEMENT PLAN 2006-2010 PEST SPECIES OF SIGNIFICANCE IN GROUP 1, GROUP 2 AND
GROUP 6.
PROTECTIVE MEASURES WEED CONTROL METHODS.
* PROTECTIVE MEASURES SHOULD BE TAKEN TO ENSURE THE INTEGRITY OF EXISTING VEGETATION, RETAIN
SELECT VEGETATION WHERE POSSIBLE AND PROVIDE A STABLE ENVIRONMENT FOR NEWLY PLANTED TREATMENT OF WEEDS IS TO BE UNDERTAKEN USING BEST HORTICULTURAL PRACTICES.
VEGETATION. WEED TREATMENT METHOD MUST PROVIDE PROTECTION FOR EXISTING NATIVE VEGETATION AND REQUIRED
REHABILITATION VEGETATION. AVOID POSSIBLE SOIL DISTURBANCE WHICH INCREASES RISK OF EROSION AND
EROSION CONTROL
ADDITIONAL WEED INFESTATION.
EROSION CONTROL METHODS ARE TO BE IN GENERAL ACCORDANCE WITH THE SCRC EROSION AND
USE ONLY PESTICIDES APPROVED FOR TARGET USE. CHEMICAL MANUFACTURERS INSTRUCTIONS FOR USE OF
SEDIMENT CONTROL MANUAL (Version 1.2)
PESTICIDE ARE TO BE FOLLOWED.
METHODS WILL INCLUDE SEDIMENT FENCING TO BE INSTALLED GENERALLY IN LOCATIONS TO PREVENT
ALL NOXIOUS WEED SEED OR PROPAGATIVE MATERIAL SHOULD BE REMOVED FROM SITE AND DISPOSED OF AT A
SILTING OF PATHS & WATERWAYS AS REQUIRED.
APPROVED COUNCIL WASTE STATION.
BLANKET MULCHING THE REVEGETATION AREA TO REQUIRED DEPTH (100mm)
WEEDS ARE TO BE CONTROLLED DURING THE CONSTRUCTION AND 'ON MAINTENANCE' PHASE OF WORKS. 2
FOLLOW EARTHWORKS AS SOON AS PRACTICAL. REVEGETATION AREA = 130 m Approx.
INDIGENOUS REVEGETATION MULCHING IS TO FORM PART OF THE WEED MANAGEMENT STRATEGY. MULCH DEPTH TO BE APPROX. 100 - 150mm
* ALL NATURALLY OCCURING LOCAL PLANT SPECIES TO BE PROMOTED IN CONJUNCTION WITH PROPOSED DEEP. MULCH TYPE TO BE FOREST MULCH OR CANE MULCH OR APPROVED SIMILAR. MULCH TO BE FREE FROM PLANTS REQUIRED (Tubestock)
REVEGETATION SPECIES. WEED MATERIAL AND FOREIGN DEBRIS. COUNCIL REFUSE MULCH IS NOT ACCEPTABLE. MULCH JUTE MATS TO BE
PLANT QUANTITY
* INDIGENOUS PLANT SPECIES TO BE LOCALLY SOURCED AND PLANTED IN ACCORDANCE WITH LOCAL USED IN LOW AREAS ADJACENT WATERWAYS WITH RISK OF WASH.
LANDCARE AND CATCHMENT CARE GROUP QUIDELINES. T TREES 6
TUBESTOCK PLANTING PROCEDURE FOR FURTHER WEED TREATMENT INFORMATION REFER TO:
QUEENSLAND DEPARTMENT OF NATURAL RESOURCES AND MINES - PEST FACTS. www.nrm.qld.gov.au/pests/
* WATER TUBE STOCK PRIOR TO PLANTING. ST 6
* SPREAD MULCH AWAY FROM PLANTING HOLE TO BE DUG.
SMALL TREES
Contractors for weed removal within the revegetation zone will have regard to
* EACH HOLE TO BE DUG AT LEAST TWICE THE SIZE OF THE POT TO BE PLANTED. the following, to minimise impacts upon existing vegetation and habitat : SH SHRUBS 70
* BREAK UP PREPARED HOLE WALLS IF GLAZED AND BASE IF COMPACTED. 1. The main principles of the Bradley Method of bush regeneration, ie not over-
* ADD WATER TO HOLE IF DRY. clearing (remove only targeted species), employment of minimal disturbance G GROUND COVERS 20
* REMOVE TUBE FROM CONTAINER AND PLACE IN HOLE, POTTING MIX TO BE AT GROUND LEVEL
techniques to avoid soil and surrounding vegetation disturbance, and
AFTER BACKFILLING - PRESS GENTLY TO SECURE.
* ADD ORGANIC MIX SOIL TO HOLE IF EXISTING GROUND IS DEFICIENT.
replacement of disturbed mulch / leaf-litter. NOTES:
* CREATE A SMALL DAM AROUND TUBE WITH EXCESS SOIL TO HOLD WATER. 2. Removal of fruiting / seeding parts of weeds carefully, to minimise spread of 150 dia PLANTING HOLE WITH IMPORTED SOIL
* REPLACE MUCH AROUND TUBE (OR MULCH MAT) MAINTAINING CLEAR ZONE 40mm FROM STEM. plant propagules. MIX, SLOW RELEASE NATIVE FERT AND WATER
*WATER IN NEW PLANTINGS - THREE TIMES IN FIRST WEEK / TWO TIMES IN SECOND WEEK / ONCE IN 3. Use of chemicals and sprays only during suitable weather conditions (ie not CRYSTALS PER TUBESTOCK.
THIRD WEEK. (ADJUST WATERING WITH RAINFALL) during wet or windy conditions), and only during appropriate seasons(ie 1 X PINK TREE GUARD + MULCH MAT PER PLANT .
* MONITOR PLANT PROGRESS AFTER THIRD WEEK - DEEP WATER AS REQUIRED. during active growing seasons of weeds – mainly spring and summer)
* USE WATER SAVING CRYSTALS OR SIMILAR IN DRY SOIL CONDITIONS. 4. Proximity to watercourses and swampy areas
SHEET 07 - REVEGETATION / REHABILITATION PLAN - OPW FOR COUNCIL APPROVAL
AMENDMENTS
PROPOSED NEW EMERGENCY north
element design
issue date description PROJECT
CONTRACTOR TO : DIAL BEFORE
A 16.10.26 ISSUE FOR COUNCIL APPROVAL
· CONFIRM LOCATION OF RESCUE FACILITY,
B 19.10.26 ISSUE FOR COUNCIL APPROVAL
YOU DIG
LEGEND
BOUNDARIES & SERVICES landscape architecture SUNSHINE BEACH SURF CLUB,
PRIOR TO COMMENCING
LANDSCAPE WORKS WWW. 1100.com.au MASTER PLANNING SUBDIVISIONS
SUNSHINE BEACH Date OCTOBER 2026
COMMERCIAL DEVELOPMENTS RESORTS
· ENSURE ALL FALLS TO PARKLANDS REVEGETATION MULTI-UNITS
Scale 1: 200 @ A3
STORMWATER PITS ARE TO 151 Brisbane Rd. Mooloolaba CLIENT SBSLSC
INDUSTRY STANDARDS Phone 07 5444 6155 Design JRV Drawn JRV
· CHECK ALL LEVELS PRIOR TO PO Box 1546, Buderim QLD 4556
Copyright in the whole and every part of this document belongs to
ELEMENT DESIGN QLD PTY LTD and may not be used, sold,
CONSTRUCTION [email protected]
DWG
TITLE REVEG / REHAB PLAN Sheet 07 OF 07
transferred, copied or reproduced in whole or in part in any manner or TM issue
form or in or on any media to any person without the prior written
consent of ELEMENT DESIGN QLD PTY LTD. ED 26141 OPW - 06 B
Used in these records
LATE RFI - App B - Landscaping Plans 19.10.2026.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.