70. An occupier of premises where there is air-conditioning equipment must not use or allow the
use of the equipment -
(a) before 7am or after 10pm on any day if it makes noise or causes noise to be made of
more than the higher of the following -
(i) 40 dB(A);
(ii) 3 dB(A) above the background noise level
(b) from 7am to 7pm on any day if it makes noise or causes noise to be made of more than
the lower of either of the following:
(i) 50 dB(A)
(ii) 5 dB(A) above the background noise level
(c) from 7pm to 10pm on any day if it makes noise or causes noise to be made of more
than 3 dB(A) above the background noise level.
Fire Management
71. A Fire Management Plan is required for the developed areas and a Bush Fire Management
Plan for the open space and bushland areas. These plans are to be prepared in consultation
with the Queensland Fire & Rescue Authority to the reasonable satisfaction of the Manager
- Land Use and will not rely on the removal of natural vegetation within OS3, OS4, OS5 or
OS7, which is otherwise to be protected. These plans are to be finalised prior to the issue
of a development approval for operational works. The applicant is required to implement any
recommendations of the Fire Management Plan and Bushfire Management Plan. Evidence
of any consultation undertaken with the Queensland Fire & Rescue Authority is to be
submitted with the plans.
Fire Management Plan (FMP)
72. The development shall be designed to incorporate all the required fire protection and control
measures and devices for the development. To this end, the FMP shall address, inter alia,
the following matters:
72.1. expected behaviour of fire;
72.2. fire hazard management actions and risk minimisation strategies;
72.3. building and road layout to reduce fire risk;
72.4. setback zones, proposed building construction methods, materials and design;
72.5. gutter treatment to avoid the collection of combustible material;
72.6. access for firefighters;
72.7. access between structures and vegetated areas;
72.8. fire suppression and evacuation procedures;
72.9. landscaping measures to reduce fire risk;
72.10. fuel load management and hazard reduction within landscaped areas;
72.11. required infrastructure – vehicle access tracks, firebreaks, hydrants, etc;
72.12. maintenance requirements for the above infrastructure;
72.13. how fires will be prevented from crossing from development precincts into the adjacent
bushland and open space areas;
72.14. coordination with other relevant organisations and agencies;
72.15. owners and operators training and responsibilities;
72.16. specific implementation procedures and responsibilities.
73. The applicant, future owners and tenants will implement this Plan.
Page 13 of 40
Document Set ID: 24254301
Version: 4, Version Date: 29/10/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.