Original source · versioned page text
20158 Landscape OPW Package [E]
Attached to the e-mail Operational Works Application OPW21/0032 - Cover Letter - DA Form 1 - Landscaping Plans - 71 Hastings Street Noosa Heads QLD 4567.
DRAWING SCHEDULE
20158 CD-000 COVER SHEET
20158 CD-001 LANDSCAPE SPECIFICATION NOTES
MAIN BEACH 20158 CD-300
20158 CD-301
MATERIALS SCHEDULE
SURFACE FINISHES - SHEET 1
20158 CD-302 SURFACE FINISHES - SHEET 2
20158 CD-400 LANDSCAPE PLANTING SCHEDULE
20158 CD-401 LANDSCAPE PLAN - SHEET 1
20158 CD-402 LANDSCAPE PLAN - SHEET 2
20158 CD-900 LANDSCAPE DETAILS
REV DESCRIPTION DRN DATE
A MCU DA Issue MS 25.02.20
B MCU DA Issue MS 02.03.20
C MCU DA Issue MS 06.03.20
A B 14.04.20
D Client Revisions MS
EXTENT OF WORKS E MCU DA
Information Response
MS 05.08.20
F
K GIA Issue MS 07.04.21
C C
UG
/
/
UG
/
/
UG
/
/
UG
/
UG
UG
UG
AD
UG
RO
UG
UG
/
D
RK
UG
/
PA
UG
D
UG
UG
UG
UG
UG
UG
SE
SE
SE
SE EXTENT OF WORKS
UG
SE
SE
T T T SE T SE T T T T T T T T T T
SE
SE T T T T T
SE
SE
UG
SE
SE
SE
SE
T
SE
T
HASTINGS STREET
Revision Date Amendment Drawn Checked
APPROVAL ONLY
COVER SHEET NOT FOR CONSTRUCTION
A
B
C
20.08.2020
12.11.2020
12.02.2021
For Tender
Revised - For Tender
For OPW Approval
AK
AK
XL
CS
CS
CS
CD-000 scale: 1:200@A1; 1:400@A3 D 27.04.2021 For Council Approval XL CS
NETANYA RESORT REFURBISHMENT
JOB NUMBER:20158 CLIENT NAME: NETANYA
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 8 pages
Page 2
LANDSCAPE NOTES
EXTENT OF WORKS
Ensure sufficient supply of each species shown on the drawings is available to achieve the required layout and densities, and in - Water in well and roll after laying to remove undulations - ensure all joins are gap-free. Top-dress any gaps or
Contractor shall allow to carry out items of landscaping as detailed on the Landscape Plans listed on 20158 Cover
the event of supply for replacement stock due to failure, damage, unhealthy specimens or theft. Prior to plant stock arriving to undulations with coarse washed sand.
Sheet CD-000. Contractor to ensure they have the latest issue of the documents prior to tendering and construction.
site, a Nursery inspection including the Landscape Architect and Landscape Contractor is required. The plant supplier is to ensure - Keep lawn moist until established and rooted in. Install temporary
Contractor should also take full account of documentation of Architectural, Civil Engineering, Hydraulic Engineering barriers (flagging tape) to ensure walking and driving on turf
and Electrical Engineering works which will be made available on site. Hard surface layout is to be at the discretion of all stock (or good selection of stock) is present during the inspection. It is also recommended that the Landscape Architect is on
areas is prevented and avoided.
the Project Manager. Where there is conflicting information, contact the Landscape Architect. site to inspect plant stock and plant set out prior to planting.
- Replace failed turf and relay with new turf.
Landscape works for this contract are to include the following: Plant stock notes:
- Container sizes are noted as follows:- 10. Services
1. Co-ordination with other Trades and conduit installation - Pots in millimetres. The location of all underground or overhead services shown on these drawings are indicative only. They have been
2. Excavation and Drainage of planting areas - Bags in litres. incorporated at the design or Council Approval stage for general information. The Landscape Contractor shall be
3. Topsoil - Supply and incorporation - Stock may be rejected if plants are:- responsible for liaising with the Principal Contractor to determine where the 'As Constructed' location of all water,
4. Edging to planting areas where not already supplied - Undersized proportional to specified container size or if the root system is underdeveloped. sewer, stormwater, electrical,communication or other existing services before commencing any excavation works.
5. Irrigation system - Oversized proportional to specified container size or severely root bound.
6. Shaping of garden areas - Unbalanced or uncharacteristic of normal or specified growth pattern for the species. 11. MAINTENANCE OF LANDSCAPE WORKS
7. Containerised Plant Material - Supply and installation - Not suitably acclimatised for the specific environment.
8. Garden Mulch - Supply and Spread - Diseased, infested with pests or suffering from other form of significant stress. Where directed by the Principal Contractor all must comply with soil and erosion control measures.
9. Turf - Supply and lay - Have poor root development or root defects. The Landscape Contractor is to allow for topping up mulch, rectifying defects, top dressing sunken edges, replacing
10. Services - Substitution of specified plant species only by written instruction from Landscape Architect. failed or under-performing plant stock at the end of the Maintenance Period. All Council controlled works to be
11. Maintenance of landscape works (12 months) inclusive of a twelve (12) month maintenance program. However, all internal, private works will run under a 13 week
12. Podium soils Implementation notes: maintenance program.
Ensure all planting procedures result in healthy plant species within the prevailing soil, climatic and management environment of
1. Co-ordination with other trades Maintenance and Inspection Program
this project. The following minimum is expected:
Contractor is to make full allowance for the reasonable activities of other trades. Contractor shall allow for the Responsibility Weeks after practical completion Maintenance Inspection
- Excavate a hole for each plant twice the diameter of the rootball and 100mm deeper than the root ball. Break up the base Frequency
installation of electrical services for landscape lighting at the appropriate time in the construction program.
of the hole to a further depth of 100mm and loosen the sides of the hole. Contractor 0-2 3 per week
Contractor shall pay due consideration to installation of irrigation lines so as to minimise disturbance to planted
- Remove the plant from the container with minimum disturbance to the root ball, place in final position, ensure it is Contractor 3-4 2 per week
areas. The coordination of appropriate conduit lines forms part of this contract.
central and plumb. Ensure the root ball is level with the finished surface of the soil surrounding the hole or bed. Contractor 5 - 13 1 per week
- Ensure correct placement of fertiliser requirements such as Nutri-Tech Solutions 'Life-Force Gold' + Life Force Carbon is Contractor 14 - onwards As per established maintenance regime
Contractor shall take due care with any machinery to site. Particular care is to be taken with newly poured concrete
ameliorated into existing or imported topsoil and that any water retention additive and the above fertilisers are installed
curbing and with newly laid A.C. road surfacing. Any damage to existing structures or services will be rectified at the
as per the manufactures specification. Maintenance Program General Notes
contractors expense. Any disputes will be settled by the site Superintendent.
- Thoroughly water plants immediately after planting with sea change KFF and at such times during the contract period - Maintenance inspection frequencies are minimum.
as required. All large stock will require a minimum of 10ltrs of water and smaller stock 5ltrs of water at the time of - Monitor plant performance and stress constantly and take appropriate remedial action. Soil moisture
Removal of Debris
planting. levels are critical during early establishment. Avoid over irrigating planting areas.
Site is to be cleared and is to remain clear of any deleterious material prior to commencement and throughout
- Backfill with topsoil as specified. Lightly tamp and water thoroughly to eliminate any air pockets. Ensure that - Mow turf every 2 weeks.
construction of landscape works. Planting areas are to contain planting and selected drainage materials only and are - Prune and shape all shrubs and trees on a monthly basis as required.
not to contain any building material waste. topsoil is not placed over the top of the rootball.
- Remove all stakes at 90 day inspection, or after satisfactory establishment.
- Fertilise all garden beds and street trees at 3 months.
2. Excavation and drainage of planting areas All tree stock within the landscape works must be healthy, true to form and free of defects:
- Contractor shall maintain an up to date written log book to record inspection observations and actions.
Break up and remove any asphalt, roadbase material or excess concrete slurry from kerbing works to achieve - Roots should be of good form and free from circling, girdling, J-rooting or other defects/abnormalities. Contractor
- The log will be made available to the site superintendent, upon request, at any time for examination.
required planting depths. Excavate site soil as required to ensure consistent high quality planting material. Break up to tease out roots and prune as required to encourage healthy root development. Contractor is not to accept trees
existing subgrade to a depth of 300mm. Any excavated planting areas are to be scarified at sides to provide which are not of a high quality or grown to best horticultural practice. Inspection Plan
anchorage for future root development. Additional excavation works will be required in areas of advanced plant - All tree stock to be inspected at unloading and prior to planting. Trees that fail to meet the above criteria are not be The Contractor shall co-ordinate the following inspections with the site superintendent.
material. Drainage is to be incorporated to all planting areas that are enclosed by hard edging and not otherwise planted and are to be returned to the Nursery/Supplier. - "Pre-start" - prior to commencement of works, for setout approval and construction timetable
drained. Contractor should allow for drainage to all garden areas. - Collect all empty plant containers daily during planting operations, remove from site and return for nursery to re-use. confirmation.
- Do not vary the plant locations from those specified on the drawings unless otherwise directed by the - Excavation inspection - at completion of excavation and drainage works and prior to topsoil addition.
3. Topsoil - supply and incorporation Superintendent. Should it be necessary to vary the locations and spacing for any reason, immediately apply for - Pre-planting inspection - at commencement of placement of advanced plant material.
All soils are to comply with AS 4419 Table 1 (both site topsoil and imported topsoil) directions by the Superintendent. Replace failed or damaged plants. This does not include vandalised or stolen plant - Setout inspection - at first setout of containerised plant stock.
Topsoil for garden areas should be a minimum 300mm depth. Where available maximise the use of soil from on site. material - this will be replaced prior to practical completion. - "On Maintenance" - at practical completion.
Top soils are to be tested for horticultural suitability and receive appropriate amelioration if required. All topsoil must - "Off Maintenance" - 365 days after practical completion.
be free from noxious weeds, rocks, roots, nut grass, rubbish or any other deleterious material. Place all topsoil in the Establishment notes:
areas directed and specified. Ensure that the topsoil is spread and graded evenly to prevent any ponding. Prevent The Establishment Period commences at the date of Practical Completion of Works. During the Establishment Period maintain 12. Podium Soils - (GB2)
excess compaction by construction plant. Stripped site topsoil needs to be stored in piles no greater than 2m high x best horticultural pratices including (but not limited to) the following items where required: watering, weeding, fertilising, pest Podium soils to be 'Podium Plus - Tub & Planter'
3m wide. Topsoil storage piles for storage greater than 4 months should be seeded with a suitable grass mix. and disease control, mulching, pruning, rubbish removal and keeping the site neat and tidy. Rectify defects that become Podium soils to be supplied by Hortis Group - contact Aaron Ashlin Tel. 0448 007 350. Soil to be installed with 2
Eradicate weeds using environmentally acceptable methods Project Urban discourages the use of Glyphosate and is apparent in the works under normal use. profiles as per Typical Detail shown on CD-901.
happy to discuss alternative options with the Landscape Contractor. Noxious weeds need to be screened out of the
topsoil prior to placement. 8. Garden mulch - supply and spread (GB1 and GB2)
All mulch is to be free of deleterious or extraneous matter such as soil, weeds, rocks, and twigs. The finish level of the mulch is to
4. Edging to planting areas be level with the finish level of all adjacent surfaces after settlement allowances of the topsoil and mulch. Ensure all mulch is
All planting areas adjoining turf are to be edged as specified on the landscape plans or detail sheets. Edging should
placed clear of plant stems to avoid rotting at ground level. Mulch is to be coarse chipped forest mulch (a combination of wood,
finish flush with adjoining finished levels and hard pavements. Round / Ease all edges where applicable.
leaves and bark) with no more than 10% fines nominal 25-50mm size or approved equal. Mulch shall be to a predominant depth
of 100mm as described above. Mulch is to be formed to avoid placement against green plant stems and overflow from purpose
5. Irrigation
formed edges, kerbs and pathways. Samples of all mulch types to be provided to Landscape Architect for approval prior to
Contractor is to install D&C fully automated irrigation system including pumps, valves, controllers and irrigation
components. Connection provided to town water supply. All garden beds within the site boundary are to be installation.
irrigated, including turf.
9. Turf - supply and lay
6. Shaping of garden areas Obtain turf from a specialist grower of cultivated turf.
Planting areas are to be finished in a well mounded fashion to facilitate drainage of excess water and to show Turf notes:
planting to best advantage. Mounds to be generally of 1:3 max and 1:5 minimum at time of practical completion. - "A" Grade turf as per Material Schedule with a minimum sod depth of 25 mm
- Turf to be laid within 24 hours of being cut and on day of delivery.
7. Containerised plant material - supply and installation - Grade turf areas evenly with falls to drains.
All planting is to be carried out in a manner consistent with good horticultural practice. All plant stock is to be in - Allow for ground preparation and placement of 100mm topsoil to specification requirements.
accordance with the scheduled nomenclature, well formed, hardened off nursery stock. They are to be container - Apply 'turf starter' fertiliser prior to laying (as per Manufacturer's specifications).
grown in potting mixture with a healthy root system and not pot bound. All pots shall be free of weeds and plant - Lay turf parallel to slope contours with staggered, close-butted joints so that the finished turf surface is flush with
stock is to be free from living insects, pests and disease. All plants are to be fully sun or shade hardened-off to suit adjacent finished surfaces.
their on-site growing position for a minimum period of 6 weeks. Contractor shall be responsible for replacing failed - Turf to be laid 10mm proud of adjoining surfaces to allow for settling of topsoil and to ensure there is a flush finish at at
plant stock within the 12 month maintenance period. It is therefore recommended that the Contractor does not the end of the maintenance period.
accept below Standard stock from the Nursery/Supplier.
Revision Date Amendment Drawn Checked
APPROVAL ONLY
LANDSCAPE SPECIFICATION NOTES NOT FOR CONSTRUCTION
A
B
C
20.08.2020
12.11.2020
12.02.2020
For Tender
Revised - For Tender
For OPW Approval
AK
AK
XL
CS
CS
CS
CD-001 D 27.04.2021 For Council Approval XL CS
NETANYA RESORT REFURBISHMENT
JOB NUMBER:20158 CLIENT NAME: NETANYA
Page 3
MATERIALS & FINISHES SCHEDULE
CODE / ITEM REQUIREMENTS
Garden Bed Type 1 (GB1) Internal grade typical, garden bed - natural ground. 300mm depth amended site or
imported topsoil to specification, cover with 100mm thick Organic Forest Chip Mulch, refer
to detail CD-900. Include ameliorant's as listed in the landscape specification notes
Garden Bed Type 2 (GB2) For Podium planter with specified soil mix and mulch cover Organic Forest Chip Mulch. Refer to
Podium CD-900 for typical detail and specification notes for specific podium requirements
Garden Bed Type 3 (GB3) For Scotts Osmocote® Professional - Premium Potting Mix to indoor planters. Ensure the inside
Pot Planters of planters are waterproofed, place Organic Forest Chip Mulch to allow for suggested pots
plants to spread and casacade over pot edge
Stone Cladding (SC1) Stone cladding to raised garden beds, matching that on Hastings Street. Brick infill rock
faced wall 'Prophet' rock <300mm Colour: Grey/tan Mortar: Grey Supplier: Prophet Gold
Mine Contact: John Parsons 5484 1226
Waterproofing to all raised Apply Sika One K to the insides of all raised planter, Minimum thickness per coat is 2-3mm
planters and apply 2-3 coats to manufacturers recommendations and specification.
Turf (T1) A Grade Empire Zoysia, refer to details and landscape specification notes
Garden Edging (EG-1) Aluminium Link Edge - Heavy Duty, 100mm profile, pinned and fixed as per manufacturers
recommendations. Allow for corner joining pieces as per manufacturers recommendations.
Raw Aluminium finish only.
Tile Type 1 (TL-01) 800 x 400 x 20mm 'Fallow' Granite tile exfoliated from 'Eco Outdoor'. All granite tiles/pavers
are be glued onto a concrete base and sealed with 2 coats of CCS 'Natural Supreme
Penetrating Sealer'. Grout colour to be confirmed. 1 PL1 - 900mm MEDIUM U BOWL 2 PL2 - 700mm LOW U BOWL 3 PL3 - 1200mm TALL U BOWL
Tile Type 2 (TL-02) 800 x 400 x 20mm 'Ezra' Granite tile exfoliated from 'Eco Outdoor'. All granite tiles/pavers CD-300 NTS CD-300 NTS CD-300 NTS
are be glued onto a concrete base and sealed with 2 coats of CCS 'Natural Supreme
Penetrating Sealer'. Grout colour to be confirmed.
Tile Type 3 (TL-03) 800 x 400 x 40mm 'Fallow' Granite paver exfoliated from 'Eco Outdoor' (Driveway Area). All
granite tiles/pavers are be glued onto a concrete base and sealed with 2 coats of CCS
'Natural Supreme Penetrating Sealer'. Grout colour to be confirmed.
Tile Type 4 (TL-04) 800 x 400 x 40mm 'Ezra' Granite paver exfoliated from 'Eco Outdoor' (Driveway Area). All
granite tiles/pavers are be glued onto a concrete base and sealed with 2 coats of CCS
'Natural Supreme Penetrating Sealer'. Grout colour to be confirmed.
Paving Type 5 (P5) Park Road Frontage, make good and reinstate disrupted concrete to match existing.
Contacted Noosa Council for specific mix but this is not referenced on file. Site inspection to
determine colour of aggregate with concrete rep. Colour of concrete along boardwalk
intersections - CCS chocolate. However, all colours and aggregates must be confirmed and
matched on site prior to construction. Approval from Architect and Landscape Architect
must also occur.
Steppers Type 1 (ST1) 1200 x 300 x 40mm Fallow Paver, laid on a concrete wetbed and surrounded by turf as per
the landscape plan. Refer to landscape detail. Seal granite pavers with 2 coats of CCS
'Natural Supreme Penetrating Sealer'.
Typical Pot Planters -(PL1, Quatro Design Pots, made to order in Murwillumbah in northern New South Wales. Colour
PL2, PL3) to be confirmed. Range of sizes to choose from. Typical sizes to be included within design
scope: 700mm LOW U BOWL, 900mm MEDIUM U BOWL, 1200 TALL U BOWL. All planters to
be have waterproofing and drainage aids directed to nearest drainage point as well as
having the option for feet to allow them to be moved from time to time for maintenance
purposes.
Trellis Type 1 (TR1) Refer to architects drawing for elevation [Eastern Elevation] dwg. no 19021 CD30.11. Marine
grade stainless steel horizontal wires to be installed onto Architects detailed aluminium
battens. Ensure all stainless steel wire including additional turnbuckles, eyebolts and fixings
are marine grade. Horizontal wires must be no more than 250mm apart.
Trellis Type 2 (TR2) Refer to architects drawing for elevation [Eastern Elevation] dwg. no 19021 CD30.11. Marine
grade stainless steel horizontal wires to be installed onto Architects detailed aluminium
battens. Ensure all stainless steel wire including additional turnbuckles, eyebolts and fixings
4 EG-1 - Aluminium Link Edge
CD-300 NTS
are marine grade. Horizontal wires must be no more than 300mm apart.
Revision Date Amendment Drawn Checked
APPROVAL ONLY
MATERIALS SCHEDULE NOT FOR CONSTRUCTION
A
B
C
19.08.2020
20.08.2020
12.02.2020
Preliminary - For Discussion
For Tender
For OPW Approval
AK
AK
XL
CS
CS
CS
CD-300 D 27.04.2021 For Council Approval XL CS
NETANYA RESORT REFURBISHMENT
JOB NUMBER:20158 CLIENT NAME: NETANYA
Page 4
JOINS CD-302
/
/
UG
/
/
UG
1
TR
/
Stainless steel wire trellis fixed
through batten screening by
UG
Architect, horizontal wire to be
GB1
no more than 250mm apart
UG
UG
UG
UG
GB1
UG
UG
UG
UG
GB1
TL-03 GB1 SC1 - Stone cladding
UG
Steel drainage grate of new planter walls
per architect typical.
UG
TL-04
2
TR
/
TL-02 GB1
UG
/
SC1 - Stone cladding D
TL-04 walls
of new planter
UG
Steel drainage grate
per architect typical. Steel drainage grate
UG
TL-01 Stainless steel wire
/
per architect typical.
trellis fixed through
GB1
/
batten screening by
UG
2
TL-03
TR
GB1 Architect
GB1 GB1
Steel drainage grate
UG
per architect.
GB1
D TL-04
UG
TL-02
GB1 LEGEND
UG
Steel drainage grate TL-01
per architect typical.
SURFACE FINISHES
UG
Timber bench seat Exposed tree roots, add GB1 - Garden Type 1
additional mulch where GB1 General Gardens Typical
and timber battens to Natural Ground
Architects detail possible whilst causing
UG
minimum disturbance GB2 - Garden Type 2
TL-03 GB2 For Podium Planters
GB1
UG
TL-01 GB3 - Garden Type 3
SC1 - Stone cladding New landscape GB1 GB3 For Pot Planters
of new planter walls planter
UG
New car space EG-1 EG-1 Aluminium Edge
- Refer to CD-300
AD
TL-01 - Fallow Granite Paving
UG
Timber bench seat P4
TL-04
and wall surrounds to TL-01 TL-02 SC1 - Stone cladding TL-01 800x400x20mm
Refer Schedule
Architects detail Timber bench seat of new planter walls
TL-02 - Ezra Granite Paving
UG
and timber battens to
RO
TL-02 800x400x20mm
Architects detail Refer Schedule
Timber bench seat to
TL-03 TL-03 - Fallow Granite Paving
UG
TL-01 Architects detail
Steel drainage grate TL-03 800x400x40mm
Raised tiled bench / seat GB1 SC1 - Stone cladding Refer Schedule
per architect.
wall, refer to Architects of new planter walls TL-04 - Ezra Granite Paving
UG
detail TL-04 800x400x40mm
'Netanya' Entry GB1 TL-01 Refer Schedule
RK
signage P5 - Concrete
UG
TL-02 GB1 P5 Match existing and
GB1
make good
Timber bench seat TL-02 TL-02 GB1
PA
ST1 - Steppers in lawn
UG
and wall surrounds to GB1 TL-04 ST1 1200x300x40mm
Architects detail Refer Schedule
SC1 - Stone cladding E SC1 - Stone Cladding
UG
ofSEnew planter walls SC1 - Stone cladding SC1 Prophet Rock <300mm
SE
SE
SE
SC1 - Stone cladding SC1 - Stone cladding of new planter walls Refer Schedule
SE
SE of new planter walls TR1 - Trellis Type 1
UG
T T T T T T SE T
of new planter walls TR1
SE T
SE
T T T T T T T T T T T T T T T T
/
Stainless steel wire
T T T T T T T T trellis, refer schedule
SE
SE T T T T T T
SE
SE
SE TR2 - Trellis Type 2
UG
SE
SE
TR2
/
Stainless steel wire
T
SE
SE
SE
trellis, refer schedule
SE
SE
UG
Revision Date Amendment Drawn Checked
APPROVAL ONLY
SURFACE FINISHES - SHEET 1 NOT FOR CONSTRUCTION
A
B
C
19.08.2020
20.08.2020
12.11.2020
Preliminary - For Discussion
For Tender
Revised - For Tender
AK
AK
AK
CS
CS
CS
CD-301 scale: 1:100@A1; 1:200@A3 D 19.04.2021 For OPW Approval XL CS
E 27.04.2021 For Council Approval XL CS
NETANYA RESORT REFURBISHMENT
TH
NOR
JOB NUMBER:20158 CLIENT NAME: NETANYA
Page 5
PLANTING SCHEDULE
Revision Date Amendment Drawn Checked
APPROVAL ONLY
PLANTING SCHEDULE NOT FOR CONSTRUCTION
A
B
C
19.08.2020
20.08.2020
12.11.2020
Preliminary - For Discussion
For Tender
Revised - For Tender
AK
AK
AK
CS
CS
CS
CD-400 D 19.04.2021 For OPW Approval XL CS
E 27.04.2021 For Council Approval XL CS
NETANYA RESORT REFURBISHMENT
JOB NUMBER:20158 CLIENT NAME: NETANYA
Page 6
4 COR gla
JOINS CD-402 5 COR NEG
3 CIS ant
+ 3 TEC hil
12 DIA LJ
/
BUILDING A BUILDING B
/
UG
/
4 RHA SM
/
UG
/
UG
UG
UG
3 RHA SM
1 ALO bri
UG
3 BLE gib
UG
20 LIR EG
4 VIO hed
UG
UG
6 VIO hed
1 RHA exc
2 SPA sen
UG
1 RHA exc
1 CYA coo
UG
2 ASP nid 2 RHA exc
1 ARC ale
3 BLE gib
UG
8 DIA LJ
1 RHA exc
10 DIC SF
UG
1 PHI con 1 COR NEG
1 BLE gib 3 CIS rho
/
4 DIA cae
UG
2 SPA sen
/
D
1 BLE gib 8 LIR EG
UG
2 BLE gib
3 COR gla
1 PHI con 2 PHI con 3 CIS rho
12 LIR EG 2 RHA exc 6 VIO hed
UG
to be trained up
3 DIC SF 2 SPA sen
/
3 ZAM zam stainless steel wire trellis
2 RHA exc
/
3 LIR EG Existing Trees to be
UG
7 LIR EG 1 PHI con 3 RHA SM retained and protected
7 CIS ED 3 DIC SF 1 DIA cae 10 LIR EG
UG
2 ARC cun 3 ZAM zam + 2 VIO hed 2 BLE gib
9 NEO SHE 2 VIO hed
3 PHI con 1 BLE gib
D
UG
2 ALO bris 3 COR neg
7 VIO hed 2 BLE gib 8 LIR EG Retain existing
3 DIC SF 1 ALO bri cordylines and liriopes
UG
4 ZAM zam to prevent damage to
1 RHA exc
1 ALO bri existing root system
1 ARC cun 2 BLE gib
UG
Existing Palms to be
5 ALP zer retained and protected
+ 4 VIO hed 4 ZAM zam
UG
1 ALO bri
3 BLE gib 2 DIC SF 1 BLE gib
8 NEO SHE LEGEND
UG
8 DIA cae
10 CIS ED + 6 VIO hed PLANTING
200L CUP ana 2 RHA exc
UG
12 DIC SF 2 BLE gib
GROUNDCOVERS/SHRUBS
1 ALP cae 10 RHA SM
AD
UG
1 ALP cae
2 BLE gib
2 BLE gib SHRUBS
1 RHA SM
UG
3 LIR EG
RO
3 LIR EG ACCENT SHRUBS
100L CUP ana 6 ALP zer
UG
12 VIO hed
6 PHI con Existing Trees to be + 9 VIO hed 2 BLE gib
3 BLE gib retained and protected Existing Poinciana 1 ALP cae
RK
GRASSES
UG
to be retained and 3 LIR EG
16 LIR EG protected
2 JUN con
8 NEO SHE
UG
PA
3 BLE gib TREES
2 PHI con
14 CIS ED 2 JUN con
UG
PALMS
10 LIR EG 8 DIA cae 2 JUN con F
UG
20 CIS ED 4 ALP zer 10 DIC SF Existing shrub
SE
SE
SE 6 VIO hed to be retained
SE
SE
SE 7 DIA cae Retain existing palms
UG
T T T T T T SE T T T T
EXISTING TREE / PLAM
SE T T entwined with
T poinciana per T
T T T T T T T T
SE T T T T T T T TO BE RETAINED
T T T
SE
SE T T T T T T
SE
SE site advice from landscape
SE
UG
SE
SE
architect.
T
SE
SE
SE
SE
SE
UG
Revision Date Amendment Drawn Checked
APPROVAL ONLY
GF - PLANTING PLAN - SHEET 1 NOT FOR CONSTRUCTION
A
B
C
19.08.2020
20.08.2020
12.11.2020
Preliminary - For Discussion
For Tender
Revised - For Tender
AK
AK
AK
CS
CS
CS
CD-401 scale: 1:100@A1; 1:200@A3 D 11.02.2021 For OPW Approval XL CS
E 19.04.2021 For OPW Approval XL CS
NETANYA RESORT REFURBISHMENT F 27.04.2021 For Council Approval XL CS
TH
NOR
JOB NUMBER:20158 CLIENT NAME: NETANYA
Page 7
Remove existing bbq, edging, fencing
and turf outside property
boundary.Replace with new garden
bed and planting per CD 402.
PL3 A B
GB1 GB1
PL1
BASEMENT LINE EG-1 EG-1
C
GB2 GB2 BASEMENT LINE
PL2
GB2 For pool treatment, finishes
and surround, refer to
Architects drawings
GB2
ST1 - Fallow steppers
through lawn. Lawn and top T1 GB2
of steppers to be flush
EG-1
PL1 PL1 PL1 PL1 PL1 PL1 PL1 GB2 EG-1 EG-1 EG-1 EG-1 EG-1
GB2 GB2 GB2 GB2 GB2
Typical pot planters,
refer to materials
schedule
BUILDING A BUILDING B
GB2
GB2 LEGEND
GB2 GB2 SURFACE FINISHES
GB1 - Garden Type 1
GB1 General Gardens Typical
Natural Ground
D GB2 - Garden Type 2
GB2 For Podium Planters
GB2
GB3 - Garden Type 3
GB3 For Pot Planters
EG-1 EG-1 Aluminium Edge
- Refer to CD-300
TL-01 - Fallow Granite Paving
TL-01 800x400x20mm
Refer Schedule
TL-02 - Ezra Granite Paving
D TL-02 800x400x20mm
Refer Schedule
TL-03 - Fallow Granite Paving
TL-03 800x400x40mm
AD
Refer Schedule
TL-04 - Ezra Granite Paving
TL-04 800x400x40mm
Refer Schedule
RO
P5 - Concrete
P5 Match existing and
make good
ST1 - Steppers in lawn
ST1 1200x300x40mm
RK
Refer Schedule
SC1 - Stone Cladding
SC1 Prophet Rock <300mm
Refer Schedule
PA
PL1, 2 & 3
Quatro Design Pots
Refer Materials Schedule
JOINS CD-301
Revision Date Amendment Drawn Checked
APPROVAL ONLY
SURFACE FINISHES - SHEET 2 NOT FOR CONSTRUCTION
A
B
C
20.08.2020
12.11.2020
11.02.2021
For Tender
Revised - For Tender
For OPW Approval
AK
AK
XL
CS
CS
CS
CD-302 scale: 1:100@A1; 1:200@A3 D 27.04.2021 For Council Approval XL CS
NETANYA RESORT REFURBISHMENT
TH
NOR
JOB NUMBER:20158 CLIENT NAME: NETANYA
Page 8
A B CAR gla
2
3 DIA cae 11 RHA SM
1 MET tho
C 4 FIC GI
10 LOM SHA 11 JUN con 20 JUN con C
3 MET tho
5 LOM SHA For pot plantings, 12 RHA SM 10 LOM SHA
refer to schedule 12 LOM SHA
4 CAR gla
3 LOM SHA
12 DIA LJ
5 CAR gla
3 CAS IT
5 LOM sha
5 MET tho
1 PAN tec 1 MET tho 1 MET tho 1 MET tho 1 MET tho 1 MET tho 10 MET tho
For pot plantings,
refer to schedule 4 DIA LJ 4 DIA LJ 4 DIA LJ 4 DIA LJ 4 DIA LJ
BUILDING A BUILDING B
3 RHA exc
4 SPA sen 2 RHA exc
3 JUN con Existing Cycad to be 2 SPA sen
5 CAR gla transplanted 3 CAL zeb
2 CYA coo 6 VIO hed
4 FIC GI 1 CYA coo
3 ASP nid
1 SPA sen
2 RHA exc
3 CAL zeb 2 PHI con
3 ASP nid
3 PHI con 1 ASP nid
3 CAL zeb 8 NEO SHE
30 NEO SHE
3 JUN con 18 VIO hed 3 CAL zeb
3 CAR gla 3 CAL zeb
3 BLE ind 6 PHI con D
3 FIC GI 3 PHI con
3 ASP nid 3 ASP nid
3 CAL zeb
LEGEND
3 ASP nid PLANTING
3 PHI con 1 SPA sen
3 BLE ind 3 BLE ind 3 BLE ind
3 CAl zeb GROUNDCOVERS/SHRUBS
16 NEO SHE
12 VIO hed
Existing Cycad to
be transplanted SHRUBS
D ACCENT SHRUBS
AD
GRASSES
RO
TREES
PALMS
RK
EXISTING TREE / PLAM
PA
TO BE RETAINED
JOINS CD-401
Revision Date Amendment Drawn Checked
APPROVAL ONLY
GF - PLANTING PLAN - SHEET 2 NOT FOR CONSTRUCTION
A
B
C
19.08.2020
20.08.2020
12.11.2020
Preliminary - For Discussion
For Tender
Revised - For Tender
AK
AK
AK
CS
CS
CS
CD-402 scale: 1:100@A1; 1:200@A3 D 11.02.2021 For OPW Approval XL CS
E 27.04.2021 For Council Approval XL CS
NETANYA RESORT REFURBISHMENT
TH
NOR
JOB NUMBER:20158 CLIENT NAME: NETANYA
Page 9
Notes: Notes:
FSL
- Place the rootball on a firmed base to achieve required FSL. - Place the rootball on a firmed base to achieve required FSL.
- Thoroughly water the root ball immediately after planting. Mulch
- Thoroughly water the root ball immediately after planting. - to 100mm depth
- Number of stakes will vary with pot size. Refer plant schedule. - Number of stakes will vary with pot size. Refer plant schedule.
- Cultivate sides of excavated hole 50mm. - Cultivate sides of excavated hole 50mm.
Soil blend or site topsoil
- to 300mm depth
Deep watering pipe Cultivated subgrade
- to 150mm depth
Hardwood Stake: Raise plant 100mm above
25x25x90mm Place 600mm finished surface level.
into the ground. Do not Mulch - pull away
place through rootball. from base of trunk
Secure with ties by looping
in a figure eight pattern.
Form an earthen basin 3 GARDEN BED PROFILE - GB1
around base of plant. CD-900 1:10@A1, 1:20@A3
Mulch: Pull away from Topsoil blend
base of plant. Notes:
Angle and space pavers as indicated on working drawing.
Form an earthen basin
300
Water retention If not specified space equally as shown on drawings.
around base of plant. 1
additive
1 Concrete haunch to all edges.
Fertiliser: Do not Ensure top of haunch is min.
allow contact with 20mm below surface level.
Topsoil blend roots. width (w)
Finished turf level, refer PALM COLLAR:
150
Fertiliser: Do not allow 10-20mm to schedule Guy ropes tied to palm
contact with roots. drainage gravel collar. Refer Inset Detail A
typ. 200
20
Sub-soil drain - refer INSET DETAIL A
Water retention additive detail. PALM GUYING:
Rootball anchor Fix Palm Collar as TURNBUCKLE:
30
Refer notes.
100
2xw specified to
manufacturers
1 140-300mm PLANTING 2 400ltr-Ex-ground PLANTING recommendations. Guy
CD-900 1:10@A1, 1:20@A3 Mortar bed at 2/3 height of trunk.
CD-900 1:10@A1, 1:20@A3
FIXING:
100mm deep sub base: Refer Notes.
CBR 45 compacted to 95%
standard compaction.
4 GRANITE STEPPERS - ST1
CD-900 1:10@A1, 1:20@A3
Notes:
- Place the rootball on a firm base.
- Thoroughly water the root ball immediately after planting. GARDEN BED TYPE 2 SOIL NOTES
- Cultivate sides of excavated hole 50mm deep.
NOTES:
- Do not disturb kerb, road pavement or road side drainage works. Podium soils to be 'Podium Plus - Tub & Planter' 1. Refer to plant schedule for palms to be guyed.
- Tease out roots on side of rootball when planting. Podium soils to be supplied by Hortis Group - contact Aaron Ashlin Tel. 0448 007 2. All metal work to be hot dipped galvanised.
- Ensure top of rootball is not buried; expose and set flush with finished level. 350. 3. Turnbuckles to be HDG, eye to eye type, 8mm dia. with lock nut.
4. All guy ropes are to be tensioned evenly to ensure palm is maintained in an upright position.
5. Wire guy rope to be 5mm dia. and secured with HDG 'D' clamps. Rope to be fixed with Duckbill
Soil to be installed with profiles as per Typical Details. The volume of the planting Anchors.
media shall be of sufficient capacity to ensure long term health and vigor of all 6. Duckbill Tree Anchors to be appropriate size as recommended by manufacturer.
plants.
7 TYPICAL PALM GUYING - NATURAL GROUND
Garden Bed Type 2 - A Horizon to be the top 30% of planting media with B CD-900 1:10@A1, 1:20@A3
Horizon to comprise of the lower 70% of the planting media
Hardwood stake: Place 600mm 200mm∅ grated inlet over the
into the ground. Do not place hydraulic drainage outlet cast Soil media profiles to contain the following:
through rootball. Secure with into the podium surface level A Horizon
ties by looping in a figure eight Planting as per landscape plan · 20% Coir Peat/Coir Chip Blend
pattern. River stone to
top of pipe · 10% Composted 0-10mm Slash Bark
Raise plant 50mm above Mulch · 20% Clinker Ash
finished surface level. - refer to plans for organic mulch · 25% Medium Washed Sand
Mulch: Pull away from base material
Geotextile Fabric · 25% Screened Sandy Loam
of plant. A Horizon mix 'Podium' mix by Hortus Group Mounding
25
(30%) - refer to CD-001 for Specification
refer to plan
Form an earthen basin Grated inlet 1:4 mound to center of garden
B Horizon
around base of plant. 100mm thick layer of bed
varies
125
200 - 250mm PVC pipe
100
washed coarse river sand · 60% Medium Washed Sand
located 150mm from B Horizon mix Mulch
500 max
· 20% Clinker Ash
the planters edge (70%) Geotextile fabric between - refer to plans for organic or
sand and drainage cell · 20% Coir Peat/Coir Chip Blend inorganic locations
Slotted at A Horizon mix
Varies refer to
Topsoil blend 30mm Atlantis drainage cell (30%)
min 300
drainage layer The following additives are to be mixed through the A Horizon 'Podium Plus - Tub & Planter' mix
or similar approved material within 1 week of delivery to site: - refer to CD-001 for Specification
plan
Water retention additive
· Nitrophoska Blue @ 1kg/m³ B Horizon mix Raised planters, refer to
1 Planter floor to be Topping slab - If required.
Fertiliser: Do not allow · Potassium Sulphate @ 350g/m³ (70%) architects detail and approved by
1 sloped to a minimum Depth varies to achieve falls
fertiliser to come in to drain. · Iron Sulphate Hepahydrate @ 1kg/m³ RPEQ engineer where necessary
1:50 fall to stormwater
contact with roots. · Gypsum @ 2kg/m³ Soil Depth
outlet Waterproofing and protection to
width (w) all planter surfaces - to · Dolomite @ 2kg/m³ - refer to level one surface plan
10 - 20mm Drainage gravel Podium outlet
2xw Architect's Specification. for raised planter soil depths
Soil test results are to be supplied for podium media certifying Podium / Basement Slab
Podium / basement slab
the the media achieves a pH 6.2 to 7.0 level and that the media - refer Engineer's detail.
- refer Engineer's detail.
exceeds AS4419 and satisfies AS3743.
5 45-200ltr PLANTING 6 TYPICAL PODIUM PLANTER MIX - GB2 8 TYPICAL PODIUM SOIL HEIGHT - GB2
CD-900 1:10@A1, 1:20@A3 CD-900 1:10@A1, 1:20@A3 CD-900 1:10@A1, 1:20@A3
Revision Date Amendment Drawn Checked
APPROVAL ONLY
CONSTRUCTION DETAILS NOT FOR CONSTRUCTION
A
B
C
20.08.2020
12.11.2020
11.02.2020
For Tender
Revised - For Tender
For OPW Approval
AK
AK
XL
CS
CS
CS
CD-900 scale as noted D 27.04.2021 For Council Approval XL CS
NETANYA RESORT REFURBISHMENT
JOB NUMBER:20158 CLIENT NAME: NETANYA