MCU10/2083 Development Application part 2 - Attachment 8 - Civil Infrastructure Report
CIVIL INFRASTRUCTURE REPORT PROPOSED DEVELOPMENT AT 37 Gibson Road, Noosaville FOR Marquette Properties
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 13 pages
Page 2
CIVIL INFRASTRUCTURE
REPORT
PROPOSED DEVELOPMENT AT
37 Gibson Road, Noosaville
FOR
Marquette Properties
M2383 – Revision A
JF&P Consulting Engineers Pty Ltd
Prepared by: Andrew Fraser
Approved by: Andrew Fraser
BRISBANE ‐ JFP House SUNSHINE COAST CENTRAL QUEENSLAND
76 Ernest Street, South Brisbane 237‐239 Bradman Avenue, Maroochydore 59 Goondoon Street, Gladstone
PO Box 3634, South Brisbane Qld 4101 PO Box 6 Maroochydore Qld 4558 PO Box 172, Gladstone Qld 4680
P 07 3844 7161 F 3846 1959 P 07 5443 2500 F 07 5443 4759 P 07 4972 2100 F 07 4972 5444
JONES FLINT & PIKE PTY.LTD. ABN 79 050 414 045 JF&P CONSULTING ENGINEERS PTY.LTD. ABN 77 050 414 036 MEMBERSHIPS. UDIA. PCA. PIA. UDAL. SSSI. RPECQ. AILA. WEBSITE. WWW.JFP.COM.AU
Page 3
TABLE OF CONTENTS
1.0 INTRODUCTION ..................................................................................................................................................................... 3
2.0 SITE CHARACTERISTICS.......................................................................................................................................................... 3
2.1 LOCATION ......................................................................................................................................................................... 3
2.2 TOPOGRAPHY ................................................................................................................................................................... 3
2.3 EXISTING INFRASTRUCTURE ............................................................................................................................................. 3
2.4 PROPOSED INFRASTRUCTURE .......................................................................................................................................... 4
2.5 SITEWORKS ....................................................................................................................................................................... 4
3.0 SITE ACCESSIBILITY ................................................................................................................................................................ 5
3.1 ACCESS .............................................................................................................................................................................. 5
3.2 PROVISION OF REFUSE VEHICLES ..................................................................................................................................... 5
3.3 PEDESTRIAN ACCESSIBILITY .............................................................................................................................................. 5
3.4 CAR PARKING FACILITIES .................................................................................................................................................. 5
4.0 STORMWATER AND WATER QUALITY MANAGEMENT ......................................................................................................... 6
4.1 STORMWATER MANAGEMENT ........................................................................................................................................ 6
4.2 WATER QUALITY MANAGEMENT ..................................................................................................................................... 6
5.0 AUTHORITY SERVICES ........................................................................................................................................................... 7
5.1 SERVICES WITHIN THE DEVELOPMENT............................................................................................................................. 7
5.2 SEWERAGE RETICULATION ............................................................................................................................................... 7
5.3 WATER RETICULATION ..................................................................................................................................................... 7
5.4 INFRASTRUCTURE CONTRIBUTIONS ................................................................................................................................. 7
5.5 ELECTRICITY AND TELECOMMUNICATIONS...................................................................................................................... 7
6.0 ENVIRONMENTAL MANAGEMENT ........................................................................................................................................ 8
6.1 CONSTRUCTION MANAGEMENT ...................................................................................................................................... 8
6.2 SITE BASED MANAGEMENT .............................................................................................................................................. 8
6.3 AIR QUALITY...................................................................................................................................................................... 8
6.4 NOISE ................................................................................................................................................................................ 8
7.0 DRAWINGS ............................................................................................................................................................................ 9
7.1 COUNCIL AS CONSTRUCTED DRAWINGS .......................................................................................................................... 9
7.2 ARCHITECTURAL GROUND FLOOR PLAN ........................................................................................................................ 10
LIST OF FIGURES
FIGURES
Figure 1 ‐ Site Location Plan........................................................................................................................................................... 4
CIVIL INFRASTRUCTURE REPORT – Revision A 37 Gibson Road, Noosaville Page 2
Page 4
1.0 INTRODUCTION
JF&P Consulting Engineers Pty Ltd has been commissioned by Marquette Properties to prepare a Civil
Infrastructure Report for the site located at 37 Gibson Road, Noosaville. It is proposed to develop the site into a
retail / service facilities outlet comprising eight tenancies.
The purpose of this report is to identify and address external servicing requirements associated with the proposed
development.
2.0 SITE CHARACTERISTICS
2.1 LOCATION
The subject site is located on Lot 1 on RP 802167. A site location plan is shown on Figure 1. The total site area is
approximately 3,860m2. The site is currently being used as a retail plant nursery outlet.
2.2 TOPOGRAPHY
The site is relatively flat with grades of approximately 0.5% to 1% sloping from the southern boundary to the
northern boundary.
2.3 EXISTING INFRASTRUCTURE
The proposed development will be designed to integrate with existing services within the area. Existing civil
infrastructure located in the vicinity of the site identified during preparation of this report include:
Existing underground piped stormwater drainage systems located within Gibson Road and Skipper Place
to the north and east of the site;
Existing water supply mains located within Gibson Road and Skipper Place to the north and east of the
site; and
Existing 150mm diameter sewer main located within the rear of the adjoining residential properties to the
south of the site
Connections to existing infrastructure will be carried out in accordance with Council and Unity Water’s guidelines.
Refer to Council As Constructed Drawings attached in Section 7.1 of this report for details.
CIVIL INFRASTRUCTURE REPORT – Revision A 37 Gibson Road, Noosaville Page 3
Page 5
2.4 PROPOSED INFRASTRUCTURE
Infrastructure will be limited to internal site works, building hydraulics and site stormwater associated with the
proposed development. Service connections will be made to existing Council and Unity Water’s trunk
infrastructure and no external works are required to service the site.
2.5 SITEWORKS
All construction activities will be managed under the control measures detailed in the relevant Council guidelines.
Vegetation cleared as a result of works on the site will either be transported off‐site for disposal in an approved
green waste disposal facility or mulched on‐site and reused for landscaping within the development.
All earthworks will be contained within the site.
Figure 1 ‐ Site Location Plan
CIVIL INFRASTRUCTURE REPORT – Revision A 37 Gibson Road, Noosaville Page 4
Page 6
3.0 SITE ACCESSIBILITY 3.1 ACCESS Access to the development will be via two entrances located within Gibson Road and Skipper Place – refer to Architectural Ground Floor Plan attached in Section 7.2 of this report for details. The existing road network and infrastructure adjacent to the site has the capacity to adequately cater for the proposed development. 3.2 PROVISION OF REFUSE VEHICLES The proposed layout provides adequate area to facilitate refuse vehicle turning movements within the site in accordance with Council requirements. 3.3 PEDESTRIAN ACCESSIBILITY Pedestrian access will be provided via entrances located within Gibson Road and Skipper Place. 3.4 CAR PARKING FACILITIES On site car parking facilities will be provided in accordance Council requirements – refer to Architectural Ground Floor Plan attached in Section 7.2 of this report for details. CIVIL INFRASTRUCTURE REPORT – Revision A 37 Gibson Road, Noosaville Page 5
Page 7
4.0 STORMWATER AND WATER QUALITY MANAGEMENT 4.1 STORMWATER MANAGEMENT Stormwater drainage design will be carried out in accordance with Council guidelines and the Queensland Urban Drainage Design Manual (QUDM). The development will drain into the existing stormwater systems located within Gibson Road and Skipper Place. Refer to JF&P Consulting Engineers Site Based Stormwater Management, lodged under separate cover for further details on stormwater management for the site. 4.2 WATER QUALITY MANAGEMENT Water quality management will be carried out in accordance with industry best practice procedures and healthy waterways guidelines. Water quality (sedimentation and erosion control) during the construction phase will be managed through the implementation of measures detailed in the civil operational works design drawings to be lodged at the Building Application phase. Refer to JF&P Consulting Engineers Site Based Stormwater Management, lodged under separate cover for further details on water quality management for the site. CIVIL INFRASTRUCTURE REPORT – Revision A 37 Gibson Road, Noosaville Page 6
Page 8
5.0 SERVICES 5.1 SERVICES WITHIN THE DEVELOPMENT Underground electrical supply, communications and telecommunications will be provided within the development. Water supply and sewerage connections will be provided within the development. 5.2 SEWERAGE RETICULATION An internal system of sanitary drainage lines will be provided within the development, connected to Council’s MH 30890 located at the southern boundary of the site. 5.3 WATER RETICULATION An internal system of metered private mains will be provided within the development, connected to Councils water main located in Gibson Road. 5.4 INFRASTRUCTURE CONTRIBUTIONS Infrastructure contributions will be calculated in accordance with the Sunshine Coast Regional Council policy current at the time of the relevant approval. 5.5 ELECTRICITY AND TELECOMMUNICATIONS It is expected that with appropriate modification/upgrade works the existing Energex Energy distribution system will have adequate capacity to cater for the proposed development. Each tenancy will be provided with a service connection. CIVIL INFRASTRUCTURE REPORT – Revision A 37 Gibson Road, Noosaville Page 7
Page 9
6.0 ENVIRONMENTAL MANAGEMENT 6.1 CONSTRUCTION MANAGEMENT Works carried out during the construction phase of the development will be undertaken in accordance with Council’s conditions of approval and best practice construction management practice. 6.2 SITE BASED MANAGEMENT Works undertaken by the civil contractor during the construction phase of the development will be in accordance with Council’s conditions of approval and best practice construction management practice. Erosion and transportation of sediments off‐site will be controlled by the use of sediment barriers. Stockpiles will be located within the site and contained within individual sediment barriers. Stormwater catchpits will be provided with protection devices where applicable and diversion drains or bunds will be provided to divert clean run‐off around disturbed areas. All sedimentation and erosion control measures will be carried out in accordance with the Institution of Engineers Australia (Queensland Division) Soil Erosion and Sediment Control – Guidelines for Queensland Construction Sites. 6.3 AIR QUALITY Works undertaken by the civil contractor during the construction phase of the development will be in accordance with relevant environmental policies incorporating air quality criteria. 6.4 NOISE Works undertaken by the civil contractor during the construction phase of the development will be in accordance with relevant environmental policies incorporating generated noise criteria. CIVIL INFRASTRUCTURE REPORT – Revision A 37 Gibson Road, Noosaville Page 8
Page 10
7.0 DRAWINGS 7.1 COUNCIL AS CONSTRUCTED DRAWINGS CIVIL INFRASTRUCTURE REPORT – Revision A 37 Gibson Road, Noosaville Page 9
Page 11
11GTP3937
12GTP3937
13GTP3937 64GTP2096
63GTP2096
65GTP2096 2GTP272
3GTP272 v
NOLA 66GTP209667GTP2096
68GTP2096
70GTP2096 1GTP272 v 4SP213592
11111 !
K 11111 STRE v 0GTP2026 2SP213592 MAR
K ET 69GTP2096
0SP213592
11111
Y ST
K K 0GTP272 K 3SP213592 RE
14GTP3937 1SP140481 !
3
K 46GTP4314 K K2SP160680 v 1SP213592
0SP140481 1SP120742
K 0BUP6367 K 1SP160680 v
v K
15GTP3937 3
45GTP4314 2BUP102210 0SP120742 v
K 0SP160680 1RP120702 3
1BUP6367 1BUP102210K K K4BUP102210 K
29GTP4314 3BUP102210 5BUP102210
44GTP4314 K K
K
2SP140481 2SP120742 2BUP6367 K
30GTP4314 v 2BUP102210 7RP138550 0SP175849
43GTP4314 3BUP6367 1BUP102210 !
v
31GTP4314 3BUP102210 6BUP102210
42GTP4314 4BUP102210 K 2SP1758491SP175849
2SP169407 5BUP102210 K
K 7BUP102210
K 1RP825996
32GTP4314 K
41GTP4314 7BUP102210
3BUP114126BUP102210 8RP138550
K v 0BUP7681
33GTP4314 8BUP102210 2BUP7681
40GTP4314 8RP1428482BUP114128BUP102210
9BUP102210 K
T
0GTP3937
4GTP4314 K K 1BUP7681
1SP1694070SP169407
1BUP11412 9BUP102210
TREE
!
0BUP102210 K 1BUP77012BUP7701v
11BUP102210
10BUP102210 3BUP7701 K
35GTP4314 38GTP4314 0BUP11412 K K12BUP102210
36GTP431437GTP431439GTP4314 KK K
12BUP10221011BUP102210 K13BUP102210 K
K 4RP124554
K 13BUP102210 0BUP7701
AS S
28RP138550
! K
SY LV
IA ST 4BUP77015BUP7701
K
v REET
THOM
KK 5RP124554
6BUP7701 11111
v KK
TP100627
49GTP100627
51GTP100627 !
50GTP10062753GTP100627 3 11RP138550
52GTP100627 K 6RP124554
K 0GTP101849
1BUP6971 v
54GTP100627 K
10RP142848 2BUP6971 0BUP7283
vK K
55GTP100627 v
LL
P100627
GTP100627
60GTP100627 0BUP6971 3BUP72832BUP7283 !
59GTP100627 1BUP7283
ESHE
0BUP6949
3SP140490
K 1BUP69492BUP6949 1SP140490 K
K K
0SP140490
K 3BUP6949 K
4SP140490
K
OCKL
K
2SP140490
v
14RP138550 K
K vK
K K
THE C
K
v
! K
MH30304
11GTP101849
MH30757 K
2
! GIBSO
PI3 307
3
v N RO
AD
PI33517
!
! PI3 3073
K 3RP170388
3 3
K K Legend !
K v WTP Wastewater Pump Station
MH30303
v
!
K
K v
Q :DWHU7UHDWPHQW3ODQW
Water Pump Station
"
< :DVWHZDWHU3XPS6WDWLRQ K
K
K
3 !
3
K 3RP170388
"
Wastewater Pump
MH30501
<
Water Pump
v
3XPS6WDWLRQ
K "
=
K
:DVWHZDWHU3XPS
vVent
K
1RP802167
924RP863244
"
Wastewater
= ! KK
3XPS Û :DVWHZDWHU9HQW
K
Wastewater Manhole
Kv 568RP863244
+&
v DOORWKHUYDOXHV!
PI1 262
Water Meter
K
K v )ORZPHWHU 567RP863244
0HWHU
PI3 306
Water Hydrant u /DPS+ROH MH30891 v 1
! +\GUDQW K v 0DQKROH
Water Source R 1R$FFHVV0DQKROH 3
i v 2YHUIORZ ! v MH30890 ! v
v K
5HV2XW
/ 3XPS:HOO K KEE 11111
K
Water Control Valve K K L CO
3 6WRS&RQWURO 0
K
6WRUDJH0DQKROH
K URT
3 6WRS=RQH%RXQGDU\ v 9DFXXP0DQKROH K K K
Þ $LU&RQWURO ) 9DOYH3LW
" K
62
b 5HIOX[5HIOX[ K K 11111
!K
Wastewater System Valve
KK
PI3 30
b 5HIOX[=RQH%RXQGDU\ 3 6WRS K
K K
K v KK K K
[
6FRXU0DLQWHQDQFH Wastewater Control Valve
K
N'bK K K K K
Water System Valve $LU
3 DOORWKHUYDOXHV! 3UHVVXUH5HGXFLQJ K v 548RP863244
549RP863244
]
Water Fitting 5HIOX[
¸ K
[
K
6FRXU
MH30793
E
&URVV&RQQHFWLRQ
Wastewater Structure 550RP863244
AC
E
! Kv
% 5HDG\7DS
Kv K
K
K
PLAC
:DVWHZDWHU6WUXFWXUH
K K K
PL
v
G 7DSHU
Wastewater Fitting
H 7DSSLQJ%DQG :DVWHZDWHU)LWWLQJ
547RP863245
ER
K !
H :\H Wastewater Meter
:DVWHZDWHU0HWHU 3 K
K
AT
PER
Water Service
:DWHU6HUYLFH
Wastewater Gravity Pipe KvK K 540RP863245
357RP856170
LW
PP
K K
2BUP105602 3
Water Pipe
! PP
K
SU 546RP863245
PP
NS !
SKIP
1BUP105602
K
IL
Wastewater Property Connection
! PP
:DVWHZDWHU3URSHUW\&RQQHFWLRQ EE 3K
ST
Water Reservoir
K KE
Wastewater Property Connection Point
K K
! K 0BUP105602
:DWHU5HVHUYRLU
356RP856170 :DVWHZDWHU3URSHUW\&RQQHFWLRQ3RLQW R 541RP863245
v
CL
Water Access Chamber
0GTP4149
OS
DOORWKHUYDOXHV!
Wastewater Pressure Pipe
$FFHVV&KDPEHU&LUFXODU 545RP863245
E
3UHVVXUH3LSH
$FFHVV&KDPEHU5HFWDQJXODU ',686('
v
355RP856170 (IIOXHQW
0GTP4233KK
)8785( 4GTP4149
5GTP4149 542RP863245
" 926RP863246
35,9$7(
5LVLQJ 6GTP4149 K
0GTP102778 <K v
v
Wastewater Access Chamber 1GTP4233
!
354RP856170 :DVWHZDWHU$FFHVV&KDPEHU
2GTP4233 K
AC_STORM_PIT 544RP863246
!
( 3LW3ROOXODQW7UDS 506RP845982 1GTP102778 v
(
! 3LW 2GTP102778 11111
IT
920RP845981 v
353RP856170
AC_STORM_STRUCTURE 543RP863246
U
Û +HDGZDOO3ROOXODQW7UDS K
N
C
Û E KK
+HDGZDOO
P
IR
352RP856170 AC_STORM_PIPE TU
C
$&B67250B3,3( 2BUP100427 KK N v
v
5HIHUWR'DWD9DOXH7DEOHRQSDJHIRUDWWULEXWHLQIRUPDWLRQ
1BUP100427 E
E
Surface Drain
RM KK 351RP856170 6XUIDFH'UDLQ C
IR
N
3
AI 337RP863246 C
TU
v Natural Pond
v 580RP8
D 1DWXUDO3RQG 0BUP100427 U
QU 350RP856170 IT
P
856170 Run-off Basin 358RP863246 3
AY ! $6&216758&7('6(:(5$*($1':$7(56833/<3/$1
E
5XQRII%DVLQ
374RP856170 359RP863246 KK v
N
300RP856170 v 11111
KK 375RP856170 512RP863247 360RP863246
301RP856170 KK
Disclaimer
7KHVH0DSVDUHVXSSOLHGXQGHUWKHIROORZLQJFRQGLWLRQV
0DSSLQJGHWDLOVDUHVXSSOLHGIURPLQIRUPDWLRQFRQWDLQHGLQ8QLW\ZDWHU¶VUHFRUGVZKLFK 1:1,150 At A3 Paper Size
3ULQWHGRQ
PD\KDYHEHHQIXUQLVKHGWR8QLW\ZDWHUE\RWKHUSHUVRQV8QLW\ZDWHUJLYHVQRZDUUDQW\ $VVHW,QIRUPDWLRQ6\VWHPV
$VVHW,QIRUPDWLRQ6\VWHPV
I
RUJXDUDQWHHRIDQ\NLQGH[SUHVVHGLPSOLHGRUVWDWXWRU\WRWKHFRUUHFWQHVVRU
DFFXUDF\RIWKHPDSGHWDLOVRUWKHGHJUHHRIFRPSOLDQFHZLWKDQ\VWDQGDUGVLQWKLV
PDWWHU3HUVRQVPDNLQJGHFLVLRQVZLWKILQDQFLDORUOHJDOLPSOLFDWLRQVPXVWQRW
LOT1RP802167 37 GIBSON RD NOOSAVILLE TT hh ii ss pp ll aa nn ee xx pp ii rr ee ss 11 44 dd aa yy ss
ff rr oo mm U U nn ii tt yy w
w aa tt ee rr
8QLW\ZDWHU
8QLW\ZDWHU
*URXQG)ORRU.LQJ6W
*URXQG)ORRU.LQJ6W
&DERROWXUH4/'
UHO\XSRQWKHPDSGHWDLOVVKRZQRQWKLVSODQIRUWKHSXUSRVHRIGHWHUPLQLQJZKHWKHU
0HWUHV &DERROWXUH4/'
P ,QTXLULHV7HO
,QTXLULHV7HO
DQ\SDUWLFXODUIDFWVRUFLUFXPVWDQFHVH[LVWDQG8QLW\ZDWHU DQGLWVRIILFHUV
DQGDJHQWV H[SUHVVO\GLVFODLPUHVSRQVLELOLW\IRUDQ\ORVVRUGDPDJHVXIIHUHGDVD P rr ii nn tt ee dd O O nn dd aa tt ee
(PDLOJLV#XQLW\ZDWHUFRP
UHVXOWRISODFLQJUHOLDQFHXSRQWKLVLQIRUPDWLRQ Grid North MAP GRID OF AUSTRALIA 1994 ZONE 56 (PDLOJLV#XQLW\ZDWHUFRP
[OCR of page images]
] Ng
becreaais ace f
KR
T P43: as
GTP. 3673937
fet
Iron
poz eae
‘S26TP10 00627 |
| |, Legend
ae
a
Water Pump Station
/ mni30501 a
i Water Pump.
a
3
YY
$s
“Ss
“asdreabia | secre. 314 | fosdersa12 " agd2BuRto2210
TI Sng — —_ 1022; UP 102270 —-——__} @
366) rene ene |} ‘aorncn ot BUF fap 4 j
Wastewater Pump Station
Fenian
Wastewater Pump
Wastewater Vent
WG wert eu
Wastewater System Valve
esa Pott Tip
‘AC_STORM_PIPE
Surface Drain
aoe 337RP863246 Ss80RPé
enti pone OBUP100427 4, AQ
Pine J... vwe.0, AS CONSTRUCTED SEWERAGE AND WATER SUPPLY PLAN S5BRPBSI24G a 7
375RP856170
1RP825996 | {
}
28RP138550
1RP802167
Refer to Data ValueTable on page.2 (Soak infort
eort
“2pureo71
_ 0BUP6971)
OBUP6949
011
| f— | 0SP213592 |
L 1AGTP3957 fc deni j —— pi38P213592 | |
fs ee TPaaye | osP149 1) SFgg0742 oBuP6367 | } —
wporps 3997 sboreasia “> 0ge120742__ H | 210 —<—
aperPsai of Ta “1 jUP6367 | vol Cage 12210
aacrPa3t ‘Sno giuren, { Lee 0z2(ggBYP 102210
1UP102270 te
osrPaate 4GTPA 54314 |3BUP6367 py | 4BUPT02
borrasia ATP 43 “ai | —3BUP 102210
—
Water Meter wae 5oaRP863244
[Ml ste Fownater I 567RP863244
Water Hydrant © nee ,
© tat Bh Merton |
Saaeeses ad Nee _
Y ron ovestow a
Water Control Valve Keegy ° ait
De ep cont OuURp
De sep. 2oedainsy
(A. Scot ae
Metis zotontny Dee Soe |
Scour, Maintenance Wastewater Control Valve J |
Water System Valve A |
Pe caterer ver Presure Rding \sasRPs63z44,
Water Fitting He Rete pronressz44
X scou i
exe Wastewater Structure A | 550RP863244
fooery —d} Fo |
® m= Wastewater Fiting ti | Sy
@ rehgsan © Sintering ai } 547RP863245 |
OD me Meson i 8
las? tpas6170 =e Wastewater Gravity Pipe i } ——.540RP8 63245
\ a Seon aalosoe a! | saeRPs6s245
\ =a Wastewater Property Connection [1BUPEps6b2 gi ¢ )
\ aan tts Prpy Comet ww! sk /
\ r Reservoir Wastewater Property Connection Point PEC RTOTEeT ei —
\356RP856170 Witer Access chamber ©) vnuaarPrepaty Cesta Port i |
\ J stenerwsuee Wastewater Prossure Pipe i
. ccm TN re
\ (Ea temsctenonrecongiir epee
\S55RP856170, Senet
Sarg Tees, ;-
Wastewater Access Chamber 1G61P4233 0 f
354RP856170 [ovestewateraccens Chanber 267P 4233, eae
‘AC_STORM_PIT 4
@ Pt-Pansnt rap 2P845982 1G1P102778
@ 2G1P102778
920RP845981
A53RP56170 ‘AC_STORM_STRUCTURE 81
512RP863247
ia
pol
wa
w
wy
11GTP101849
1:1,150 At A3 Paper Size
LOT1RP802167 37 GIBSON RD NOOSAVILLE
Printed on: 23/08/2010
This plan expires 14 days
from Unitywater
Printed On date
Page 12
1RP825996
0BUP7701 4RP124554
0BUP102210 28RP138550
Stormwater Plan
1500RCBC
D /S IL0.55
U/S IL0.53
L=38.597
Gibson Road
5RP124554
0 4 8 12 16 20 Meters
Scale SYLVIA
1:750 STR E
Last Printed onEAugust
T 23, 2010
SL 1.48
12 =22 IL L0
SL 1.37
0 0 .6 0
L /S I
RC 52
11RP138550
U /S
P
D
While every care is taken to ensure the accuracy of this product, neither the SL 1.56
6RP124554
ET
Sunshine Coast Regional Council nor the State of Queensland makes any
representations or warranties about its accuracy, reliability, completeness or
S STRE
23RP138550
suitability for any particular purpose and disclaims all responsibility and all liability 300RC P
(including without limitation, liability in negligence) for all expenses, losses, L=82.08
4
damages (including indirect or consequential damage) and costs that may occur U/S IL0
.85
as a result of the product being inaccurate or incomplete in any way or for any D /S IL0
THOMA
reason.
0BUP7283
0BUP9122
Crown & Council Copyright Reserved.
0BUP5782 0BUP6971
L=68.3 C
0.55
Legend
U/S IL 32
LL
B
0BUP6949
0
750RC
D /S IL
KLESHE
Swstruct Point
0BUP9270
0SP140490
C
Swpits Point
THE CO
GPTs Point
Catchpit litter baskets Point 14RP138550
Ilotsw
0BUP5963 375RCP
Swd Line SL 1.77 L=12.965
SL 1.76 U/S IL0.47
37 3.0 0.47 6
L= S IL L0.4
OpenDrain
D/S IL0.47
5R 0
U/ /S I
1
CP 1
D
Catchpit litter baskets Line 0BUP9881
SL 1.86
GPTs Polygon
375RC P
SL 1.27 L= 300RC P
10.827
U/S IL0.
57 L=15.882
SL 1.21
0GTP101077
D /S IL0. U/S IL0.
32 75
D /S IL0.
32
.24
.08
P
U/S IL-0 9
0
650RC
D /S IL-0
L=18.9
750RC SL 1.5
L=56.0 P
U/S IL 98
-0
D /S IL .19 37
-0.26 L 5R 3RP170388
U/ =5. C P
D/S IL0.66
U/S IL0.82
L=15.254
S 27
300RC P
5RP842163 D / IL0 9 SL 1.8
S GIBSON ROAD
IL .4 8
P
.46
19
1050RC
0
D /S IL0
6RP842162 .4
L=42.4
300FRC
U/S IL0
SL 1.87
L=20.404
U/S IL1.07 SL 1.75
300R
C
D/S IL0.87 L=32.0 P
U/S IL 19
0.66
D /S IL SL 0
0
45
P
L=7.388
1050RC
U/S IL0
D /S IL0.
SL 0
0SP110383
P
6
1RP802167
1050RC
D /S IL0
L=27.64
U/S IL0
SKIPPER PLACE
0GTP100347
SL 0
P
6
1050RC
D /S IL0
L=21.67
U/S IL0
2RP856186
0BUP100158
SL 0
0SP120996 0GTP104949 0SP152278
.66
.56
P
0BUP13618
L=74.07
1200RC
D /S IL-0
U/S IL-0
0SP129043
548RP863244
Page 13
7.2 ARCHITECTURAL GROUND FLOOR PLAN CIVIL INFRASTRUCTURE REPORT – Revision A 37 Gibson Road, Noosaville Page 10
Page 14
7 8 9 1 12 11
DA-004
2500 16667 57283 4000
1500
GIBSON ROAD
REMOVE EXISTING
TREE
3
6000
TENANCY 1 DECK BICYCLE
4 PARKING 1 15
PYLON STREET 16
REMOVE EXISTING
45 SIGN GFA SCHEDULE
TREE
TENANCY 1 AMENITIES 50 m²
46 56
REFUSE 30 m²
SKIPPE
TENANCY 1 180 m²
MRV
MRV
TENANCY 2 155 m²
30000
TENANCY 2 TENANCY 3 155 m²
21
SERVICE ACCESS
67 57
TENANCY 4 125 m²
R PLAC
E
TENANCY 5 105 m²
38 TENANCY 6 85 m²
TENANCY 3 37 22 TENANCY 7 115 m²
REMOVE
EXISTING TREE
BICYCLE TENANCY 8 105 m²
PARKING
10 1110 m²
1500
GAS STORE
AMENITIES NLA SCHEDULE
9538
TENANCY 4 TENANCY 5 TENANCY 6 TENANCY 7 TENANCY 8
6 REFUSE TENANCY 8 DECK TENANCY 1 175 m²
BIN WASH TENANCY 1 DECK 80 m²
200
SERVICE ACCESS
2500
TENANCY 2 150 m²
5
TENANCY 3 150 m²
TENANCY 4 120 m²
TENANCY 5 100 m²
TENANCY 6 80 m²
TENANCY 7 110 m²
TENANCY 8 100 m²
TENANCY 8 DECK 25 m²
1090 m²
0 10 20
1:500
1 : 500 @ A3 DA-001 GROUND FLOOR PLAN 17/09/10
DONOVAN HILL Gibson Road, Noosaville - 980
17/09/2010 7:31:53 PM