3.1 INTRODUCTION
The Rational Method Formula was used to calculate the stormwater runoff flows through and off the site for the
Pre, Post and Ultimate Development scenarios. The Rational Method formula is as follows.
Q = C I A / 360 Where, Q = Peak Flow Rate (m3/s)
C = Runoff Co-efficient
A = Area of Catchment (ha)
I = Rainfall Intensity (mm/hr)
3.2 CATCHMENTS
The pre and post development scenarios were analysed as a single site due to the large impervious areas (pre and
post) and outfall locations. Details on the pre and post development catchments are tabulated below.
Table 1 - Catchment Details
Pre Development Area Pre Development Post Development Area Post Development
Catchment
(ha) Fraction Impervious (ha) Fraction Impervious
A 0.386 0.9 0.386 0.9
3.3 CO-EFFICIENT OF RUNOFF
For the Pre Development scenario a C10 value of 0.88 (fraction impervious of 0.9) was assumed for the existing
retail use from Table 4.05.3 (a), QUDM, 2"d Edition, 2007.
For the Post Development scenario a C10 value of 0.88 (fraction impervious of 0.9) was assumed for the development
from Table 4.05.3 (a), QUDM, 2nd Edition, 2007.
3.4 TIME OF CONCENTRATION
For the undeveloped catchment, the time of concentration was determined from standard inlet times and pipe
velocities for the remaining length of flow (Table 4.06.1, 4.06.5 & Section 4.06.9, QUDM, 2nd Edition, 2007).
Table 2 - Time of Concentration - Pre Development
Standard Inlet Time
Catchment Pipe Flow length (m) Pipe Velocity (m/s) Pipe Time (mans) Total t. (mans)
(minx)
A 5 40 2.0 I 0.33 5.33
For the developed catchment, the time of concentration was determined from standard inlet times and pipe
velocities for the remaining length of flow (Table 4.06.1, 4.06.5 & Section 4.06.9, QUDM, 2"d Edition, 2007).
Table 3 - Time of Concentration - Post Development
Standard Inlet Time
Catchment Pipe Flow length (m) Pipe Velocity (m/s) Pipe Time (mine) Total 4 ()
A 5 50 2.0 0.42 5.42
SITE BASED STORMWATER MANAGEMENT PLAN - Revision E "ibson Road, Noos 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.