Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

Development Application part 7 of 10 Stormwater Management Report - MCU13/0092

of 119

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (60.2 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

                                                                                                                        ~
                                                                                                                         J
                                                                                                                        .
                                                                                    i(~    ed    (Qli$UHihg
                                                                                                                         ’II
                                                                                    innovation Ingenuity inspit,ation
                                                                                              ABN 89106 675 IS6         .~

4.6 Treatment Train effectiveness in Pollution Reduction


The MUSIC Model was run calculating the effectiveness in pollution reduction based on treatment being undertaken
by the Bioretention Basins. Table 6 shows the post treatment concentrations compared to the Queensland Water
Quality Guidelines.

                                           Table 6: MUSIC Output Results


                            Pre Treatment       Post Treatment     Water Quality     Reduction in
             Pollutant
                                Load                 Load                              Pollutant
                                                                    Objectives
               TSS            998 kg/yr            181 kg/yr           80%              81.9 %
                TP            1.74 kg/yr          0.584 kg/yr          60%              66.4%
                TN            8.11 kg/yr           4.07 kg/yr          45%              49.8%
                GP            59.0 kg/yr           0.00 kg/yr          90%               100 %


(Referto Appendix C for Treatment Train Effectiveness)




                                                    Page 112

Level 2, 39 Sherwood Road                     [email protected]                             P: 07 3870 8888
Toowong QLD 4066                              www.icubed.com.au                              F: 07 3870 8988

Used in these records

About this file

File size
60.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application part 7 of 10 Stormwater Management Report - MCU13_0092.pdf · 60.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.