Council archive · source document
Development Application part 7 of 10 Stormwater Management Report - MCU13/0092
Very large file (60.2 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
~
i(~bed ((>flsultifig <..(
innovation ingenuity inspir.alion
ABN 89106 675156 ~
All maintenance activities must be specified in an approved Maintenance Plan (and associated maintenance
inspection forms)to be documented and submitted to Council as part of the Development Approval process.
Maintenance personnel and asset managers will use this Plan to ensure the bioretention basins continue to function
as designed. An example operation and maintenance inspection form is included in the checking tools provided in
Appendix D. These forms must be developed on a site-specific basis as the nature and configuration of bioretention
basins varies significantly.
P age 114
Level 2, 39 Sherwood Road [email protected] P: 07 3870 8888
Toowong QLD 4066 www.icubed.com.au F: 07 3870 8988
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 7 of 10 Stormwater Management Report - MCU13/0092Related documentApplication case desk ↗
About this file
- File size
- 60.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.