Council archive · source document
Development Application part 7 of 10 Stormwater Management Report - MCU13/0092
Very large file (60.2 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
~.
I !.lb d c>nsuHing ’i3(
innovation ingenuity inspilation
ABN 89106 675156
Jo
.
Appendix C -
Music Output
I
-I
~#;--I-;-~
.. ------
f---
I
.1
I I - ,
I I~ ,I
I
L-Commereial Split ROADS - 1743m2 C1DO%’mp.) 6i~retentiOn Basin i. Receiving Node
I I I i I I
I !
! I
I
Sources Residual load 0/0 Reduction I
,
~ is) -~"""""""’~; ~~~
-~ -
Il:
M~ I
flow (Ml/Vii) ,
2.55 2.51 1.5
1 "
’:01 ji
Peak Flow (m3Is) ~
85.3E-3 98.6E-3 -15.6
Total Suspended SorKis (kg’/vr) 993 181 81.9
Total Phosphorus (kg/yr) 1.74 0.584 ~t:
66.4
Total Nitrogen [kg/Vii) 8.11 4.07 49.8
Gross Pollutants (kg/yr) 59.0 0.00 100.0
I~~I
P age 119
Level 2, 39 Sherwood Road [email protected] P: 0738708888
Toowong QLD 4066 www.icubed.com.au F: 07 3870 8988
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 7 of 10 Stormwater Management Report - MCU13/0092Related documentApplication case desk ↗
About this file
- File size
- 60.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.