Council archive · source document
Development Application part 7 of 10 Stormwater Management Report - MCU13/0092
Very large file (60.2 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
~
i~1,!;IHHI ((HiHIHing
innovation ingenuity inspiution
ABN 89106 6751 S6
.!J_
I
4.3 Inspection and maintenance checklist for bioretention systems
lA;.;ETTYPE Bloretention ASSET 10
""",,___
J
Location
Date
.
Date of last rainfall Weather
Officers name
Bioretention plan
Insert diagram or plan of the asset showing key features e.g. locations of inlet, outlet, and overflow
Flonallnformation : J
Time taken to complete inspection or maintenance
Photos or site 1.
(explanatory notes) 2.
3.
4.
5.
6.
General comments and sketches
Officer’s signature
P age 121
Level 2, 39 Sherwood Road [email protected] P: 07 3870 8888
Toowong QLD 4066 www.icubed.com.au F: 07 3870 8988
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 7 of 10 Stormwater Management Report - MCU13/0092Related documentApplication case desk ↗
About this file
- File size
- 60.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.