Development Application part 7 of 10 Stormwater Management Report - MCU13/0092
Very large file (60.2 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
9.
,.
icu ei! n$utti!lig
innov;>tion ingenuity inspiration
ASN 89106 675 156
J
I
4. Water Quantity
4.1 Predeve/opment Flows
The predevelopment runoff from the site was calculated using the ILSAX method within Watercom Drains. The runoff
was calculated at the outlets at the north western and south western corners of the site and has been summarized in
Table 2 and 3.
4.2 Detention Storage
The detention storage was calculated for Basin 1 and Basin 2 within Watercom DRAINS. The inflow and outflow
hydrographs are shown in Appendix D. The hydrographs clearly show that the runoff entering the system has been
greatly reduced so that in conjunction with the remaining unmitigated flow there is less than the existing amount of
runoff entering the downstream system. The 15 minute duration storm was found to be the worst case scenario.
The hydrographs are for the storms:
Major events:
AR&R 100 year, 15 minutes storm, Zone 3
AR&R 50 year, 15 minutes storm, Zone 3
Minor events:
AR&R 10 year, 15 minutes storm, Zone 3
AR&R 2 year, 15 minutes storm, Zone 3
AR&R 1 year, 15 minutes storm, Zone 3
Designed Basin size:
Basin 1 will be an approximately 9.4m long x 6.0m wide x 1.5m deep. The maximum volume will be approximately
85m3.
90 :
-
E
80
70
60 .. -- ...
..
-.
tl I
.
--
..........
c ..-.-
I
...-L.
!;
..
-
..
.....
--
--<----
.~.__
;
-
.-.
.__
... i.
..._.L.._.
;
,
:::J
50 -t ____,---
-
o
40 .__. ~
-f-.- l", -- <--- --
(I) I
E
:::J
30 .;...-.
..-........-.... .-.
...........---t-.............-......i...-.-.-- ...-..-.....!..---.-...--.........
--
I
20 +-._---
o
>
10
I
o
1.8 8 8.2 8.4 8.6 8.8 9 9.2 9.4
Elevation (m)
Figure 3: Volume vs Elevation for Basin 1
Page 18
Level Z, 39 Sherwood Road [email protected] P: 07 3870 8888
Toowong QLD 4066 www. ubed.com.au F: 07 3870 8988
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 7 of 10 Stormwater Management Report - MCU13/0092Related documentApplication case desk ↗
About this file
- File size
- 60.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.