Council archive · source document
Development Application part 7 of 10 Stormwater Management Report - MCU13/0092
Very large file (60.2 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
icub~d. ((ll!SUHi’Jlg
onova-tion ingenuity inspilalion
ABN 89106 675156
]
...
Based on the outputs from DRAINS for Pre development, Post development and Mitigated Flow, the basin are shown
to adequately mitigate post development flows at the site outlet for all cases.
Table 2: Detention Basin 1 Flow Mitigation Table
Event Frequency (years) Predevelopment Flows Post Development Flows Mitigated Flows
(DRAINS) (DRAINS) (DRAINS)
1 0.031 m3/s 0.081 m3/s 0.030 m3/s
2 0.050 m3/s 0.104 m3/s 0.036 m3/s
10 0.082 m3/s 0.144 m3/s 0.046 m3/s
50 0.120 m3/s 0.187 m3/s 0.091 m3/s
100 0.136 m3/s 0.207 m3/s 0.136 m3/s
Inflow/Outflow and Storage data for worst case durations for each event modeled have been included in Appendix D.
Table 3: Detention Basin 2 Flow Mitigation Table
Event Frequency (years) Predevelopment Flows Post Development Flows Mitigated Flows
(DRAINS) (DRAINS) (DRAINS)
1 0.036 m3/s 0.093 m3/s 0.036 m3/s
2 0.058 m3/s 0.120 m3/s 0.044 m3/s
10 0.095 m3/s 0.167 m3/s 0.055 m3/s
50 0.139 m3/s 0.217 m3/s 0.097 m3/s
100 0.158 m3/s 0.240 m3/s 0.154 m3/s
Inflow/Outflow and Storage data for worst case durations for each event modeled have been included in Appendix D.
P age 110
Level 2, 39 Sherwood Road [email protected] P: 07 3870 8888
Toowong QLD 4066 www.icubed.com.au F: 07 3870 8988
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 7 of 10 Stormwater Management Report - MCU13/0092Related documentApplication case desk ↗
About this file
- File size
- 60.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.