Council archive · source document
Development Application part 7 of 10 Stormwater Management Report - MCU13/0092
Very large file (60.2 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
i(~ ed ((!fl$UI~j 9
innovati.on ingenuity inspiration
ABN 89106 675156
j. ;: :-I .
.
"
5.4 Catchment Annual Pollutant Loads
An assessment of stormwater quality was undertaken for the developed unmitigated site. The discharge
concentrations of key pollutants from the site were then compared to the WOO’s. The pollutant concentrations were
obtained by running a MUSIC model with the model parameters sourced from Water by Design Music Modelling
Guidelines (Version 1.0 2010). MUSIC is the Model for Urban Stormwater Improvement Conceptualisation,
developed by the MUSIC Development Team of the CRC for Catchment Hydrology.
MUSIC has the ability to simulate quality of runoff from catchments ranging from a single house block up to many
square kilometres, and the effect of a wide range of treatment facilities on the quality of runoff downstream. By
simulating the performance of stormwater quality improvement measures, MUSIC determines if proposed systems
can meet specified water quality objectives.
Table 5 details the MUSIC parameters utilised in running the model.
Table 5: MUSIC Model Parameter Summary
Meteorological Data 40059 COOROY
1973-1983 6 minute BOM
Source Node Commercial
Effective Impervious Area Varies
Effective Pervious Area Varies
Modelling Time Steps 6 Minute
Drainage Link No Routing
Pollutant Concentration Industrial
Soil Properties Industrial
Treatment Devices Stormwater360 Enviopod
Stormwater360 Stormfilter System
Rainwater Tank
MUSIC calculated the following annual pollutant loads for the 4 combined catchments:
Table 6: Annual Pollutant Loads
Pollutant Annual Load
Total Suspended Solids 2700 kg/yr
Total Phosphorus 5.00 kg/yr
Total Nitrogen 30.2 kg/yr
Total Gross Pollutants 217 kg/yr
5.5 Selection of Stormwater Treatment Options
Based on the understanding of Sunshine Coast Regional Council’s requirements for stormwater quality treatment for
industrial sites Enviropods, a Stormfilter System and rainwater tanks have been utilised as the SOlD’s for this site.
P age 113
Level 2, 39 Sherwood Road [email protected] P: 07 3870 8888
Toowong QLD 4066 www.icubed.com.au F: 07 3870 8988
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 7 of 10 Stormwater Management Report - MCU13/0092Related documentApplication case desk ↗
About this file
- File size
- 60.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.