Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

Development Application part 7 of 10 Stormwater Management Report - MCU13/0092

of 119

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (60.2 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

                                                                                                                              ~\
                                                                                          ;CUI;HHl      (QJinnting
                                                                                          innov._tion Ingenuity inspir. lon
                                                                                                    ABN B9106 675156
                                                                                                                              JD3..1’
 7.    Conclusion

The DRAINS modelling indicates that the two detention basins at 85m3 and 100m3 will
                                                                                        adequately mitigate the site
runoff to predevelopment flows.


The MUSIC modelling results in Section 5.6 indicate that Enviropods, a Stormfilter
                                                                                      System and a Rainwater tank will
adequately treat the identified pollutants associated with the Q3 Month stormwater runoff.

The required amount of Enviorpods is:
8 x Enviropods Series 200 Filters


The required size of the Stormfilter System includes:
17 x 460mm cartridges within the precast Stormfilter System


In addition, adherence to the maintenance measures detailed in Section 6 will ensure the
                                                                                           ongoing effectiveness and
longevity of the proposed SQID’s.

Based on the above DRAINS and MUSIC results, 13 Consulting considers that proposed treatment of identified
pollutants with Enviropods, a Stormfilter System and a Rainwater tank and mitigation of flows will satisfy Sunshine
Coast Regional Council’s requirements for stormwater quantity and quality treatment for the
                                                                                            proposed development.




                                                     Pagell1

Level 2, 39 Sherwood Road                     [email protected]                                  P: 07 3870 8888
Toowong QLD 4066                              www.icubed.com.au                                   F: 07 3870 8988

Used in these records

About this file

File size
60.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application part 7 of 10 Stormwater Management Report - MCU13_0092.pdf · 60.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.