Council archive · source document
Development Application part 7 of 10 Stormwater Management Report - MCU13/0092
Very large file (60.2 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
~\
;CUI;HHl (QJinnting
innov._tion Ingenuity inspir. lon
ABN B9106 675156
JD3..1’
7. Conclusion
The DRAINS modelling indicates that the two detention basins at 85m3 and 100m3 will
adequately mitigate the site
runoff to predevelopment flows.
The MUSIC modelling results in Section 5.6 indicate that Enviropods, a Stormfilter
System and a Rainwater tank will
adequately treat the identified pollutants associated with the Q3 Month stormwater runoff.
The required amount of Enviorpods is:
8 x Enviropods Series 200 Filters
The required size of the Stormfilter System includes:
17 x 460mm cartridges within the precast Stormfilter System
In addition, adherence to the maintenance measures detailed in Section 6 will ensure the
ongoing effectiveness and
longevity of the proposed SQID’s.
Based on the above DRAINS and MUSIC results, 13 Consulting considers that proposed treatment of identified
pollutants with Enviropods, a Stormfilter System and a Rainwater tank and mitigation of flows will satisfy Sunshine
Coast Regional Council’s requirements for stormwater quantity and quality treatment for the
proposed development.
Pagell1
Level 2, 39 Sherwood Road [email protected] P: 07 3870 8888
Toowong QLD 4066 www.icubed.com.au F: 07 3870 8988
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 7 of 10 Stormwater Management Report - MCU13/0092Related documentApplication case desk ↗
About this file
- File size
- 60.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.