Development Application part 7 of 10 Stormwater Management Report - MCU13/0092
Very large file (60.2 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
i(lktH! c(>l\suH’ibg
innovation ingenuity Inspltation
ABN 89106 675156
]
.
,
Appendix B -
Calculations
Table 9: Discharge Calculation Table
Catchment Area
Maior Storm Event Q100 Minor Storm Event Q20 Treatable Storm Event Q3 month
Intensit Discharge Intensi! Discharge Intensit Discharge
Catchment A 0.3494 ha 315 mm/hr 0.306 m3/s 247 mmlhr 0.221 m3/s 63 mm/hr 0.043 m3/s
Catchment B 0.1023ha 315 mm/hr 0.090 m3/s 247 mmlhr 0.065 m3/s 63 mm/hr 0.013 m3/s
Catchment C 0.1893 ha 315 mm/hr 0.166 m3/s 247 mmlhr 0.119m3/s 63 mm/hr 0.023 m3/s
Catchment C 0.0094 ha 315 mm/hr 0.008 m3/s 247 mmlhr 0.006 m3/s 63 mm/hr 0.001 m3/s
Sample Calculations
MINOR STORM EVENT Q1(1O
AREA 0.3494ha
RAINFALL INTENSITY
1,00 315mm/hr (From AR&R)
For 5 minute duration
COEFICIENT OF RUNOFF
Cm 1.0
DISCHARGE
Q,OD CIA 0.306 m’!s
360
M!NOR STORM EVENT Q,.
AREA = 0.3494ha
RAINFALL INTENSITY
1,0 247mm!hr (From AR&R)
For 5 minute duration
COEFICIENT OF RUNOFF
C20 0.92
DISCHARGE
Q" CIA 0.090 m’!s
360
TREA TABLE STORM EVENT Q 3month
AREA 0.3494ha
RAINFALL INTENSITY
hmooth 63mm!hr (From AR&R)
For 5 minute duration
COEFICIENT OF RUNOFF
C,month 0.7
DISCHARGE
Q’month CIA 0.043 m’!s
360
P age 120
level 2, 39 Sherwood Road [email protected] P: 07 3870 8888
Toowong QLD 4066 www.icubed.com.au F: 07 3870 8988
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 7 of 10 Stormwater Management Report - MCU13/0092Related documentApplication case desk ↗
About this file
- File size
- 60.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.