4. Emergency Procedures
4.1 Spill Procedures
In the event of a spill discharging into
any gully pit all sediment is to be extracted and the filter bags are to be
removed and replaced with rejuvenated filter bags. Normal
operation procedures apply to additional cleaning
as a result of spills.
4.2 Blockages
In the unlikely event of surface flooding around a gully
pit fitted with an Enviropod the following steps should
be carried out:
Check Enviropod over flow bypass. The Enviropod filter has been
designed with an overflow mechanism built
into the filter box. If surface flooding still exists check the overflow slots underneath the rubber seal. If
debris
is lodged in the overflow slots these can be easily cleared
by hand or steel rod.
If overflow is clear and surface flooding still exists remove
Enviropod and check outlet pipe for blockages.
Removal of the Enviropod may be difficult if the filter is clogged and the
Enviropod is holding water. If the
filter is clogged, brush the side walls of the filter with a yard broom or similar. This will
dislodge particles
trapped at the interface allowing contained water to flow through the filter.
If the outlet pipe is blocked, it is likely that a gully sucker truck will be
required to unblock it. Debris should be
removed from the Enviropod with the gully sucker truck before removal of the
Enviropod filter.
If a gully sucker truck is not available and the Enviropod needs to be removed
by hand, follow the steps below:
Remove excess debris by hand or brush the side of the filter.
Lift and place filter ring through the filter box and into cage.
Remove Filter box.
Lift cage containing filter bag and ring out ofthe pit.
Unblock outlet pipe.
(92011 Stormwater360
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 7 of 10 Stormwater Management Report - MCU13/0092Related documentApplication case desk ↗
About this file
- File size
- 60.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.