Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

Development Application part 7 of 10 Stormwater Management Report - MCU13/0092

of 119

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (60.2 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

                                                                                       iCllbe.<! c<:ql$utlh 9
                                                                                                                          ~
                                                                                       innovation ingel1uiq.inspiration
                                                                                                 A8N 89106 675 15{i       ~
1.     Introduction

1.1 Background


i3 consulting was commissioned by Multispan Australia to undertake the stormwater quality documentation required
for the development approval application for the proposed development at Lot 94 Rufous Street, Peregian Beach.
This report covers the stormwater quality for the community house carpark for the development approval. The
proposed development is shown on drawing 13-024-C31 in Appendix A.

1.2 Objectives


This report has been compiled to address the stormwater quality and quantity requirements of the Water Sensitive
Urban Design Guidelines for South East Queensland, the Environmental Protection Act 1994 and the Environmental
Protection (Water)Policy 1997.


1.3 Scope


The scope of this report encompasses in detail the post construction phase of development; however the
construction phase is briefly addressed.




                                                    Page 15

Level 2, 39 Sherwood Road                    [email protected]                                 P: 07 3870 8888
Toowong QLD 4066                            www.icubed.com.au                                   F: 07 3870 8988

Used in these records

About this file

File size
60.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application part 7 of 10 Stormwater Management Report - MCU13_0092.pdf · 60.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.